Damuqiao Road (simplified Chinese: 大木桥路; traditional Chinese: 大木橋路; pinyin: Dàmùqiáo Lù) is an interchange station between Line 4 and Line 12 of the Shanghai Metro. This station was one of 16 that opened in the third section from (Qufu Road to Qixin Road) of Line 12 on 19 December 2015.[2] Between 31 December 2005 and 29 December 2007, this station served as the western terminus of Line 4 before the remaining section of the loop between here and Lancun Road opened on 29 December 2007.
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Damuqiao Road and Lingling Road (零陵路) Xuhui District, Shanghai China | |||||||||||||||
Coordinates | 31°11′40″N 121°27′48″E / 31.194439°N 121.463403°E | |||||||||||||||
Operated by | Shanghai No. 3/4 Metro Operation Co. Ltd. | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | ||||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Station layout
editG | Entrances and Exits | Exits 1-4 |
B1 | Line 4 Concourse | Faregates, Station Agent |
Line 12 Concourse | Faregates, Station Agent | |
B2 | Counterclockwise | ← Line 4 to Dong'an Road |
Island platform, doors open on the left
| ||
Clockwise | Line 4 to Luban Road → | |
B3 | Westbound | ← Line 12 towards Qixin Road (Middle Longhua Road) |
Island platform, doors open on the left
| ||
Eastbound | Line 12 towards Jinhai Road (Jiashan Road) → |
References
edit- ^ (三)市政基础设施. shtong.gov.cn. Archived from the original on 18 June 2014. Retrieved 31 July 2018.
- ^ a b Xu, Huili; Qu, Chunliang (2 November 2015). "Metro Lines 12, 13 Adjust Departure Time of First, Last Trains from Oct. 24". Graphics by Ji Zhoujie. Shanghai Shentong Metro Group. Archived from the original on 19 July 2018. Retrieved 12 November 2015.