Rhode Island Avenue Trolley Trail

(Redirected from College Park Trolley Trail)

38°59′35.7″N 76°55′37.5″W / 38.993250°N 76.927083°W / 38.993250; -76.927083

The Rhode Island Avenue Trolley Trail (formerly known as the College Park Trolley Trail) is a 3.9-mile (6.3 km) long rail trail within the Cities of College Park Maryland, Riverdale Park Maryland and Hyattsville Maryland. It is located within the Anacostia Trails Heritage Area.[1]

Description

edit

The trail is built on part of the abandoned right-of-way of the City and Suburban Railway.[2] On the southern end, the trail begins at the end of Charles Armentrout Drive in Hyattsville where it intersects with the Northwest Branch Trail. It then travels along Route 1 and the west side of the railroad tracks through Hyatsville. It continues into the town of Riverdale Park and to the Riverdale Park Railroad station before moving away from the railroad through the "Riverdale Park Station" mixed-use development. It then crosses into the town of College Park and follows the right-of-way alongside and through the median of existing sections of Rhode Island Avenue to Calvert Street, where it becomes a sidepath alongside the avenue. At Rossborough lane, the trail resumes and, across Campus Drive, it is shared by the Paint Branch Trail of the Anacostia Tributary Trail System for a short distance. The trail is on-road between Pierce Avenue and Berwyn House Road before resuming. The last piece of trail passes through the Berwyn Neighborhood Playground on its way to the northern trailhead at Greenbelt Road.

The north end from Paducah St/Edgewood Rd to Greenbelt Rd in College Park is no longer considered part of the Trolley Trail, as it is a fully on-road bike lane.

History

edit

The right of way was originally Route 82 of the streetcar system of Washington, DC. The section used by the trail was built by the City and Suburban Railway in 1899. The full line stretched from New York Avenue and 15th St NW in Washington, DC to Berwyn at Greenbelt Road, where a turn table was built and was extended to Laurel, Maryland in 1902. City and Suburban operated cars on the line until 1926 when it was absorbed by the Washington Railway and Electric Company which in 1933 became part of Capital Transit and in 1955 DC Transit. During that time the line was shortened, running only to Beltsville by 1948 and only to Berwyn by 1956. In 1956, Congress decided to replace the streetcars with buses and on September 7, 1958 the last streetcar ran the route.

The first section of the trail, a 1.1-mile (1.8 km) long stretch north from Campus Drive (formerly known as Paint Branch Parkway) to Greenbelt Road in College Park, opened in 2002. A second 1.5-mile (2.4 km) long section, in the form of bike lanes on Rhode Island Avenue, from Greenbelt Road north to Paducah Road opened in 2005. The bike lanes are no longer branded as part of the trail. In 2007, a third section south of the existing trail from Calvert Road to Albion Road in Riverdale Park opened.[3] These three sections were originally called the College Park Trolley Trail.

In 2008 a plan was formed to extend the trail south to Riverdale and Hyattsville and rebrand it as the Rhode Island Avenue Trolley Trail.[4]

In 2012 work on the southern extension began with a five block long section from Madison to Hamilton in Hyattsville which was built as part of the EYA Arts District development.[5] In 2013-14 that section was extended south to Farragut and north to Queensberry road by M-NCPPC.[6][7][8] By 2016, that segment was extended north to Tuckerman Street.

In late 2017, wayfinding signage kiosks and a formal website were created.[9]

In November 2017, the first of the Riverdale Station sections, from Albion Road to 47th Street and from Tuckerman to just south of Van Buren opened. In November 2018, the short section from 47th Street to Woodberry Street in Hyattsville was completed and opened.[10] In 2020-2021, the one block section from Van Buren to Woodbury was finished, completing the Riverdale Station section and creating one complete trail from Farragut Street in Hyattsville to Greenbelt Road in College Park.

During the construction of the southern portion, parts of the northern portion were improved. In 2011, a new trail crossing at Campus Drive was constructed.[11] In 2013, the trail gap between Calvert Road and Campus Drive was closed when a segment was built as a sidepath along Rhode Island Avenue.[12] In early 2017, a section of the sound barrier south of Campus Drive was removed to allow the trail to pass straight through rather than divert around the barrier.

In 2022 MDOT SHA began work on the final southern extension from Farragut Street to Charles Armentrout Drive in Hyattsville - connecting the trail to the Northwest Branch Trail and the ribbon was cut on that part on December 5th, 2023.[13]

MODT plans to improve the Greenbelt Rd-University Boulevard pedestrian-crossing in College Park in the future.

References

edit
  1. ^ "Bike & Water Trails – Anacostia Trails Heritage Area". Retrieved 2024-05-30.
  2. ^ Wallace, James (8 May 1929). The history of the Maryland line of the Washington Railway and Electric Company. University of Maryland College Park. p. 11. Retrieved 13 November 2018.
  3. ^ "GOVERNOR O'MALLEY ANNOUNCES FUNDING TO CONSTRUCT FINAL SEGMENT OF COLLEGE PARK TROLLEY TRAIL" (Press release). Maryland-National Capital Park & Planning Commission. 2007-06-27. Archived from the original on 2009-12-16. Retrieved 2009-08-14.
  4. ^ Toole Design Group. "Rhode Island Avenue Trolley Trail Extension Trail Concept Report". Retrieved 13 November 2018.
  5. ^ Sibley, E. "RHODE ISLAND AVENUE TROLLEY TRAIL EXTENSION UNDER CONSTRUCTION". Anacostia Watershed Society. Archived from the original on 10 February 2012. Retrieved 13 November 2018.
  6. ^ Hines, Susan (17 November 2023). "Trolley Trail will connect Hyattsville, Riverdale Park". Hyatsville Life and Times. Retrieved 23 October 2024.
  7. ^ Cranor, David. "Tour of new section of PG Trolley Trail". The WashCycle. Retrieved 13 November 2018.
  8. ^ "Trolley Trail will connect Hyattsville, Riverdale Park". Hyattsville Life. 17 November 2013. Retrieved 13 November 2018.
  9. ^ "Rhode Island Avenue Trolley Trail". Hyattsville Community Development Corporation. 2016-11-28. Retrieved 2017-10-13.
  10. ^ Cranor, David. "RI Ave Trolley Trail takes another step towards completion". TheWashCycle. Retrieved 13 November 2018.
  11. ^ Cranor, David. "New Trolley Trail crossing". The Wash Cycle. Retrieved 13 November 2018.
  12. ^ Kabir, Fazul. "Trolley Trail Construction Gets the Green light". Retrieved 13 November 2018.
  13. ^ "US 1 (Rhode Island Avenue) Trolley Trail". Retrieved 23 October 2024.
edit