Barbara Walker Crossing

Barbara Walker Crossing is a footbridge carrying the Wildwood Trail across West Burnside Street to connect Portland, Oregon's Forest Park and Washington Park.

Barbara Walker Crossing
The north end of the bridge, 2020
Coordinates45°31′18″N 122°43′07″W / 45.52163°N 122.71854°W / 45.52163; -122.71854
CarriesPedestrians
CrossesWest Burnside Street
LocalePortland, Oregon, U.S.
Other name(s)Wildwood Trail Bridge
Named forBarbara Walker
OwnerPortland Parks & Recreation
Characteristics
DesignTrichord truss
MaterialSteel
Total length180 feet (55 m)
History
Construction cost$4.05 million
OpenedOctober 2019
Location
Map

Description

edit

Barbara Walker Crossing is a 180-foot (55 m) steel footbridge connecting Forest Park and Washington Park, carrying the Wildwood Trail across West Burnside Street. The bridge was designed by Ed Carpenter and named for Barbara Walker, a parks advocate who died in 2014.[1] It cost $4.05 million to construct, with 63 percent of the cost covered by private donations and the remaining $1.3 million from the city government's general fund.[1][2] The bridge was designed to carry 50 tons, with a 74-ton maximum load.[1]

The bridge was built for the Portland Parks Foundation, before ownership was transferred to Portland Parks & Recreation. Joseph Gallivan of the Portland Tribune described the bridge as "striking for its green spikes, which vaguely resemble ferns or evergreen needles."[1]

History

edit

Various groups worked toward the goal of building a bridge, initially known as the Wildwood Trail bridge, across Burnside Street for approximately 30 years. Stakeholders sought to create "a safe, continuous, delicate, iconic bridge that fits the site aesthetic, which could be constructed off-site, installed with minimal disruption, and prove cost-effective".[1]

Carpenter worked with Portland's KPFF Consulting Engineers, who confirmed that a single piling was sufficient to support the bridge. R&H Construction was hired for installation, and the Portland Bureau of Transportation ensured that permit procedures were followed.[1]

Construction

edit

The bridge was constructed at Supreme Steel in Portland's Parkrose neighborhood. It was separated into three pieces before being transported to the installation site over five days. The three pieces, south to north, weighed 10, 5.5, and 8 tons, respectively.[1] The street was closed for two days during installation. One project manager for R&H Construction described the challenges of the bridge's installation:

A tight worksite with heavy traffic that doesn't always obey the posted reduced speed limits around the construction site. Also, working with large bridge sections that are not only in a 'V' shape, but also on a 150-degree radius, requires extensive preplanning in order to erect each section safely.[1]

The bridge was installed in October 2019, and a grand opening ceremony was held on October 27.[1] It is expected to be used by 80,000 people annually.[2]

References

edit
  1. ^ a b c d e f g h i Gallivan, Joseph (October 15, 2019). "Slideshow: Safe passage: Barbara Walker Crossing to open". Portland Tribune. Archived from the original on August 28, 2022. Retrieved January 16, 2020.
  2. ^ a b Theen, Andrew (October 7, 2019). "Portland's new Wildwood Trail pedestrian bridge will open Oct. 27 with all-you-can-eat pancakes". OregonLive.com. Archived from the original on October 14, 2019. Retrieved January 22, 2020.