The CRRC Qingdao Sifang CR151 is a type of electric multiple unit to be built for the Cross Island Line of Singapore's Mass Rapid Transit (MRT) system. The contract was awarded to CRRC Sifang, a consortium of CRRC Qingdao Sifang Company and Singapore CRRC Sifang Railway Vehicles Service, and as of June 2023 the Land Transport Authority (LTA) has purchased 44 six-car trains. They will be delivered from 2027, before the opening of the line's first phase in 2030.[2]
CRRC Qingdao Sifang CR151
| |
---|---|
In service | 2030 (Projected) |
Manufacturer | CRRC Qingdao Sifang |
Built at | Qingdao, Shandong, China |
Constructed | 2025 – 2030 |
Entered service | 2030 |
Number under construction | 264 Vehicles (44 Sets) |
Formation | 6/8 per trainset DT–Mp–Mi+Mi–Mp–DT |
Capacity | 1920 passengers per 6-car train |
Depots | Changi East |
Lines served | CRL Cross Island Line |
Specifications | |
Car body construction | Welded aluminium |
Train length | 138.5 m (454 ft 4+3⁄4 in) |
Car length |
|
Width | 3.2 m (10 ft 6 in) |
Height | 3.7 m (12 ft 1+5⁄8 in) |
Doors | 1,450 mm (57+1⁄8 in), 10 per car, 5 per side |
Maximum speed | 90 km/h (56 mph) (service) |
Electric system(s) | 1,500 V DC Overhead conductor rail |
Current collector(s) | Pantograph |
Safety system(s) | Siemens Trainguard Sirius moving block CBTC ATC under ATO GoA 4 (UTO)[1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Tender
editThe tender for trains under the contract CR151 was closed on 23 September 2022 with four bids. The LTA has shortlisted all of them and the results has been released. The contract includes the option of purchasing up to 11 more trains.[2] The tender results were published on 14 June 2023 on the Singapore government's GeBIZ platform:[3]
S/N | Name of tenderer | Amount ($) (Option 3) |
---|---|---|
1 | Alstom Transpot (S) Pte Ltd | 919,461,500.00 (SGD) |
2 | Construcciones Y Auxiliar De Ferrocarriles, S.A. | 1,032,961,078.00 (SGD) +
655,898,277.00 (EUR) |
3 | CRRC Qingdao Sifang Co., Ltd. | 588,959,039.00 (SGD) |
4 | Hyundai Rotem Company | 743,186,400.0000 (SGD) |
Features
editEach train car will have 10 doors per car (5 on each side), condition monitoring and diagnostic systems for early detection of potential equipment faults. Some trains will also be equipped with an Automated Track Inspection system to monitor the condition of the running rail and OCR in real time. Between train cars, the gangway width is at 1.6 metres (5 ft 3 in).[4] Unlike most of the MRT lines in Singapore, these trains will draw power from a 1,500 V DC overhead conductor rail.[2]
Train formation
editThe coupling configuration of a CR151 in revenue service is DT–Mp–Mi+Mi–Mp–DT.
References
edit- ^ "Siemens Mobility awarded contract to deliver CBTC on Singapore's ..." press.siemens.com. 17 April 2023. Retrieved 17 December 2023.
- ^ a b c "LTA buys 44 new trains for Cross Island Line for $589 million". The Straits Times. 14 June 2023. Retrieved 13 December 2023.
- ^ "GeBIZ | Opportunity Details". www.gebiz.gov.sg. Retrieved 16 June 2023.
- ^ "Cross Island Line to get 44 new trains". CNA. 14 June 2023. Retrieved 13 December 2023.