Bakırköy railway station (Turkish: Bakırköy istasyonu) is the main railway station in Bakırköy, Istanbul. Located 12.6 km (7.8 mi) west of Sirkeci station, the station was serviced by Istanbul suburban commuter trains as well as TCDD regional trains to Kapıkule, Çerkezköy and Uzunköprü. The station was closed in March 2013 and subsequently demolished to make way for a larger, more modern station as part of the Marmaray project. The rebuilt station was opened on 12 March 2019.[2] The station has an interchange with Özgürlük Meydanı station of the M3 metro line.
Bakırköy | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||
Location | İstasyon Cd, Cevizlik Mh, İstanbul, Turkey | ||||||||||||||||||||
Coordinates | 40°58′49″N 28°52′20″E / 40.980374°N 28.872133°E | ||||||||||||||||||||
Owned by | Turkish State Railways | ||||||||||||||||||||
Operated by | TCDD Taşımacılık | ||||||||||||||||||||
Line(s) | Istanbul-Pythion railway | ||||||||||||||||||||
Platforms | 2 island platforms | ||||||||||||||||||||
Tracks | 4 | ||||||||||||||||||||
Connections | Istanbul Metro: at Özgürlük Meydanı İETT Bus: 50B, 73B, 76, 76B, 76C, 76V, 76Y, 79B, 89YB, 94Y, 98, 98A, 98AB, 98B, 98D, 98E, 98G, 98H, 98K, 98M, 98MB, 98S, 98T, 98TB, 98Y, 146 Istanbul Minibus: Bakırköy-Bakırköy Metro, Bakırköy-İkitelli, Bakırköy-İkitelli Köyiçi, Bakırköy-İSTOÇ, Bakırköy-Polis Lojmanları, Bakırköy-Soğanlı, Bakırköy-Yenibosna Metro, Bakırköy Metro-Barbaros Mahallesi, Bakırköy Metro-İSTOÇ, Bakırköy Metro-Ormantepe-Kocasinan Mahallesi, Bakırköy Metro-Yenibosna Metro, Bakırköy Metro-Yenimahalle Metro [citation needed] | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Embanked | ||||||||||||||||||||
Parking | No | ||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 4 January 1871[1] | ||||||||||||||||||||
Rebuilt | 1955, 20 | ||||||||||||||||||||
Electrified | 1955 (25 kV AC) | ||||||||||||||||||||
Services | |||||||||||||||||||||
| |||||||||||||||||||||
| |||||||||||||||||||||
|
The new Bakırköy station has two platforms serving four tracks.
Gallery
edit-
Looking west from the overpass.
-
Two Marmaray trains at the station.
-
Bakırköy station before its renovation and expansion.
References
edit- ^ "CO History". trainsofturkey.com. Retrieved 5 November 2018.
- ^ "Gebze-Halkalı banliyö hattı 2018 sonunda hizmete giriyor". marmaray.gov.tr (in Turkish). Archived from the original on 12 March 2019. Retrieved 5 November 2018.