The Alstom Metropolis C851E is the third generation electric multiple unit rolling stock introduced on the existing North East and Circle lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Alstom under Contract 851E. It consists of six North East line trains and 23 Circle line trains. The trains will be manufactured and assembled in Alstom's manufacturing facility in Barcelona, Spain and progressively shipped to Singapore from 2021 for the NEL and 2022 for the CCL.[5] The contract, valued at S$249,854,305.00,[6] was awarded by the Land Transport Authority during a ceremony held at Sengkang Depot.[7] Alstom is the sole bidder for this contract.[6] An additional 12 3-car trains will be purchased for use on the Circle line, from 2024 onwards.[8]

Alstom Metropolis C851E
Two C851E trains for the North East Line.
The interior of the NEL C851E. Apart from a few cosmetic differences, it is virtually identical to the preceding C751C.
In service
  • 28 July 2023; 15 months ago (2023-07-28) – Present (NEL)
  • 2026 (CCL)
ManufacturerAlstom
Built atBarcelona, Spain
Family nameMetropolis
Entered service
  • 28 July 2023; 15 months ago (2023-07-28) (NEL)[1]
  • 2026 (CCL)
Number under construction57 Vehicles (19 Trainsets) (CCL)
Number built
  • 36 Vehicles (6 Sets) (NEL)
  • 69 Vehicles (23 Sets) (CCL)
Number in service
  • 36 Vehicles (6 Sets) (NEL)
  • 0 Vehicles (0 Sets) (CCL)
Formation6 per NEL trainset, 3 per CCL trainset
  • DT–Mp–Mi+Mi–Mp–DT (NEL)
  • Mc1–T–Mc2 (CCL)
Fleet numbers
  • 7087/7088 – 7097/7098 (NEL)
  • 865 – 887 (CCL)
Operators
Depots
Lines served
Specifications
Car body constructionWelded aluminium
Train length
  • 138.5 m (454 ft 4+34 in) (NEL)
  • 70.1 m (229 ft 11+78 in) (CCL)
Car length
  • 23.65 m (77 ft 7+18 in) (DT/Mc)
  • 22.8 m (74 ft 9+58 in) (Mp/Mi/T)
Width3.2 m (10 ft 6 in)
Height3.7 m (12 ft 1+58 in)
Doors1,450 mm (57+18 in), 8 per car, 4 per side
Maximum speed
  • 100 km/h (62 mph) (NEL design)
  • 90 km/h (56 mph) (NEL service, CCL design)
  • 78 km/h (48 mph) (CCL service)
Traction systemAlstom OPTONIX IGBTVVVF[2]
Acceleration1.1 m/s2 (3.6 ft/s2)
Deceleration1.3 m/s2 (4.3 ft/s2) (Emergency)
Electric system(s)
Current collector(s)
UIC classification
  • 2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′ (NEL)
  • Bo′Bo′+2′2′+Bo′Bo′ (CCL)
Braking system(s)Regenerative and pneumatic
Safety system(s)Alstom URBALIS 300 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, Iconis ATS and Smartlock CBI[3][4]
Coupling systemScharfenberg
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

Tender

edit

The tender for trains under the contract C851E was closed on 2 October 2017 with Alstom being the sole bidder for this contract.[6] The LTA has shortlisted and the tender results was published.

S/N Name of tenderer Amount ($S) Offer 1[9] Amount ($S) Offer 2[9] Remarks
1 Alstom Transport S.A. / Alstom Transport (S) Pte Ltd Consortium 279,782,872.00 293,489,289.00 Offer 1 in mixed currencies; S$410,100,934.00 (Alternative in mixed currencies)

The contract 851E was awarded to the sole bidder Alstom at a cost of $250 million on 30 April 2018.[6][7]

Overview

edit

North East Line

edit

The 6 trains supplements the existing C751A and C751C trains on the North East Line for the 1.7-kilometre (1.1 mi) long extension from Punggol to Punggol Coast which will open in 2024. The first train set arrived in Singapore on 4 April 2021.[10] On 6 June 2023, a C851E (Set 7091/7092) was spotted testing at Potong Pasir MRT station for the first time.[11] The first of these trains entered passenger service on 28 July 2023 (set 7089/7090), and the last set (7095/7096) entered service on 28 August 2023, increasing the NEL fleet from 43 to 49 trains in a span of just one month.[1]

The trains draw 1,500 V DC power from an overhead catenary. They are fully automated (ATO GoA 4) and do not require an attendant on board. Each 6-car train (Formation: DT–Mp–Mi–Mi–Mp–DT) comprises two Driving Trailer (DT) cars at each end, and four Motor Cars (Mp and Mi). The second and fifth cars of each train (Mp) are equipped with a pantograph.

Train formation

edit

The coupling configuration of an SBS Transit C851E in revenue service is DT–Mp–Mi+Mi–Mp–DT.

Cars of SBS Transit C851E
Car Type Driver Cab Motor Pantograph Car Length Wheelchair Bay
m ft in
DM 23.65 77 ft 7.1 in
Mp 22.8 74 ft 9.6 in
Mi 22.8 74 ft 9.6 in

The car numbers of the trains range from 7x087 to 7x098, where x depends on the carriage type. Individual cars are assigned a five-digit serial number by the rail operator SBS Transit. A complete six-car trainset consists of an identical twin set of one driving trailer (DT) and two motor cars (Mi & Mp) permanently coupled together, e.g. set 7087/7088 consists of carriages 71087, 72087, 73087, 73088, 72088 and 71088.

  • The first digit is always a 7.
  • The second digit identifies the car number, where the first car has a 1, the second has a 2 & the third has a 3.
  • The third digit is always a 0.
  • The fourth digit and fifth digit are the train identification numbers. A full length train of 6 cars have 2 different identification numbers e.g. 7087/7088 (normal coupling) or 7087/7098 (cross coupling).
  • Alstom built sets 7087/7088 – 7097/7098.

Circle Line

edit

The 23 new trains will supplement the existing C830 and C830C trains on the Circle Line when the 4.3km long extension from HarbourFront to Marina Bay opens in 2026. The first train set arrived in Singapore on 11 March 2022.[12]

The trains draw 750 V DC power from a bottom-contact third rail. They are fully automated (ATO GoA 4 and do not require an attendant on board. Each 3-car train (Formation: Mc1–Tc–Mc2) comprises two Motor Cars (Mc1 and Mc2) at each end, and an unpowered Trailer Car (Tc) in the middle.

Train formation

edit

The coupling configuration of an SMRT C851E in revenue service is Mc1–T–Mc2.

Cars of SMRT C851E
Car Type Quantity Driver Cab Motor Collector Shoe Car Length Wheelchair Bay
m ft in
Mc 2 23.65 77 ft 7.1 in
T 1 22.8 74 ft 9.6 in

The car numbers of the trains range from 8065x to 8087x, where x depends on the carriage type. Individual cars are assigned a 5 digit serial number by the rail operator SMRT Trains. A complete three-car trainset consists of one trailer (T) and two driving motor (Mc) cars permanently coupled together, e.g. set 865 consists of carriages 80651, 80652, 80653.

  • The first digit is always an 8.
  • The second digit is always a 0.
  • The third and fourth digits identify the set number.
  • The fifth digit identifies the car number, where the first car has a 1, the second has a 2 and the third has a 3.
  • Alstom built sets 865 – 887.

Features

edit

To enable a more robust maintenance regime, all the new trains are equipped with condition monitoring systems to gather data from equipment on the trains. This enables continuous monitoring of the health of the equipment and allows the operator to carry out predictive maintenance for the trains. Contact shoe sensors on the new Circle Line trains enables the operator to react promptly and take necessary measures if any dislodgement is detected.

In addition, two of the new Circle Line three-car trains are each fitted with an Automatic Track Inspection (ATI) System, which enables monitoring of the running rails, track equipment and sleepers while the trains are in operation. The ATI System supplements existing track inspection activities for timely and more effective identification of rail and trackside components which require maintenance.[5]

References

edit
  1. ^ a b "New Trains for North East Line to be Rolled Out for Passenger Service from 28 July 2023". LTA. 27 June 2023. Archived from the original on 27 July 2023. Retrieved 27 June 2023.
  2. ^ "Alstom to supply 34 Metropolis trains and signalling upgrade to Singapore metro". French Chamber Singapore. Archived from the original on 24 September 2015. Retrieved 9 August 2015.
  3. ^ "Singapore Northeast Line: will soon be the largest, fully automatic metro system in the world" (PDF). pp. 4 to 8. Archived (PDF) from the original on 15 June 2020. Retrieved 16 June 2020.
  4. ^ "URBALIS Evolution: Controlling the Performance" (PDF). p. 4. Archived (PDF) from the original on 15 June 2020. Retrieved 16 June 2020.
  5. ^ a b "Alstom to Supply 17 New Trains for North East Line Extension and Circle Line 6". Land Transport Authority. 30 April 2018. Archived from the original on 10 July 2021. Retrieved 23 November 2019.
  6. ^ a b c d "Tender information | Land Transport Authority". www.lta.gov.sg. Archived from the original on 26 July 2018. Retrieved 2 May 2018.
  7. ^ a b hermesauto (30 April 2018). "Alstom to supply 17 new MRT trains for North East Line and Circle Line". The Straits Times. Archived from the original on 16 November 2021. Retrieved 30 April 2018.
  8. ^ "Joint News Release by the Land Transport Authority (LTA) & SMRT - Upgrading the Circle Line in Preparation for Circle Line 6". Land Transport Authority. 25 July 2019. Archived from the original on 31 October 2020. Retrieved 23 November 2019.
  9. ^ a b "851E Schedule" (PDF). www.lta.gov.sg. Archived (PDF) from the original on 15 September 2018. Retrieved 15 September 2018.
  10. ^ "First of six new trains for North-East Line arrived in Singapore". Unscrambled.sg. 12 April 2021. Archived from the original on 5 July 2022. Retrieved 16 March 2022.
  11. ^ "[Exclusive: Main Line Testing]SBS Transit C851E Set 7091/7092 at Potong Pasir". Archived from the original on 9 June 2023. Retrieved 9 June 2023.
  12. ^ "New train for Circle Line MRT arrives in Singapore; first of 23 to be shipped here". The Straits Times. 11 March 2022. Archived from the original on 14 March 2022. Retrieved 16 March 2022.