Dongchengyi Road (simplified Chinese: 东城一路; traditional Chinese: 東城一路; pinyin: Dōngchéngyī Lù) is a station on the Pujiang line of the Shanghai Metro. The station is located at the intersection of Sanlu Highway and Dongchengyi Road,[1] between Puhang Road and Huizhen Road, the southern terminus of the line. It began passenger trial operations with the rest of the Pujiang line on March 31, 2018.[3]
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Sanlu Highway at Dongchengyi Road[1] Minhang District, Shanghai China | ||||||||||
Coordinates | 31°01′58″N 121°31′40″E / 31.032639°N 121.527812°E | ||||||||||
Operated by | Shanghai Keolis Public Transport Operation Management Co. Ltd.[2] | ||||||||||
Line(s) | Pujiang line | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | March 31, 2018 | ||||||||||
Services | |||||||||||
|
History
editThis station opened for passenger operations on March 31, 2018, concurrent with the opening of the rest of the Pujiang line.[4]
Description
editThe station is located at the intersection of Sanlu Highway and Dongchengyi Road, in the Minhang District of Shanghai. The station structure is elevated, with its platforms located one level above the street. The platform level consists of two side platforms. There are two separate concourses, which each allow access to one side platform only. In order to travel between the platforms, passengers must exit the fare-paid area, descend to street level, cross the street, and re-ascend on the other side. Washrooms are available at street level, outside the fare-paid area, on the east side of the street. Like all stations on the Pujiang line, the station is fully accessible. The concourse and platform level is connected by two elevators, one on each side of Sanlu Highway.[5]
Exits
edit- Exit 2: Dongchengyi Road, Sanlu Highway east side (access to Huizhen Road-bound platform only)
- Exit 1: Dongchengyi Road, Sanlu Highway west side (access to Shendu Highway-bound platform only)[5]
References
edit- ^ a b 轨交8号线三期取名“浦江线” 将与沈杜公路站接驳_大申网_腾讯网. sh.qq.com (in Chinese (China)). Archived from the original on 2020-11-06. Retrieved 2017-12-28.
- ^ "Shanghai metro line 8 phase 3 | Shanghai Keolis". shkeolis.com. Archived from the original on 2020-08-10. Retrieved 2017-12-28.
- ^ 注意!轨交浦江线预计明年一季度开通试运营! [Pujiang line to begin trial operations in first quarter of 2018]. news.163.com (in Chinese (China)).
- ^ 全自动无人驾驶!浦江线3月31日通车 全天运营约17小时. CNR.cn (in Chinese (China)).
- ^ a b Shanghai Shentong Metro Group Co., Ltd. 车站信息. Shanghai Metro (in Chinese). Retrieved 2018-04-08.