A259 road

(Redirected from A259)

The A259 is a road on the south coast of England passing through Hampshire, West Sussex, East Sussex, and Kent, and is the longest Zone 2 A road in Great Britain. The main part of the road connects Brighton, Peacehaven, Eastbourne, Hastings, Rye, and Folkestone.

A259 shield
A259
A259, Eastbourne Road - geograph.org.uk - 1383731.jpg
A259 Eastbourne Road
Route information
Length118.5 mi (190.7 km)
Major junctions
East endFolkestone
Major intersections M20
A20
A260
A2033
A2034
A2070
A268
A2101
A21
A2102
A2036
A269
A2690
A27
A2290
A2021
A2040
A2270
A26
A29
A23
A2010
A2023
A283
A24
A2032
A280
A284
A286
West endEmsworth
Location
CountryUnited Kingdom
Primary
destinations
Bexhill-on-Sea
Bognor Regis
Brighton
Chichester
Eastbourne
Folkestone
Hastings
Littlehampton
Rye
Shoreham-by-Sea
Worthing
Road network

The road is below the expected standard of a trunk road used by HGVs and a frequent cause of congestion and disruption and has been documented as one of the most dangerous roads in South England.

Description

edit
 
A hairpin bend on the trunk road section of the A259 near Winchelsea

The A259 is a busy two-lane road running along the south coast of England; part is roughly parallel to the A27 road. The A259 runs east from Emsworth in Hampshire, into West Sussex via Chichester, Bognor Regis, Littlehampton, Ferring, Worthing, Lancing, Shoreham-by-Sea, into the Unitary Authority of Brighton and Hove which incorporates Portslade, Hove and Brighton, and on into the East Sussex towns of Peacehaven, Newhaven, Seaford, Eastbourne, Pevensey, Bexhill-on-Sea, Hastings and Rye. Over the border in Kent, it continues through New Romney and Hythe to terminate at Folkestone.

The road passes through Winchelsea, England's first new town. The road has two sections with Trunk Road status (between Bognor Regis and Chichester, and between Pevensey and the A2070 at Brenzett) and formed part of the formerly designated South Coast Trunk Road.[1] This section of A259 is almost entirely a single-carriageway, with only a short stretch of urban dual-carriageway in Bexhill.

Landmarks on the A259 include The Body Shop headquarters outside of Littlehampton, Shoreham Power Station, West Pier, and the Palace Pier in Brighton, Telscombe Cliffs near Peacehaven, and Saltdean, Cuckmere Haven between Seaford and Eastbourne and the Romney, Hythe and Dymchurch Railway which shares the route for 8 miles (13 km) from New Romney to Hythe.

Safety

edit

In June 2008, a 12 miles (19 km) stretch of the A259 between Hastings and Eastbourne was named by EuroRAP as the most dangerous road in the South East of England.[2][3] The report cited 47 fatal or serious collisions from 2004 to 2006 as a key issue.[4] In 2011, the BBC named the road as the "most crash prone A road" in the UK with 7,721 crashes and 120 deaths over 12 years from 1999 to 2010, an average of 65 crashes per mile.[5]

Traffic

edit

The road crosses the Marshlink line between Ashford International and Rye at two level crossings in quick succession. In the summer, this can create significant congestion where goods vehicles between the towns mix with day traffic to popular holiday destinations such as Camber Sands. Portions of the road along Romney Marsh suffer from subsidence into the dikes that run alongside the main carriageway.[6]

History

edit

What is now the A259 east of Rye was developed after the opening of the Monk Bretton Bridge in 1893, which provided a quicker route through Romney Marsh.[7] The original draft route of the A259 was from Dover to Eastbourne. It was extended westwards to Worthing after the local engineering division informed the Ministry of Transport they would like a single number to represent the coast road.[8]

In 1989 the government proposed to dual the road from Pevensey to Bexhill and make other corridor improvements as detailed in their Roads for Prosperity white paper and would have included the following elements: 'Guestling and Icklesham bypass', the 'Winchelsea bypass', 'Rye bypass', 'Hamstreet bypass', 'A259 New Romney bypass' and the 'A259 St. Mary's Bay and Dymchurch bypass'.[9] This scheme along with many others proposed at the time were shelved in 1996-7 after a number of major road protests in the UK. Of these only the Ham Street bypass (A2070) was eventually constructed.[6]

Plans for a 'Hastings Bexhill bypass' which would have provided a dual-carriageway from the Pevensey roundabout passing to the north of Bexhill and Hastings to join the current A259 near Icklesham at a cost of £120-£130 million were rejected in 2001. The scheme, which was supported by the South East England Regional Assembly and by the Deputy Prime Minister, John Prescott was opposed by English Nature who highlighted the damage to a number of Sites of Special Scientific Interest (SSSIs), including the High Weald Area of Outstanding Natural Beauty. They were also concerned about the negative effect the scheme would have on several ancient woodlands and the habitats of the dormouse and great crested newt.[10][11]

Following the upgrade of the A2070 road in the late 1990s, the section between Brenzett and Folkestone was de-trunked in 2003 (i.e. removed trunk road status) and control reverted to Kent County Council.[12]

Other development proposals for the road were considered in 2004.[13]

In 2021, Eccy de Jonge, a British author, published an account of policing practices in Great Britain and elsewhere. In a chapter on road deaths, the author reveals two pedestrian deaths on the A259 that occurred in 2013, one near Seaford, East Sussex, the other in Hastings.[14]

Proposed developments

edit
edit
 
Proposed route of the Bexhill Hastings Link Road

In 2008, East Sussex County Council proposed building a new link road between Bexhill and Hastings, to form a 3.5 miles (5.6 km) long road from its junction with the A259 in Bexhill, to a junction with the B2092 Queensway in Hastings.[15]

The South East Regional Assembly included the scheme within its Regional Funding Advice package.[16] This was provisionally signed off in July 2009 by the Department for Transport, with the caveat that individual schemes would still need to be assessed for value for money and compatibility with greenhouse gas emission targets.[17] Although originally estimated at £45 million, the scheme was now expected to cost over £100 million. £33 million was expected to come from developer contributions, but the County Council was unable to obtain them. "Although opportunities will be explored to seek developer contributions in the future, at the present it has been considered prudent to plan to fund all future local contributions from the County Council's capital programme".[18]

The county council said: "The driving force of the scheme is to enable essential economic regeneration for Bexhill and Hastings, which is currently compromised by the poor accessibility within and between the two towns... the Bexhill Hastings Link Road would make a major contribution to meeting the need to improve access between the towns and linking Trunk Roads which serve the area". They also identified that the scheme would provide "faster and more reliable access to the Conquest Hospital", "easier access to jobs", "create access to much-needed additional housing"; and that it would "re-route traffic from less suitable roads" and "reduce the number of accidents on local roads".[19]

A number of organisations objected to the scheme. The Hastings Alliance,[20] which is supported by 11 national bodies, including the Campaign for the Protection of Rural England, the Council for National Parks, and WWF-UK, and also 16 local groups[21] pointed to the Hastings Five Point Plan, commissioned by the South East Regional Assembly, which found that the key requirement for regeneration is to "improve the strategic accessibility of Hastings – that is Hastings' access to London, other major towns, and other parts of the South East" and says that improving rail links are fundamental to regenerating that area.[22] In addition they objected to the impact on the Combe Haven valley, a Site of Special Scientific Interest, which would be cut in two by the scheme. The Campaign for Better Transport say that, contrary to government guidance, the county council had "never really considered whether building a link road is the best way to improve transport on the Sussex coast".[23] The Woodland Trust also objected, as the road would seriously impact on the Marline Valley Woods Site of Special Scientific Interest, an ancient ghyll woodland. This sort of woodland is only found on steep sided valleys and are hugely important for wildlife but are highly sensitive to pollution. The road would also pass within metres of Church wood (ancient woodland), and other nationally and locally protected wildlife sites.[24] Friends of the Earth were concerned that building roads generates more traffic in the surrounding area, and would result in more vehicles using the roads to the north creating pressure in for communities on the approach roads[25] (such as the A21 and the A28). They also believed it would create pressure to build a 'Hastings Eastern Bypass' which would pass through the High Weald Area of Outstanding Natural Beauty, which they claim is one of Britain's finest landscapes. The Sussex Wildlife Trust "strongly" objected to the road stating that "the environmental damage that will result from this scheme is unacceptable and will alter the ecology of the Combe Haven valley for ever."[26]

A public inquiry into the scheme started on 10 November 2009.[27]

When the Bexhill to Hastings Link Road was eventually approved, then changes also required to the A21 Baldslow / Queensway (which leads to the link road).

The entire project was completed in December 2015 at a cost of around £120 million.[28]

'£5m improvements near Shoreham'

edit

In 2009, Brighton and Hove City Council, Adur District Council and West Sussex County Council, and the Shoreham Port Authority proposed to spend a £5million grant from the Department for Transport to 'improve the A259 in relation to a new project to build 10,000 homes scheme.[29]

References

edit
  1. ^ "Highways Agency Network Map". Highways Agency. November 2011. Archived from the original on 20 January 2013. Retrieved 18 December 2012.
  2. ^ "Great Britain Results 2008". EuroRAP. Archived from the original on 10 February 2012.
  3. ^ "Britain's most dangerous roads revealed". Autotrader.
  4. ^ "A259 the worst road in Sussex". Eastbourne Herald. 1 July 2008. Retrieved 3 October 2019.
  5. ^ "Every death on every road". BBC News. 2 December 2011.
  6. ^ a b "No by-pass? How about a link road". Rye News. 25 November 2016. Retrieved 2 March 2018.
  7. ^ Cooksey, Laurie. "The Monkbretton Road Bridge". Rye's Own. Retrieved 23 November 2017.
  8. ^ "Search results for MT 39/241". The National Archives.
  9. ^ "House of Commons Hansard Debates". 13 July 1989.
  10. ^ "Hastings/Bexhill bypass 'flawed'". BBC News. London. 15 February 2001. Retrieved 24 March 2010.
  11. ^ "Ruling Splits Opinion". BBC News. London. 12 July 2001. Retrieved 24 March 2010.
  12. ^ "The A259 Trunk Road, (Brenzett to M20 Junction 13, Folkestone) (Detrunking) Order 2003". UK Government. Retrieved 6 June 2012.
  13. ^ "Highways Agency A259-A2070 Route Management Strategy" (PDF). East Sussex Council. 18 August 2019.
  14. ^ Eccy de Jonge - Policing and Public Trust" Exposing the Inner Uniform. Rowman & Littlefield. 2021.
  15. ^ "Bexhill to Hastings link road". East Sussex County Council. Retrieved 21 January 2008.
  16. ^ "South East England Regional Funding Advice" (PDF). South East Regional Assembly. Archived from the original (PDF) on 2 July 2010. Retrieved 10 November 2009.
  17. ^ "Response letter to South East England Regional Funding Advice" (PDF). Department for Transport. Archived from the original (PDF) on 6 August 2009. Retrieved 10 November 2009.
  18. ^ "Hastings Bexhill Major Scheme Business Case" (PDF). East Sussex County Council. Archived from the original (PDF) on 23 February 2012. Retrieved 10 November 2009.
  19. ^ "Design and Access statement (section 2.1.1 - 174mb)" (PDF). East Sussex County Council. Archived from the original (PDF) on 15 October 2011. Retrieved 10 November 2009.
  20. ^ "Hastings Alliance". Hastings Alliance.
  21. ^ "Supporters". Hastings Alliance. December 2010.
  22. ^ "Prosperity for Hastings" (PDF). South East Regional Assembly. Archived from the original (PDF) on 23 February 2012.
  23. ^ "Reject Bexhill-Hastings link road". Campaign for Better Transport. Archived from the original on 24 July 2011.
  24. ^ "Bexhill to Hastings Link Road". Woodland Trust. Archived from the original on 7 May 2009.
  25. ^ "Like a bad penny. why Friends of the Earth opposes the Bexhill" (PDF). Friends of the Earth. Retrieved 9 November 2009.
  26. ^ "Bexhill Hastings Link Road". Sussex Wildlife Trust. Archived from the original on 19 August 2013. Retrieved 19 August 2013.
  27. ^ "Bexhill-Hastings link road cash sign-off slated by campaigners". planningresource.co.uk.
  28. ^ "Hastings Bexhill £120m link road opens amid protests". BBC News. 17 December 2015.
  29. ^ "Councils vow to revive Shoreham Harbour plans".
edit
KML is from Wikidata