Clematis Brook station

Clematis Brook station was an MBTA Commuter Rail station in Waltham, Massachusetts. It served the Fitchburg Line, and was located in the Warrendale section of Waltham. It was closed in 1978 due to poor ridership.

Clematis Brook
The former station site photographed in 2015
General information
LocationBeaver Street
Waltham, Massachusetts
Coordinates42°22′58″N 71°12′27″W / 42.382879°N 71.207558°W / 42.382879; -71.207558
Owned byMBTA
Line(s)Fitchburg Route
Platforms1
Tracks2
Other information
Fare zone1
History
ClosedJune 1978[1]
Former services
Preceding station MBTA Following station
Beaver Brook Fitchburg Line
until 1978
Waverley
Preceding station Boston and Maine Railroad Following station
Waltham North Central Mass Branch
until ca. 1960
Waverley
toward Boston
Location
Map

History

edit
 
Former switch to the Central Mass Branch west of the station

The Fitchburg Railroad was completed through Waltham in 1845. In 1881, it was joined by the Massachusetts Central Railroad (MC), which paralleled it from west of Beaver Street to the Fitchburg Cutoff. By 1883, the MC was succeeded by the Central Massachusetts Railroad, which resumed service in 1885. By 1891, the two railroads shared a single Clematis Brook station on the east side of Beaver Street.[2] (The other stations on the parallel segment – Waverley, Belmont, and Hill Crossing – had separate buildings for the two lines into the 20th century.[3]) The Boston and Maine Railroad (B&M) gained control of the Central Massachusetts in 1887, followed by the Fitchburg in 1900.

In 1952, the B&M abandoned the duplicate Central Mass tracks during a grade separation project at Waverley. After the track consolidation, the Central Mass Branch diverged from the Fitchburg mainline just west of Clematis Brook. Central Mass Branch trains ceased serving the station between 1957 and 1962.[4][5] The MBTA began subsidizing service in 1965. The remaining Central Mass Branch service was discontinued in 1971.[1] Like nearby Beaver Brook station, Clematis Brook was only served by a handful of rush hour Fitchburg Line trips. The two stations were closed in June 1978, along with Winchester Highlands station on the Lowell Line, due to poor ridership.[1]

The Mass Central Rail Trail—Wayside was extended east to Beaver Street in 2023.[6]

References

edit
  1. ^ a b c Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  2. ^ Walker, O.W. (1891). "Part of the Metropolitan District" (Map). Atlas of Massachusetts. 1:14,400. Geo. H. Walker & Co. pp. 58–59.
  3. ^ Walker, O.W. (1904). "Part of the Metropolitan District (Belmont and Vicinity)" (Map). Atlas of Massachusetts. 1:14,400. Geo. H. Walker & Co. pp. 58–59.
  4. ^ Complete Rail Schedule, Boston and Maine Railroad, October 27, 1957, p. 36 – via Wikimedia Commons
  5. ^ Passenger Train Schedules, Boston and Maine Railroad, April 29, 1962 – via Wikimedia Commons
  6. ^ "Design of the Waltham Component of the Mass Central Rail Trail – Wayside Branch". Pare Corporation. Retrieved March 19, 2024.
edit

  Media related to Clematis Brook station at Wikimedia Commons