Bus rapid transit creep

(Redirected from BRT creep)

Bus rapid transit creep (BRT creep) is a phenomenon where bus systems that fail to meet the requirements for being considered "true bus rapid transit" are designated as bus rapid transit regardless. These systems are often marketed as a fully realized bus rapid transit system, but end up being described as more of an improvement to regular bus service by proponents of the "BRT creep" term. The Institute for Transportation and Development Policy published several guidelines in an attempt to define what constitutes the term "true BRT", known as the BRT Standard, in an attempt to avert this phenomenon.

S79 SBS bus at Staten Island Mall. The degradation of the Select Bus Service (SBS) is cited as an example of BRT creep. Note the lack of ticket machines or level boarding.

Proponents of the "Bus Rapid Transit" term cite it as a form of mass transit that uses buses in a dedicated right-of-way, ideally providing speed and volume of service similar to light rail. A commonly cited advantage of BRT is the lack of need to build new rail infrastructure, as new rail has greater initial capital costs than using existing roads and cannot be changed easily.

The flexibility of BRT, with its greater similarity to other forms of bus transportation, also means that there are fewer obstacles to removing expensive or difficult-to-implement features such as dedicated lanes. On the downside, however, this flexibility can lead to service enhancements being whittled away in a manner that is not possible once rail solutions have been built. (Transit agencies have incentive to strip down service after a BRT route is initially presented, partially because BRT might have up to 24% higher operating costs than rail solutions of a similar size according to a parametric cost model, if traffic signal priority is not effective. On the other hand, "For trunk line capacities below about 1,600 spaces per hour, the headway-versus-cost trade-off favors BRT".[1]) This type of stripping down service is known as BRT creep.

Description

edit

The most extreme versions of BRT creep lead to systems that cannot even truly be recognized as "Bus Rapid Transit". For example, a rating from the Institute for Transportation and Development Policy (ITDP) determined that the Boston Silver Line was best classified as "Not BRT" after local decision makers gradually decided to do away with most BRT-specific features.[2]: 45  The study also evaluates New York City's Select Bus Service (which is supposed to be BRT-standard) as "Not BRT".[2]: 47 

Some American systems reviewed had so few essential characteristics that calling them a BRT system at all does a disservice to efforts to gain broader adoption of BRT in the United States.

Worried about similar circumstances, Virginia writer Kevin Beekman urges residents in areas planned for BRT development to use the ITDP scoring worksheet (BRT Standard) as an assessment tool.[3] Another Washington-area writer, Dan Reed, furthers this sentiment, writing that if BRT creep is allowed to reach its full conclusion, it's "bad for commuters, but it's also bad for taxpayers who were sold a high-end service only to find out that we just painted the buses a different color".[4]

According to Dan Malouff, a transit planner who was one of the earliest people to use the phrase, the slippery slope towards BRT creep varies widely from system to system. He says in a piece republished by The Washington Post that "there are a thousand corners like that you can cut that individually may or may not hurt too much, but collectively add up to the difference between BRT and a regular bus". Major compromises in service are highlighted by one or more common symptoms: buses run in shared general purpose lanes or HOV lanes rather than dedicated lanes, using traditional bus stops instead of full-featured stations, eliminating fare pre-payment and all-door boarding which slows passenger boarding, and offering no priority at traffic lights.[5]

Detroit writer Michael Jackman mentions the removal of "signal pre-emption, dedicated lanes separated by concrete berms, heated, ADA-compliant stations, preticketing, and more" as indicators of BRT creep.[6]

Counterarguments, remediation, and alternative labels

edit

Author and activist Matthew Yglesias has argued in Slate Magazine that BRT creep is a very real worry, but that the issue is not "a problem with buses, it's a problem with cheapskates".[7]

Houston Tomorrow points out some ways local legislation can prevent BRT creep: "The new section on Bus Rapid Transit specifically defines it as having a separated right-of-way (at least for the majority of the line and during peak periods), defined stations, short headways and signal priority."[8]

One drawback to the phrase is that it uses "creep" in a way that is contradictory to other terms such as "scope creep", "feature creep", and "mission creep". "BRT creep" refers to how features can be eaten away due to lack of funding or political will, while the other terms typically refer to an expanding scope. This counterintuitive phrasing is due to the term "BRT" itself having a "creeping" expansion over systems not properly evaluated as such, rather than the features of such systems.

Additional examples

edit
  • In Seattle, plans for BRT lines were scaled back to allow "mixed traffic" operation on large portions of the lines[9][10]
  • In San Jose, the Alum Rock-Santa Clara BRT line includes only one mile of dedicated bus lanes along the seven-mile route, while plans for a second BRT route along El Camino saw the proposed dedicated bus lanes dropped before the project itself was eventually cancelled.[11][12]
  • In Portland, dedicated lanes were scrapped early in the planning process, while the BRT label was kept.[13]
  • In Delhi, dedicated lanes got built, only to be rolled back by a pair of judges who did not understand why cars should not drive in them. That decision was eventually reversed, after considerable damage to the BRT line's reputation for speed.[14]
  • In Curitiba, Brazil, Rede Integrada de Transporte has failed to integrate its growing suburbs into a coherent regional plan.[15][16][17][18][19]
  • In New York City[20] and East Lansing,[21] plans for physically separated lanes were discarded in favor of difficult-to-enforce painted curbside lanes.
  • In Cleveland, the HealthLine—often cited as a BRT success story—BRT creep nonetheless occurred when traffic signal priority was turned off, after complaints from drivers.[22]
  • In Boston, the Silver Line is branded as BRT but lacks most BRT-quality features such as enforced exclusive bus lanes, high level platforms, or off-vehicle fare collection. Notably, Route SL1 operates in mixed traffic along a routing that has been widely criticized as inefficient and unnecessarily convoluted, and includes a mixed-traffic freeway segment that often experiences severe congestion.[23]
  • In the Denver-Boulder area of Colorado, the "Flatiron Flyer," which was originally pitched as a BRT service, gradually did away with advance ticketing, signal priority and most dedicated lanes.[24]
  • In Fresno, California, administrators eliminated exclusive bus lanes, level boarding, stations and short headways, while continuing to use "BRT" as a descriptor for what eventually amounted to a normal bus line with two-door boarding.[25]
  • In Las Vegas, the Regional Transportation Commission of Southern Nevada's four lines branded as BRT lack many key modal features. The SDX (Strip-Downtown Express), Boulder Highway Express (BHX), and Sahara Express (SX) routes operate in dedicated lines only along portions of their route, have simplified "stops" instead of stations, and no longer use specifically branded vehicles. A fifth line, the MAX line along Las Vegas Blvd North and branded as an early BRT system, was later converted to a higher frequency local route.
  • In San Francisco, the Van Ness Bus Rapid Transit project omits raised platforms for level boarding; station platforms will be built at standard sidewalk height instead.[26]
  • In Buenos Aires, Argentina, the Metrobus lacks of pre-pay feature to reduce delays on passengers boarding, the buses don't get any priority at intersections neither extended green phase or reduced the red phase. Platform-level is not different from regular sidewalks.[27]
  • In the Minneapolis/St. Paul region there are two routes marketed as BRT, but do not actually achieve the standards of BRT. The first is the METRO Red Line, which opened in 2013 between Apple Valley, Minnesota and Mall of America in the southern suburban region of Minneapolis. Headways are every 20 minutes, there is no off-board fare payment, and buses do not have a dedicated right-of-way (there are shoulder lanes that buses may use during traffic backups). The other route is the A Line (Minnesota), which opened in 2016 between South Minneapolis and Roseville, Minnesota. The A Line is locally referred to as arterial BRT (ABRT). While the entire route has no dedicated right-of-way, headways are every 10 minutes and there is off-board fare payment.
  • In Guangzhou, China, authorities decided to open GBRT lanes to mixed traffic during peak hours; as a result, the BRT system's average peak hour speeds dropped to 16 km/h from their previous average of 20 km/h.[28]
  • In Manila, the EDSA busway has no off board fare collection, level boarding, poor disabled access in many stations with no elevators nor ramps, and many buses do not have doors on the left, despite most of the stations being island platforms. Fares are also unstandardized since operation is shared between dozens of private companies.
  • In Auckland, New Zealand, the dedicated Northern Busway only runs between Albany and Akoranga bus stations; services north to the Hibiscus Coast and south to the Auckland CBD are forced to operate in mixed traffic. Northern Busway services also still use on-board fare collection (albeit with the contactless AT HOP card).
  • In Melbourne, Australia, the SmartBus network is labelled as a premium bus service, with four of the nine SmartBus routes marketed as Doncaster Area Rapid Transit (DART), however all nine SmartBus routes are run on shared roads, have on-board fare collection, lack level boarding, have poor to nonexistent traffic light priority, poor service frequency (every 30 minutes on evenings and weekends), and bus lanes in Lonsdale Street and Hoddle Street are only temporary, being shared with cars after 7PM and on weekends.
  • In Memphis, Tennessee, mConnect is branded as BRT despite dedicated bus lanes being planned only along B.B. King Blvd. and Second St, less than 15% of the total planned route.[29]
  • In Austin, Texas, two routes marketed as BRT were introduced under the MetroRapid banner in 2014.[30] Outside of a short stretch of transit-priority lanes shared by other local and commuter routes through Downtown, both the 801 and 803 operate in mixed traffic.[31] Subsequent MetroRapid investments were included in Capital Metro's Project Connect high-capacity transit plan as "Bus Rapid Transit Light"[32] but which are now referred to in official documents simply as MetroRapid.[33]
  • In Niigata, Japan, authorities planned to introduce a "BRT system" to tackle the problem of lack of bus drivers. The system was to improve efficiency by merging routes on the main bus corridor into "BRT Bandaibashi Line", introducing articulated buses, shortening branch routes and building weather-protected interchange stations. Construction of bus lanes is scrapped during the planning process, and only some of the stations with weather-protected roofs but no platform-level boarding were built. A social experiment was conducted in 2016 by building temporary bus lanes and median aligned bus stops, but failed due to the severe congestion of normal traffic. Furthermore, interchange between buses was not welcomed by mainly the elder population. Authorities eventually stopped branding the corridor as "BRT", converted the service to local routes and re-extending branch routes to the downtown.
  • In Tokyo, Japan, the Tokyo Metropolitan Government introduced the "Tokyo BRT" as the main transportation connecting the downtown and the bay area, including HARUMI FLAG, the residential area converted from the former Tokyo 2020 Olympic Village. It was planned that dedicated bus lanes and full-featured stations with ticket machines are built. However, due to the Covid-19 pandemic and inflation brought, most of the bids for the constructions ended up unsuccessful. It turned out that only Shimbashi Station was built with a roof, while only simplified bus stops were built for other stops and the system lacks most BRT-features.
  • In Calgary, Alberta, Canada, Calgary Transit operates several routes marketed as BRT, however they lack many of the key elements that are typically involved in a BRT operation. Route 300 with service to Calgary International Airport from downtown is particularly egregious, lacking dedicated lanes, off-board fare care collection, heated shelters or signal preemption.

See also

edit

References

edit
  1. ^ Bruun, Eric (1 January 2005). "Bus Rapid Transit and Light Rail: Comparing Operating Costs with a Parametric Cost Model". World Transit Research. Retrieved 24 April 2021.
  2. ^ a b c Weinstock, Annie; Hook, Walter; Replogle, Michael; Cruz, Ramon (May 2011). Recapturing Global Leadership in Bus Rapid Transit: A Survey of Select U.S. Cities (Report). Institute for Transportation and Development Policy. Retrieved 23 May 2014.
  3. ^ "How will Alexandria's BRT fare?". www.arlandria.org. Retrieved 9 January 2018.
  4. ^ Reed, Dan. "To build support for MoCo BRT, start with the basics". Retrieved 6 March 2013.
  5. ^ Malouff, Dan (3 September 2011). "The problem of BRT creep". The Washington Post. Archived from the original on 12 April 2013. Retrieved 6 March 2013.
  6. ^ Jackman, Michael. "The trouble with the RTA plan". Detroit Metro Times. Retrieved 22 September 2016.
  7. ^ Yglesias, Matthew (7 August 2013). "Menace of BRT creep". Slate. Retrieved 1 May 2014.
  8. ^ Dietrichson, Matt (7 July 2012). "How will the new transpo bill affect transit policy?". Retrieved 1 May 2014.
  9. ^ Shaner, Zach (11 November 2015). "Whittling Away at Madison BRT". Seattle Transit Blog. Retrieved 5 October 2016.
  10. ^ Elledge, John. "What is Bus Rapid Transit – and why doesn't every city want one?". CityMetric. Retrieved 6 October 2016.
  11. ^ "Alum Rock-Santa Clara Bus Rapid Transit". www.vta.org. Retrieved 29 October 2018.
  12. ^ "El Camino Real BRT Project". www.vta.org. Retrieved 29 October 2018.
  13. ^ Njus, Elliot (4 December 2015). "Portland's next ride: super-sized buses that act like light rail". Advance Newspapers. Retrieved 30 November 2016.
  14. ^ "Allow cars and autos on BRT bus lane: High court". 16 March 2012. Retrieved 9 January 2018.[dead link]
  15. ^ "Has South America's Most Sustainable City Lost Its Edge?". Bloomberg. 6 June 2012. Retrieved 9 January 2018.
  16. ^ "Cracks in the Curitiba Myth". Retrieved 9 January 2018.
  17. ^ "Lessons from a South American Bus Rapid Transit system". Retrieved 9 January 2018.
  18. ^ "What is Bus Rapid Transit – and why doesn't every city want one? - CityMetric". www.citymetric.com. Retrieved 9 January 2018.
  19. ^ "What the World's First Bus Rapid Transit System Can Teach Us". 18 May 2016. Retrieved 9 January 2018.
  20. ^ "With No Separated Busway on 34th Street, What's Next for BRT in NYC?". 1 April 2011. Retrieved 9 January 2018.
  21. ^ "BRT Alignment Selected | CATA-BRT". Archived from the original on 13 September 2015. Retrieved 11 September 2015.
  22. ^ Ross, Benjamin. "Big Philanthropy Takes the Bus". Dissent Magazine. Retrieved 5 October 2016.
  23. ^ Weinstock, Annie; et al. "Recapturing Global Leadership in Bus Rapid Transit" (PDF). Institute for Transportation and Development Policy. Archived from the original (PDF) on 3 May 2012. Retrieved 22 September 2014. The majority of the [Boston] system lacks basic BRT features.
  24. ^ Sachs, David (6 January 2016). "RTD's Flatiron Flyer Is an Upgrade, But Don't Call It "Bus Rapid Transit"". StreetsBlog Denver. StreetsBlog. Retrieved 4 November 2016.
  25. ^ Sinclair, James (20 April 2014). "Stop and Move: No one noticed, but Fresno killed its proposed BRT system". Retrieved 9 January 2018.
  26. ^ Cabanatuan, Michael (15 July 2014). "Muni opposition hinders bus rapid transit". Hearst Communications. San Francisco Gate. Retrieved 22 May 2016.
  27. ^ http://www.buenosaires.gob.ar/movilidad/metrobus.html [dead link]
  28. ^ "Mixed traffic allowed to use BRT lanes in Guangzhou". www.fareast.mobi. Retrieved 8 December 2018.
  29. ^ "About". memphisinnovationcorridor.com. Retrieved 18 October 2021.
  30. ^ "After Ridership Drops, Cap Metro Looking to Tweak Rapid Bus System". KUT Radio, Austin's NPR Station. 25 August 2014. Retrieved 22 March 2022.
  31. ^ "Austin's Rapid Bus Struggles After a Slow Start". StateImpact Texas. Retrieved 22 March 2022.
  32. ^ "AECOM wins Orange Line preliminary engineering contract". Austin Monitor. 2 April 2019. Retrieved 22 March 2022.
  33. ^ "A New Transit Plan for Austin - Project Connect by Capital Metro". ProjectConnect. Retrieved 22 March 2022.