This article needs additional citations for verification. (January 2020) |
Arkansas Highway 189 (AR 189, Ark. 189, and Hwy. 189) is the designation for a state highway in the U.S. state of Arkansas. The route is split into four sections, all of which are located in southeast Arkansas. The first section is a very short highway that begins at US Highway 425 (US 425) in Hamburg and travels to the Ashley County Fairgrounds just south of Hamburg. The second section begins at US 425, US 82 and AR 8 in Hamburg and ends at AR 133 near the unincorporated community of Milo, or about six miles (9.7 km) southwest of Fountain Hill. The third section begins at US 278 in Warren and ends at US 63 in Warren. The fourth and longest section begins at AR 8 near the unincorporated community of Orlando, or about five miles (8.0 km) northwest of Warren and ends at Pump Station Road in rural Cleveland County.
Route information | ||||
---|---|---|---|---|
Maintained by ArDOT | ||||
Section 1 | ||||
Length | 0.9 mi (1,400 m) | |||
West end | CR 19 in Hamburg | |||
East end | US 82 / US 425 in Hamburg | |||
Section 2 | ||||
Length | 9.9 mi (15.9 km) | |||
South end | US 82 / US 425 / AR 8 in Hamburg | |||
North end | AR 133 near Milo | |||
Section 3 | ||||
Length | 3.8 mi (6.1 km) | |||
South end | US 278 in Warren | |||
North end | US 63 / US 63B near Warren | |||
Section 4 | ||||
Length | 23.8 mi (38.3 km) | |||
South end | AR 8 near Orlando | |||
North end | Pump Station Road | |||
Location | ||||
Country | United States | |||
State | Arkansas | |||
Counties | Ashley, Bradley, Cleveland | |||
Highway system | ||||
|
Route description
editSection 1
editThe first section of AR 189 begins at US 425 in Hamburg, and runs from east to west, rather than north to south. The route heads directly towards the west before reaching its western terminus at the Ashley County Fairgrounds just south of Hamburg. The route is very short, only about 0.9 miles (1.4 km) long.[1]
Section 2
editThe second section of AR 189 begins at US 425, US 82, and AR 8 in Hamburg. The route heads west and eventually towards the northwest before reaching its northern terminus at AR 133 near Milo. The route is about 9.9 miles (15.9 km) and does not intersect any other highways or communities.[1]
Section 3
editThe third section of AR 189 begins at US 278 in Warren. The route heads towards the northwest for about 3.8 miles (6.1 km) before reaching its northern terminus at US 63 just north of Warren. The route is a bypass around the city of Warren and does not intersect any other highways or communities.[2]
Section 4
editThe fourth and longest section of AR 189 begins at AR 8 near Orlando. The route travels north for about 18 miles (29 km) before running concurrently with AR 97 for about 0.5 miles (0.80 km) through the town of Kingsland. The route intersects US 79 shortly after and continues to head northwest before reaching its northern terminus at Pump Station Road in rural Cleveland County. The route is about 23.8 miles (38.3 km) long.[2][3]
Major intersections
editCounty | Location | mi | km | Destinations | Notes | ||
---|---|---|---|---|---|---|---|
Ashley | Hamburg | 0.0 | 0.0 | US 425 / US 82 – Hamburg, Crossett, Monticello | Eastern terminus | ||
0.9 | 1.4 | CR 19, Ashley County Fairgrounds | Northern terminus | ||||
Gap in route | |||||||
Ashley | Hamburg | 0.0 | 0.0 | US 425 / US 82 / AR 8 – Hamburg, Lake Village | Southern terminus | ||
Milo | 9.9 | 15.9 | AR 133 – Crossett, Fountain Hill | ||||
Gap in route | |||||||
Bradley | Warren | 0.0 | 0.0 | US 278 – Warren, Monticello, Hampton | Southern terminus | ||
3.8 | 6.1 | US 63 / US 63B south (Myrtle Street) – Pine Bluff, El Dorado | Northern terminus, US 63B northern terminus | ||||
Gap in route | |||||||
Bradley | Orlando | 0.0 | 0.0 | AR 8 – Warren, Fordyce | Southern terminus | ||
Cleveland | Kingsland | 18.0 | 29.0 | AR 97 south – Marks' Mills State Park | South end of AR 97 concurrency | ||
18.5 | 29.8 | AR 97 – Kingsland | North end of AR 97 concurrency | ||||
19.2 | 30.9 | US 79 – Fordyce, Rison, Pine Bluff | |||||
| 23.8 | 38.3 | Pump Station Road | Northern terminus | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
References
edit- ^ a b Planning and Research Division (n.d.). General Highway Map: Ashley County (PDF) (Map). 1:62,500. Little Rock: Arkansas State Highway and Transportation Department.
- ^ a b Planning and Research Division (n.d.). General Highway Map: Bradley County (PDF) (Map). 1:62,500. Little Rock: Arkansas State Highway and Transportation Department.
- ^ Planning and Research Division (n.d.). General Highway Map: Cleveland County (PDF) (Map). 1:62,500. Little Rock: Arkansas State Highway and Transportation Department.
External links
edit- Media related to Arkansas Highway 189 at Wikimedia Commons