Connector (Cincinnati)

(Redirected from Cincinnati Streetcar)

The Connector is a streetcar system in Cincinnati, Ohio, United States. The system opened to passengers on September 9, 2016.[3] The streetcar operates on a 3.6-mile (5.8 km)[4] loop from The Banks, Great American Ball Park, Paycor Stadium, and Smale Riverfront Park through Downtown Cincinnati and north to Findlay Market in the northern edge of the Over-the-Rhine neighborhood. Future extensions have been proposed to the Uptown area, home to the University of Cincinnati, the regional hospitals on Pill Hill, and the Cincinnati Zoo; and to Northern Kentucky.

Connector
Connector at The Banks in September 2016
Overview
Other name(s)Cincinnati Streetcar (planning)
Cincinnati Bell Connector (2016–2022)
OwnerCity of Cincinnati
Line number100
LocaleCincinnati, Ohio, United States
Stations18
WebsiteOfficial website
Service
TypeStreetcar
Services1
Operator(s)Transdev
Rolling stockFive CAF Urbos 3
Daily ridership3,079[1](as of 2023)
Ridership1,108,092 (annual)[2]
History
OpenedSeptember 9, 2016; 8 years ago (2016-09-09)
Technical
Line length5.8 km (3.6 mi)
CharacterStreet running
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line750 V DC
Route map

Brewery District
Maintenance Facility
Findlay Market
– Race
Liberty & Elm
Liberty & Race
14th & Elm
Washington Park
12th & Vine
12th & Main
Central Parkway
Court & Main
Public Library
8th & Main
Aronoff Center
6th & Main
Fountain Square
4th & Main
The Banks

Due to the cost, and lack of distance, the project faced opposition on several occasions after being first proposed in 2007. Challenges included ballot initiatives to stop the project in 2009 and 2011, opposition from members of Cincinnati City Council, Governor John Kasich, and Mayor John Cranley (elected in 2013). However, both of the anti-rail ballot initiatives were rejected by voters, and a pro-streetcar majority was elected to City Council in 2011, allowing the project to move forward. Naming rights to the system were purchased by Cincinnati Bell in a $3.4 million, 10-year deal in August 2016.[5] The streetcar was known as the Cincinnati Bell Connector until 2022, when the system gained its current name after the rebranding of Cincinnati Bell to Altafiber.[6]

During the COVID-19 pandemic, fares were suspended and eventually eliminated.[7]

History

edit

Context

edit

At the end of the 20th century, Over-the-Rhine, which is adjacent to downtown, was one of the most economically distressed areas in the United States.[8] Over-the-Rhine's instability was preventing growth and investment in Downtown Cincinnati, the city's central business district;[8] this, in turn, has been affecting the health of the entire region.[8] Ideally, the streetcar line would attract downtown (and uptown) workers to live near the line, provide economic stimulation and development, and provide transportation for local residents and tourists. The streetcars appeared in Cincinnati's massive 2002 transit plan, MetroMoves,[9] which was rejected when taken to a public vote.[10] A "Phase 1B" was considered that would connect to the "uptown" neighborhoods that surround the University of Cincinnati.[11] The fundamental goal of the streetcar proposal is to create transit-oriented development.[12]

Feasibility study

edit
 
Cincinnati's proposal was modeled after the system in Portland, Oregon

On May 31, 2007, Omaha-based HDR Engineers completed a feasibility study that focused on a 3.9-mile (6.3 km) loop from The Banks, through downtown and Over-the-Rhine.[13] According to the study, the city would gain between 1,200 and 3,400 additional residences, raise an additional $34 million in property taxes, and yield $17 million in retail activity per year from new residents.[13] Within one-quarter mile (0.4 km) of the line there are 97 acres (39 ha) of surface parking lots along the downtown and Over-the-Rhine line.[13] The potential yield of the parking lots for redevelopment is 3,787 housing units or 7,412,900 sq ft (688,680 m2) of commercial/office/hotel space.[13] The study says lots would create between $54 million and $193 million additional redevelopment per year, with a conservative estimate of $112 million per year.[13] A total property value premium of $379 million plus $1,480,000,000 of redevelopment over 10 years (conservative estimate) would equal a total of $1,911,000,000 of benefits for the city.[13] The study estimated the cost to be around $100 million and concluded that the benefit-cost ratio of the downtown and Over-the-Rhine line would be 15.2 to 1, which means for every dollar Cincinnati spends it will receive $15.20 in return.[13] The University of Cincinnati "checked the math" of the study and found that the "projections of the benefits of ridership and economic development" are "credible."[14]

The study projected that a 2010 opening year would draw an estimated 4,600 riders of the downtown and Over-the-Rhine portion of the line each weekday.[13] According to city leaders, if 2 percent of downtown workers, and 2 percent of convention attendees, and 2 percent of Over-the-Rhine residents ride the streetcars it will meet that daily ridership.[12] By 2015 (assuming the system opened in 2010) about 6,400 people were estimated to ride the streetcars per weekday.[13] Ridership numbers for the uptown line were not included in the study.

The 2007 study also claims the streetcar system would have four significant economic effects:

  1. Customer base and customer access will expand for existing businesses.
  2. Improved market values of existing properties.
  3. Catalyst for new transit-oriented development where less parking is required.
  4. Supporting neighborhoods by making them more walkable.

Votes and political involvement

edit

In 2007 the city completed a study to determine if installing streetcars would be beneficial.[13] On April 23, 2008, Cincinnati City Council approved a plan to build a new streetcar line.[11]

In 2009 and 2011 the city voted on referendums designed to stop the streetcar project, but in both cases a majority of voters favored the project.

2009 referendum

edit

Special interest groups COAST (Coalition Opposed to Additional Spending and Taxes) and the Cincinnati NAACP both oppose the streetcar system.[15] Both groups gathered signatures[16] for a ballot initiative that would amend the city's charter and force a public vote on the streetcars.[17] However, the amendment would have prohibited the city "from spending any monies for right-of-way acquisition or construction of improvements for passenger rail transportation."[18] This would have affected more than just streetcars, forcing a public vote on any rail-based system including the proposed high-speed rail that connects Cincinnati to Columbus and Cleveland,[15][19] and potentially even the "Safari Train" at the Cincinnati Zoo.[20] Since the amendment is usually described as a vote on the streetcars, CityBeat has suggested the amendment is "deceptive" and an attempt to reverse "COAST's waning political influence" in the city.[19] (COAST has been described as "rabidly anti-mass transit."[19]) The Cincinnati Enquirer, who wrote that the city is not ready for streetcars,[21] called the proposed amendment a "poison pill" that is "DECEPTIVE in its language and intent."[22]

A political action committee called Cincinnatians for Progress was formed to oppose the amendment proposed by COAST and the NAACP.[17] According to Cincinnatians for Progress, the amendment would unnecessarily delay projects by 10 to 12 months while the city waits on a public vote, and put Cincinnati at a competitive disadvantage with other cities.[17] In the November 3, 2009 local elections however, this city charter amendment proposal failed, losing 56% to 44%.[23]

2011 referendum

edit

After losing at the ballot box in 2009, COAST and the local NAACP began collecting signatures in 2011 for a similar ballot initiative.[24] This referendum, known as Issue 48, differed by banning any spending on rail until December 31, 2020, rather than requiring a citywide vote for spending. It would have banned spending, no matter the source of money (federal, state, privately financed, etc.).[25] Critics believed the language of the amendment again applied to all forms of rail transit, including any plans for a streetcar, light rail, or commuter rail.[26]

The Cincinnati Enquirer endorsed a "No" vote on Issue 48, stating, "we vigorously oppose Issue 48 and urge voters to reject it. ... Issue 48 is a bad, bad, bad idea."[27] According to "a majority of legal experts" interviewed by the Enquirer, Issue 48 "is written so broadly it could stop other rail projects in the city."[28] Non-streetcar commuter rail projects that may have been affected included the county-backed Eastern Rail Corridor project, which plans to connect the eastern suburbs to downtown using an abandoned rail line.[28] Others who endorsed a "No" vote were Cincinnati CityBeat,[29] League of Women Voters of the Cincinnati Area,[30] and former leaders of the local NAACP.[31]

Issue 48 was defeated 52% to 48% on November 8, 2011.[32] This, along with Cincinnati electing a more progressive city council,[33] allowed the streetcar project to proceed.[32]

Construction begins

edit

Construction of the streetcar system began with a groundbreaking on February 17, 2012, and utility relocation began at that time.[34][35] The contract with Messer/Prus/Delta JV for the construction of the tracks, power system, and a maintenance facility was signed on July 15, 2013.[36][37]

Former Cincinnati mayor Mark Mallory, a supporter of the streetcars, acknowledged the possibility of reinstalling one or more inclines if the new proposal for streetcars is successful enough.[38] The city still owns the rights-of-way where the inclines once sat.[38]

Construction pauses after 2013 election

edit
 
Testing of the first streetcar in November 2015

On November 6, 2013, in a mayoral election to replace Mayor Mallory, who is term-limited, Cincinnati Streetcar supporter Roxanne Qualls was defeated by streetcar opponent John Cranley. In addition, Laure Quinlivan, a council member and streetcar supporter, lost her re-election bid by placing tenth in a race where only the first nine are seated; Amy Murray, a Charter-endorsed Republican who opposed the streetcar, placed ninth. By the time the election was held, contracts had been signed, utility relocation had been ongoing for months, and nearly a half mile of track had been installed on Elm Street. John Deatrick, the Project Executive for the Cincinnati Streetcar, presented numbers to Council showing that it would cost nearly as much to cancel the project as to finish it. Cranley reiterated his intent to cancel the project; however, City Councilman P.G. Sittenfeld, one of the main critics of the streetcar during the election, opposed the cancellation of the project by then.[39] Still, five out of nine members voted to "pause" construction of the streetcar on December 4 to allow for an outside audit of the project.[40]

An independent audit confirmed Dietrich's estimates of the cost of canceling the project. However, Cranley and several council members expressed concern about the annual operating cost of the streetcar and the effect it would have on the city's operating budget. The Southwest Ohio Regional Transit Authority offered to take responsibility for the streetcar's operating cost, but Cranley refused this offer and insisted that financial support must come from the private sector. Finally, after the Haile Foundation committed to providing $9 million in funding towards the project, City Council voted on December 19 to continue construction of the streetcar. Council Members Kevin Flynn and David Mann, who had supported the "pause", joined with four other Council members to vote in favor of the project. Since a supermajority of six Council members voted to resume the project, Cranley was unable to veto the ordinance.

Operations

edit
 
On the system's opening weekend

The system opened to passengers at noon on September 9, 2016. The opening was celebrated with a weekend of free rides.[3] Over 50,000 rides were taken during the three-day opening weekend.[41] It is operated under contract by Transdev.[42]

Following its opening, the streetcar fell short of ridership projections, averaging 2,012 riders per day during its first year. Large events such as the Cincinnati Reds Opening Day draw much larger crowds. Low ridership has been blamed on frequent track blockages by cars that contribute to delays as well as an anti-rail mayoral administration. In August 2018, Cincinnati Bell approached the City of Cincinnati about ending its sponsorship of the system, less than two years into the 10-year contract.[43]

Due to the COVID-19 pandemic, service was suspended at the end of March 30, 2020,[44] and resumed on September 2. The same day, Cincinnati City Council overrode Mayor John Cranley's veto to suspend fares, with the intention of making the streetcar line free of charge permanently.[45] The streetcar line became free of charge permanently beginning November 1.[7] Prior to that change, fare collection had used a proof-of-payment system, with inspectors randomly checking tickets on board.[46]

Beginning in late 2021, ridership began to exceed pre-pandemic levels. For every month from November 2021 through September 2023, the system set record ridership for the respective month, except in the month of June 2022, during which service was suspended for three weeks due to the partial collapse of a nearby building.[47] In 2022, the streetcar set an all-time annual ridership record of 846,622 passengers.[48] The following year, it surpassed that record by more than 30 percent, setting a new all-time annual ridership record of 1,108,092 passengers in 2023.[49] The streetcar set an all-time monthly ridership record of 119,357 passengers in July 2024.

Route

edit

List of stops

edit

Loop between The Banks and Over-the-Rhine

No. Station Connections Serves
1 The Banks
(2nd & Main)
  Riverfront Transit Center Brady Music Center, Freedom Center, Great American Ball Park, Heritage Bank Center, Paycor Stadium
2 4th & Main   Government Square Cincinnati Bell, Taft Museum of Art
3 6th & Main Aronoff Center
4 8th & Main Main Library
5 Court & Main Hard Rock Casino
6 Hanke Exchange
(12th & Main)
Emery Theatre
7 12th & Vine Art Academy of Cincinnati
8 14th & Elm Cincinnati Music Hall, Memorial Hall, TQL Stadium, Washington Park
9 Liberty & Elm
10 Findlay Market – Elm
(Elm & Glass Alley)
Findlay Market, Samuel Adams Taproom
11 Brewery District
(Elm & Henry)
Brewery District
12 Findlay Market – Race
(Race & Elder)
Findlay Market, Rookwood Pottery
13 Liberty & Race Taft's Ale House
14 Washington Park
(12th & Race)
Washington Park
15 Central Parkway
(Central & Vine)
City Hall, Fire Museum, SCPA
16 Public Library
(9th & Walnut)
Main Library
17 Aronoff Center
(7th & Walnut)
Aronoff Center, Contemporary Arts Center
18 Fountain Square
(5th & Walnut)
  Government Square Carew Tower, Duke Energy Center, Fountain Square

Possible extensions

edit

The 2007 feasibility study suggested the possibility of several extensions or future additions including a line through Cincinnati's "uptown" neighborhoods to the University of Cincinnati, the Cincinnati Zoo, and to the neighborhood of Clifton.[13] Other potential extensions include a line through the West End to Union Terminal, a line to the East End neighborhood using an abandoned track, and a line across the Taylor-Southgate Bridge to Newport on the Levee in Newport, Kentucky.[13]

Uptown Connector

edit
 
A streetcar in service at 5th and Walnut, in downtown, on the system's opening weekend

On April 23, 2008, Cincinnati City Council voted 6–2 in favor of building the lines that link downtown, Over-the-Rhine, and uptown.[11] Originally, the city wanted to build the line that connects Over-the-Rhine and downtown in the first phase, and then build the uptown link in a second phase.[12] However, a council majority wanted to include the Uptown Connector in the first phase.[12] Soon after taking office in 2011, the anti-rail Republican, Governor John Kasich, pulled all $52 million in state money for the streetcar project, and plans for the Uptown route were scrapped as a result.[50]

Both Vine Street and West Clifton Avenue were studied as options for the Phase 1B connection from Over-the-Rhine to Uptown.[51] Vine Street was a path for the original streetcars, but an "extreme hillside" to the west of the street and a city park and an elementary school to the east leaves less land for development when compared to West Clifton Avenue.[52] West Clifton Avenue passes through Clifton Heights, which is one of the densest neighborhoods in the city due to its concentration of UC students.[52] Studies considered whether or not West Clifton Avenue is too steep for streetcar travel,[51][52] and which path could tap into more federal funding.[52] Ultimately, Vine Street was chosen as the route for the original Uptown Connector.

The lack of political will to advance plans for an extension has given advocates more time to study and reconsider the best way to take the streetcar to Uptown. In 2014, as the Vine Street route was further explored, the "Clifton Shortcut" was proposed as a more direct route to turn up Vine Street.[53] However, after further study it still suffered from many of the same issues as the originally proposed Vine Street route with major underground utility lines, narrow lanes with greater risk of accidents, and uncomfortable grades, which limit level boarding platforms for stops and hence economic development opportunities in the hillside areas.[54]

In 2015, an alternative plan of using two tunnels to get to Uptown has also been proposed. It includes extensions from Phase 1A northward up Main and Walnut to a southern tunnel portal under Mulberry Street at Main that daylights at-grade near Inwood Park for a station servicing Christ Hospital before returning underground until aligning with Jefferson Avenue near Daniels.[55] Past studies have shown that Mount Auburn has suitable geology that is conducive to building a $100 million tunnel that would connect downtown to Clifton,[56] however further study is needed to know the exact cost to implement this new plan. The additional cost of tunneling is believed to be justified in order to increase reliability and speed at the center of a regional light rail system that could be developed around this spine in the future through projects such as Wasson Way.[54][57]

Newport extension

edit

In 2009, the cities of Newport, Kentucky, and Covington, Kentucky, across the Ohio River officially supported Cincinnati's streetcar proposal, and would like to install a system that links with the Cincinnati system.[58] A group called the Northern Kentucky Streetcar Committee is exploring ways to get a study funded to extend the route across the Taylor Southgate Bridge and into Newport.[59]

Cost and funding

edit
 
Construction in December 2014

The Downtown/Over-the-Rhine line would cost $102 million.[11] A Downtown/Over-the-Rhine/University of Cincinnati line would cost $128 million.[60] The full Downtown/Over-the-Rhine/University of Cincinnati/Uptown/Zoo line would cost $185 million.[11] The cost estimate for the Downtown/Over-the-Rhine line includes approximately 4.5 miles (7.2 km) of track and overhead power supply (for the route and storage/maintenance), 6 streetcars, 18 streetcar stops, a maintenance/storage facility for the streetcars, as well as a 15% to 25% contingency on project line items.[61]

The money to fund the $102 million Downtown/Over-the-Rhine line would be attained from a variety of sources.[11] Of those, $25 million would come from capital bonds; $25 million from tax increment financing from downtown property taxes; $31 million from private contributors, partners and sponsors; $11 million from proceeds from the sale of the Blue Ash Airport; and $10 million from state grants.[11] The remaining $80 million to $85 million for the full Uptown system was planned to be built later, mostly with federal funds.[11] However, after city council approved the streetcar plan they decided to look for an additional $35 million to "get up the hill" to the University of Cincinnati.[11] (Engineering and construction costs for the uphill portion of the line would cost more than the portion of the line built on flat land.[11]) The $35 million would only take the streetcars up to the university, that money would not extend it to the Cincinnati Zoo.[11]

Annual operating costs were estimated between $2.0 and $2.7 million per year for the Downtown/Over-the-Rhine line.[13] The estimate includes labor for streetcar operators, for maintenance of the streetcars, track and other facilities, and for ongoing management and administration of the service.[61] A portion of the cost would be covered by a fare, if there is one.[61] The fare policy has not been decided and could cost anywhere from "the current local bus fare" ($1.50 as of 2009) to free.[61] According to City Council member Chris Bortz, the remaining operating cost could be covered by a variety of means, the most likely being revenue from advertisements inside and/or outside the streetcar—similar to how ads are done with Cincinnati's bus system.[12]

Due to the severe economic downturn of 2008 and 2009 the city has had trouble raising the full $35 million needed from private sources.[51] (Duke Energy has promised to donate $3.5 million.[62]) City officials have made several trips to Washington to lobby for federal money for the streetcar system.[51]

In May 2010, the city had raised over $90 million in funds, and expected federal grants in the summer of 2010 to cover the remaining cost.

  • $15 million from Ohio Transportation Review Advisory Council (TRAC)[63]
  • $64 million in bonds by the City of Cincinnati[64]
  • $2.6 million in local funds[65]
  • $15 million from the Ohio Department of Transportation[65]
  • $4 million from the Ohio-Kentucky-Indiana Regional Council of Governments[65]
  • $25 million from the United States Department of Transportation's Urban Circulator Grant Program[66]

After the Ohio Transportation Review Advisory Council (TRAC) pulled its portion of funding for the project, the city postponed the Uptown Connector and moved forward with a slightly shortened Downtown/Over-the-Rhine route. After receiving an additional Urban Circulator grant from the United States Department of Transportation, the route was extended to reach Henry Street to the north and 2nd Street to the south.

In 2011 Governor John Kasich took away $52 million in state money that had been awarded to the streetcar by the previous administration. Despite being the Ohio Department of Transportation's top rated project, the money was redirected to projects in other areas of the state.[67] In 2012, Congressman Steve Chabot added an amendment to the annual transportation spending bill that prohibits any federal money going to the streetcar.[68]

The final budget upon project completion in 2016 was $148 million.[69]

Possible benefits and drawbacks

edit

There may be some benefits associated with building the streetcar system. The projections of the 2007 streetcar study indicated that the streetcars would have a 14:1 benefit-cost ratio over the next decade.[14][17] In addition, Downtown and Over-the-Rhine has 97 acres (39 ha) of surface parking lots within 0.25 miles (0.4 km) of the line, which is a lot of potential development.[13] Much of the recent investment in the Over-the-Rhine neighborhood is based on the belief that the system will be built. Rookwood Pottery moved from Glendora Avenue in Corryville to Race Street in Over-the-Rhine, near Findlay Market, so that it would be on the streetcar line.[70][better source needed] Forty-six cities either have streetcars, or are trying to develop them.[71] For instance, Portland, Oregon, spent $57 million to build its streetcar system and recouped $1.6 billion in investment, so by the same projection, the investment in Cincinnati would yield nearly $3 billion in development.[71]

However, opponents say that a streetcar may not be as effective, or effective at all, at economic development in Cincinnati as streetcars seem to have been in certain other cities. That is, economic development is contextual and historically contingent. The NAACP, for example, has suggested improving existing utilities and economic sectors rather than building the streetcar system.[72] In addition, the streetcar is designed to be symbolic transit, rather than being planned as an essentially functional part of the transit system—or to serve primarily as transportation as such—because Over-the-Rhine is already developing very rapidly without the streetcar.[73][74] Other opponents say that the streetcar serves as a political cover for the easing of development restrictions[75] and that much or all development will be due to the easing of restrictions that would have otherwise been left in place, rather than a streetcar itself.[76]

Rolling stock

edit

Five low-floor CAF Urbos 3 streetcars[77] were ordered from Construcciones y Auxiliar de Ferrocarriles (CAF) of Beasain, Spain, with an original delivery date of July 2014.[78] The first streetcar vehicle arrived on October 30, 2015.[79]

Streetcar number 1175 being unloaded on to the rails

Ridership

edit

Italics indicate each month's ridership record.

Month 2016 2017 2018 2019 2020 2021 2022 2023 2024
January N/A 35,334 16,943 22,079 26,385 21,214 43,131 71,363 67,686
February N/A 36,681 22,465 23,759 28,295 21,046 49,641 71,183 73,461
March N/A 34,679 37,471 35,484 17,837 33,764 58,874 80,215 101,017
April N/A 49,966 36,998 36,035 60 40,933 65,352 90,165 103,565
May N/A 53,116 51,110 46,931 53 51,430 81,175 102,189 114,296
June N/A 61,404 50,326 51,534 48 44,077 49,627 105,624 111,630
July N/A 60,749 57,682 58,392 96 59,173 89,074 111,320 119,357
August N/A 52,028 47,363 56,402 317 55,405 83,078 101,988 119,072
September 75,485 57,214 43,501 51,554 21,253 62,136 88,992 115,114 104,739
October 82,934 63,150 37,732 76,752 24,607 59,161 103,700 87,427 119,146
November 49,920 34,517 33,706 32,742 23,054 52,440 64,675 82,509
December 52,209 32,583 38,387 38,352 24,337 55,105 69,303 88,995
Totals 260,548 571,421 473,684 530,016 166,342 555,884 846,622 1,108,092

[80] [81]

Commemorative beers

edit

On October 23, 2015, Brad Thomas, a member of the Southwest Ohio Regional Transit Authority, announced that the five different brewers that line the streetcars route had each agreed to brew a new specialty beer to honor the delivery of the first five vehicles.[82]

Commemorative beers[82]
Vehicle number Delivery date Commemorative beer
1175 October 30, 2015 "Ryed the Rails" by Taft's Ale House
1176 November 23, 2015 "Desire" by Christian Moerlein Lager House
1177 December 11, 2015 "Traction" by Rhinegeist
1178 January 7, 2016 Christian Moerlein Tap Room
1179 February 5, 2016 "1179 Marzen" Rock Bottom Brewery

See also

edit

References

edit
  1. ^ Cincinnati, City of. "Ridership Records". Cincy Insights. City of Cincinnati. Retrieved September 27, 2023.
  2. ^ Cincinnati, City of. "Streetcar Ridership". Cincy Insights. City of Cincinnati. Retrieved September 27, 2023.
  3. ^ a b Rinehart, Bill (September 9, 2016). "Cincinnati's Streetcar Is Open For Business". WVXU. Retrieved September 9, 2016.
  4. ^ "Design & Route". City of Cincinnati. 2016. Retrieved September 10, 2016.
  5. ^ "Cincinnati Bell Named Sponsor of the Cincinnati Streetcar". Go-metro.com (Press release). SORTA. August 18, 2016. Archived from the original on September 11, 2016. Retrieved September 10, 2016.
  6. ^ "FAQs - Streetcar". City of Cincinnati. 2022. Archived from the original on September 18, 2022. Retrieved September 18, 2022.
  7. ^ a b "The Cincinnati Streetcar Will Be Free to Ride — Permanently — Starting Nov. 1". Cincinnati CityBeat. October 28, 2020. Retrieved November 1, 2020.
  8. ^ a b c 3CDC, Over-the-Rhine Overview Archived January 30, 2009, at the Wayback Machine. Retrieved on April 2, 2009
  9. ^ Pilcher, James (August 20, 2002). "MetroMoves: What will it mean to area?". The Cincinnati Enquirer. Retrieved July 10, 2008.
  10. ^ Pilcher, James (November 6, 2002). "Metro plan hits wall of resistance". The Cincinnati Enquirer. Retrieved July 3, 2008.
  11. ^ a b c d e f g h i j k McGurk, Margaret A. (April 24, 2008). "Streetcar plan approved: Vote adds $35 million to city's financing goal". The Cincinnati Enquirer. Retrieved April 14, 2009.
  12. ^ a b c d e WVXU Impact Cincinnati: Plans to bring streetcars back to Cincinnati Archived July 24, 2011, at the Wayback Machine. Accessed on May 3, 2009.
  13. ^ a b c d e f g h i j k l m n "Cincinnati Streetcar Feasibility Study" (pdf). HDR Engineering, Inc. and PB Americas, Inc. (for the City of Cincinnati). July 2007. Retrieved August 30, 2014.
  14. ^ a b "An Assessment of the Cincinnati Streetcar Study" (pdf). University of Cincinnati. Retrieved August 30, 2014.
  15. ^ a b "Cincinnati streetcar initiative could be headed for 2009 ballot". Business Courier of Cincinnati. December 23, 2008. Retrieved May 4, 2009.
  16. ^ "Petitions demand vote on streetcars". nky.com. April 10, 2009. Archived from the original on February 17, 2012. Retrieved May 3, 2009.
  17. ^ a b c d 55KRC March 29th: What The Coast Transportation Ballot Initiative Prevents Our City From Doing [permanent dead link]. Accessed on May 3, 2009.
  18. ^ "Hamilton County Ballot (2009)". League of Women Voters of the Cincinnati Area Education Fund. November 3, 2009. Retrieved December 22, 2013.
  19. ^ a b c Osborne, Kevin (May 27, 2009). "Careful: Streetcar Petitions Can Be Deceptive". CityBeat. Archived from the original on May 29, 2009. Retrieved May 28, 2009.
  20. ^ Horstman, Barry M. (September 15, 2009). "Streetcar ballot could affect zoo, museum trains". The Cincinnati Enquirer. Archived from the original on February 24, 2012. Retrieved September 15, 2009.
  21. ^ "Editorial: Put streetcar project on hold". The Cincinnati Enquirer. July 19, 2009. Retrieved August 30, 2009.
  22. ^ "'Poison Pill' amendment is about less, not 'more'". The Cincinnati Enquirer. August 8, 2009. Retrieved August 30, 2009.
  23. ^ Osborne, Kevin (November 4, 2009). "Voters Have No Issues With Issues: Rail supporters beat back Issue 9, but petitioners win on Water Works". CityBeat. Archived from the original on November 9, 2009. Retrieved March 4, 2010.
  24. ^ "Streetcar opposition files petition". Cincinnati Business Courier. January 20, 2011. Retrieved July 31, 2011.
  25. ^ "Streetcar Spending Petition 2011 v5 C _FINAL". Retrieved August 10, 2016.
  26. ^ Painter, Mark P. (July 30, 2011). "Latest anti-streetcar effort a detour for all light rail [op-ed column]". The Cincinnati Enquirer. Retrieved July 31, 2011.
  27. ^ "City/county issues: Vote 'no' on divisive anti-rail measure". The Cincinnati Enquirer. October 30, 2011. Retrieved October 30, 2011.
  28. ^ a b "How far does the streetcar ballot issue really go? Wording could prevent projects until 2020". The Cincinnati Enquirer. September 18, 2011. Retrieved September 18, 2011.
  29. ^ "Anti-Streetcar Measure Is a Trojan Horse". Cincinnati CityBeat. August 3, 2011. Archived from the original on October 12, 2011. Retrieved September 18, 2011.
  30. ^ "League Opposes Anti-Streetcar Issue". Cincinnati CityBeat. September 12, 2011. Retrieved September 18, 2011.
  31. ^ "NAACP Icons Urge 'No' Vote on Issue 48". The Cincinnati Enquirer. October 10, 2011. Retrieved October 30, 2011.
  32. ^ a b "After key votes, Cincinnati streetcar project moves forward". Reuters. November 10, 2011. Retrieved November 13, 2011.
  33. ^ "Cincinnati defeats Issue 48 and votes a younger, more progressive city council into office". UrbanCincy. November 9, 2011. Retrieved March 28, 2014.
  34. ^ "Streetcar project breaks ground". The Cincinnati Enquirer. February 17, 2012. Retrieved February 17, 2012.
  35. ^ "Cincinnati Streetcar Groundbreaking". APTA Streetcar and Heritage Trolley Site. American Public Transportation Association. March 2012. Retrieved August 7, 2013.
  36. ^ Coolidge, Sharon (May 24, 2016). "Streetcar opening day set". The Cincinnati Enquirer. Retrieved August 13, 2016.
  37. ^ "Construction Contract Signed For Phase I Of Cincinnati Streetcar". City of Cincinnati. July 15, 2013. Retrieved August 30, 2014.
  38. ^ a b Radel, Cliff (March 9, 2009). "Foes of public transport have history here: Author claims opponents sidetracked economic progress". The Cincinnati Enquirer. Retrieved April 5, 2009.
  39. ^ Andrews, Cindy (November 26, 2013). "Sittenfeld supports streetcar; Flynn stills wants pause". Cincinnati Enquirer. Retrieved December 1, 2013.
  40. ^ Andrews, Cindi (December 18, 2013). "Cincinnati considers canceling partly built streetcar". USA Today. Retrieved December 18, 2013.
  41. ^ Wetterich, Chris. "How many trips did people take on the Cincinnati streetcar over the weekend?". Cincinnati Business Courier. Retrieved September 15, 2016.
  42. ^ Cincinnati Streetcar becomes Cincinnati Bell Connector with naming rights sale Railway Gazette International October 20, 2016
  43. ^ Coolidge, Sharon; Coolidge, Alexander; Sparling, Hannah (August 31, 2018). "Cincinnati Bell considers dropping streetcar sponsorship". The Cincinnati Enquirer. Gannett Company. Retrieved September 1, 2018.
  44. ^ "Streetcar service suspended due to COVID-19". Cincinnati Bell Connector. City of Cincinnati. Retrieved July 22, 2020.
  45. ^ Sparling, Hannah K. (September 2, 2020). "Cincinnati Bell Connector: The streetcar is now free to ride". The Cincinnati Enquirer. Retrieved September 2, 2020.
  46. ^ Kelley, Amanda (September 12, 2016). "Cincinnati streetcar starts charging for rides Monday". Retrieved September 27, 2016.
  47. ^ Editor, John Alexander Reese, Digital (September 17, 2023). "Cincinnati Streetcar Sets Record Ridership Numbers". The Cincinnati Herald - Black & African American community news. Retrieved September 27, 2023. {{cite web}}: |last= has generic name (help)CS1 maint: multiple names: authors list (link)
  48. ^ "Streetcar Ridership Hits All-Time Annual Record in 2022". www.cincinnati-oh.gov. Retrieved February 3, 2023.
  49. ^ "Connector Ridership Jumps 30% to Record 1.1 Million Passengers in 2023". www.cincinnati-oh.gov. Retrieved January 13, 2024.
  50. ^ "Seelbach: Time to look at how to get streetcar Uptown". Retrieved August 10, 2016.
  51. ^ a b c d Horstman, Barry M. (May 14, 2009). "Streetcar backers have backs to wall". The Cincinnati Enquirer. pp. A1, A7.
  52. ^ a b c d Monk, Dan (November 28, 2008). "Streetcar debate: Which way to Uptown?". Business Courier of Cincinnati. Retrieved May 15, 2009.
  53. ^ "Opinion: How to get the streetcar Uptown faster and cheaper". Retrieved August 10, 2016.
  54. ^ a b "John Schneider has a big idea for Cincinnati, and it's worth hearing him out (Video) - Cincinnati Business Courier". Retrieved August 10, 2016.
  55. ^ "Streetcar track completed on time and on budget -- now what about the next phase? (Video) - Cincinnati Business Courier". Retrieved August 10, 2016.
  56. ^ "Light-rail bid gets early nod - Cincinnati Business Courier". Archived from the original on August 6, 2016.
  57. ^ "Wasson Way". Retrieved August 10, 2016.
  58. ^ Wartman, Scott (March 24, 2009). "Newport officials like streetcars". The Cincinnati Enquirer. Retrieved April 5, 2009.
  59. ^ "Group envisions Cincinnati streetcar extension to Northern Kentucky".
  60. ^ Osborne, Kevin (December 30, 2008). "A Year for the Ages". City Beat. Archived from the original on June 13, 2011. Retrieved May 15, 2009.
  61. ^ a b c d City of Cincinnati. Frequently Asked Questions about Cincinnati Streetcar Feasibility Study Archived July 16, 2011, at the Wayback Machine. Accessed on May 16, 2009.
  62. ^ "Duke Energy to help finance Cincinnati streetcar initiative". Cincinnati Business Courier. October 29, 2008. Retrieved May 3, 2009.
  63. ^ Horstman, Barry M. (March 19, 2010). "Cincinnati lands $15M streetcar grant". The Cincinnati Enquirer. Archived from the original on October 1, 2012. Retrieved March 19, 2010.
  64. ^ Horstman, Barry M. (May 10, 2010). "Council approves $64 M in bonds for streetcar". The Cincinnati Enquirer. Archived from the original on May 16, 2010. Retrieved May 13, 2010.
  65. ^ a b c Horstman, Barry M. (May 13, 2010). "$19M more for streetcar". The Cincinnati Enquirer. Archived from the original on May 23, 2010. Retrieved May 13, 2010.
  66. ^ "Cincinnati streetcar plan wins $25M in federal funding". Business Courier of Cincinnati. July 8, 2010. Retrieved February 6, 2011.
  67. ^ Osbourne, Kevin (May 11, 2011). "Cincy's Streetcar Is the Little Engine That Could". Cincinnati CityBeat. Archived from the original on January 29, 2012. Retrieved June 29, 2012.
  68. ^ Weiser, Carl (June 28, 2012). "U.S. House bars federal money for streetcar". The Cincinnati Enquirer. Archived from the original on May 23, 2010. Retrieved June 29, 2012.
  69. ^ "Cincinnati Bell Connector". August 24, 2016.
  70. ^ Rookwood Pottery. Rookwood still has cachet: Revived company thriving; tiles are selling Archived February 23, 2012, at the Wayback Machine. Accessed on May 7, 2009.
  71. ^ a b Preuth, Ian (May 15, 2008). "A Look At Cincinnati's Streetcar Debate". WCPO. Archived from the original on April 21, 2009. Retrieved May 3, 2009.
  72. ^ "NAACP wants to block Cincinnati streetcars". Ohio.com. Associated Press. December 24, 2008. Retrieved April 5, 2009.
  73. ^ Walker, Jarrett (February 21, 2012). "one-way splits as symbolic transit". Human Transit. Retrieved December 24, 2014.
  74. ^ Wessel, Nate. "The Streetcar – 4 – Symbolic Transit". Cincinnati Transit Blog. Archived from the original on April 5, 2023. Retrieved December 24, 2014.{{cite web}}: CS1 maint: unfit URL (link)
  75. ^ Horstman, Barry. "Streetcar could reduce number of parking spaces for Cincinnati residents". Cincinnati Enquirer. Gannett. Retrieved January 9, 2015.
  76. ^ Freemark, Yonah (September 18, 2012). "Don't Forget the Zoning". The Transport Politic. Retrieved January 9, 2015.
  77. ^ "Streetcar Vehicle Production Under Way". City of Cincinnati. March 19, 2013. Retrieved August 30, 2014.
  78. ^ "Bids could push Cincinnati streetcar plan to USD 130 m". Tramways & Urban Transit. April 2013. p. 124.
  79. ^ Andreasik, Jane (April 29, 2014). "Cincinnati streetcar: New concerns about substations taking parking spots". WCPO-TV. Scripps Media, Inc. Archived from the original on September 3, 2014. Retrieved August 30, 2014.
  80. ^ "Connector | Ridership data - Streetcar".
  81. ^ "Best Summer, Best Month on Record!". Ridership Records - Streetcar. City of Cincinnati. Retrieved September 27, 2023.
  82. ^ a b Wetterich, Chris (October 23, 2015). "Five Cincinnati brewers will make special beers in streetcar's honor". Cincinnati Business Courier. Retrieved October 24, 2015.
edit
KML is not from Wikidata