The Thomson–East Coast Line (TEL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore. Coloured brown on the rail map, it is fully underground. When fully completed, the sixth line on the country's MRT network will serve 32 stations around 43 kilometres (27 mi) in length, becoming one of the world's longest driverless rapid transit lines. It runs along a combined north–south and east–west corridor, starting in the north at Woodlands town, passing through Upper Thomson and the towns of Ang Mo Kio and Bishan, heading south to the city-centre at Orchard Road and Marina Bay, subsequently heading eastwards along the eastern coast of the country through Kallang, Marine Parade and southern Bedok before ending at Upper East Coast.
Thomson–East Coast Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | Malay: Laluan MRT Thomson-Pantai Timur Chinese: 汤申-东海岸地铁线 Tamil: தாம்சன் - ஈஸ்ட் கோஸ்ட் எம்ஆர்டி வழி | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational (Stages 1–4) Under construction (Stage 5) Under planning (extension to Changi Airport) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Land Transport Authority | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Singapore | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Woodlands North Bayshore Sungei Bedok (2026) Tanah Merah (2040) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 32 (27 operational, 2 under construction, 3 unopened) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid Transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Mass Rapid Transit (Singapore) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | SMRT Trains Ltd (SMRT Corporation) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Mandai East Coast (2026) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Kawasaki–CRRC Qingdao Sifang T251 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 160,000 (February 2023)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned opening | 2026 (Stage 5) 2028 (Founders' Memorial MRT station) 2040 (extension to Changi Airport) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 31 January 2020 28 August 2021 (Stage 2) 13 November 2022 (Stage 3)[a][2] 23 June 2024 (Stage 4) | (Stage 1)|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 40.6 km (25.2 mi) (Operational) 2.2 km (1.4 mi) (Under construction) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Fully underground[3] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC third rail[4] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 100 km/h (62 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The line was first announced by the Land Transport Authority (LTA) on 15 August 2014, merging the previously planned and distinct Thomson (TSL) and Eastern Region (ERL) lines. By then, construction of the TSL had already begun in January 2014. The line is being opened in stages, beginning with Stage 1[b] on 31 January 2020. Stage 2[c] opened on 28 August 2021 and Stage 3[d] opened on 13 November 2022. Stage 4[e] opened on 23 June 2024 while Stage 5[f] is scheduled to open sometime in 2026. Meanwhile, Mount Pleasant and Marina South stations, which were structurally completed as part of Stage 3, remains non-operational due to the perceived lack of developments in the area at this given time.
In January 2019, an infill station known as Founders' Memorial was announced to complement its namesake, with the LTA additionally considering to integrate the Changi Airport Branch that is currently a part of the East West Line (EWL) into the TEL. When fully opened, it is expected to serve about 500,000 commuters daily in the initial years before rising to one million in the long-term. It is the fourth MRT line to be operated by SMRT Trains Ltd and also the fourth to be completely automated and driverless. The line is currently served by Mandai Depot, with the East Coast Integrated Depot opening in 2026, and services are operated by the T251 electric multiple unit (EMU) rolling stock manufuactured by Kawasaki–CRRC.[5]
New and improved signage was introduced to alI stations along the TEL, which saw less text and wordiness in place of more illustrations and visualisations. Moreover, ever since the TEL began operations, all the other MRT lines on the wider network have since been represented by their initials in addition to the exits being represented numerically rather than alphabetically.[6]
History
editThomson Line
editThe Thomson Line (TSL) was first announced on 25 January 2008. Several architectural and engineering consultancy packages were released in 2010 which indicated an increase in the number of stations from 18 in the initial announcement to the current 22 and length of the line from 27 to 30 km (17 to 19 mi).[7]
On 16 June 2011, LTA announced the location of the depot for the line, which was due to begin construction at the end of 2012. It also announced Woodlands as an interchange with the existing North South Line and an additional station located near to Republic Polytechnic.[8]
On 29 August 2012, it was announced that the completion of the TSL was pushed back to 2019 onwards instead of the indicative timeline of 2018 announced in the Land Transport Masterplan.[9]
Construction of the TSL began in January 2014.[10] The groundbreaking ceremony took place on 27 June that year at Woodlands. All the working station names were confirmed as the final names except for Sin Ming station which was changed to Bright Hill.[11]
Eastern Region Line
editThe Eastern Region Line (ERL) was first announced on 23 October 2001.[12] In its preliminary plans, ERL was to have been a 40 kilometre rectangular loop that would complement the existing East West line and enhance inter- and intra-town travelling in the eastern region. It would have looped around the Jalan Besar and East Coast areas, intersecting the Circle Line and other lines along the way, benefiting residents in Tampines, Bedok, Marine Parade, MacPherson and Kaki Bukit.[13] The northern part of the Eastern Region Line became the third stage of the Downtown Line. The southern part of the Eastern Region Line became the East Coast stretch of the Thomson-East Coast line. Sungei Bedok would become an interchange between the Downtown and the Thomson-East Coast lines.
On 11 July 2012, Josephine Teo, Minister of State, Ministry of Finance and Ministry of Transport, announced that the Land Transport Authority is starting architectural and engineering consultancy studies for the Eastern Region Line, which will eventually connect to the Thomson Line.[14]
The director of rail services from LTA, Melvyn Thong, said on 29 May 2013 at the Modern Railways conference that there are plans to extend the Eastern Region Line to the future Changi Airport Terminal 4 which was at that time, set to be ready by 2017[15] but on 1 June that year, the Land Transport Authority clarified that the Eastern Region Line will not provide an MRT link to the planned Terminal 4.[16] On 30 August that year, Minister of State for Transport Josephine Teo unveiled plans that it will be linked to the future Changi Airport Terminal 5, a mega terminal, which will be the largest terminal in Singapore upon completion in the 2030s.[17]
Merging of Eastern Region Line and Thomson Line
editThe Eastern Region Line was merged with the Thomson Line on 15 August 2014 to form the Thomson–East Coast Line, extending the project from three to five stages, with nine more stations.[18]
The groundbreaking ceremony for the East Coast stretch took place at Marine Parade on 21 July 2016. All the working station names, including Xilin on the Downtown Line extension, were confirmed as the final names except for Amber station which was changed to Tanjong Katong. The authorities are also considering extending the Thomson–East Coast line to all terminals at Changi Airport, including the upcoming Terminal 5, announced Transport Minister Khaw Boon Wan.[19][20]
Line operations
editSMRT Trains Ltd was appointed as the operator of the line on 15 September 2017.[21]
On 28 August 2019, the Land Transport Authority awarded several non-fare businesses along the line, with Asiaray Connect awarded an advertising contract and a consortium, made up of SMRT Experience, JR Business Development SEA and Alphaplus Investments appointed to run retail space. This is the first time the LTA outsourced these non-fare businesses.[22]
On 19 September 2019, Transport Minister Khaw Boon Wan revealed that the opening of the first stage of the Thomson–East Coast Line from Woodlands North to Woodlands South stations was delayed to January 2020 from the indicative time of 2019 announced earlier,[23] subsequently confirmed as 31 January 2020. Self-assistance kiosks were installed at all TEL MRT stations and will be rolled out to all stations.[24][25]
On 11 January 2020, SMRT and LTA hosted an open house for the first stage of the line, with the stage opening for revenue service on 31 January 2020.[26]
The opening of the second stage was initially delayed to the first quarter of 2021 due to the effects of the COVID-19 pandemic circuit breaker period; the project was subsequently further delayed to the third quarter of 2021.[27][28][29]
On 30 April 2021, LTA handed over Stage 2 stations along the line to SMRT to get the section ready for operations.[30] On 30 June 2021, Transport Minister S. Iswaran announced that Stage 2 will open on 28 August 2021.[31] LTA announced on 13 August 2021 that there would be a virtual open house held from 23 to 27 August 2021 since all physical open houses were disallowed due to the COVID-19 pandemic.[32]
On 28 August 2021, Stage 2 of the line opened, extending the line from Woodlands South to Caldecott.[33]
On 23 November 2021, LTA announced that Mount Pleasant and Marina South stations will only open when housing developments in these areas are ready, instead of opening as part of Stage 3.[34] On 9 March 2022, Transport Minister S Iswaran announced in Parliament that TEL 3 would open in the 2nd half of 2022.[35]
On 17 August 2022, LTA handed over Stage 3 stations along the line to SMRT to get the section ready for operations by the end of 2022.[36][37]
On 7 October 2022, during a visit to the Outram Park and Maxwell TEL stations, Transport Minister S. Iswaran announced that the third stage of the line will commence operations on 13 November 2022.[38][39][40]
On 13 December 2023, LTA announced that it would hand over Stage 4 stations along the line to SMRT in early 2024, in preparation for the opening of the stations.[41] Acting Minister for Transport Chee Hong Tat said in an interview with Lianhe Zaobao that the authorities hope to open the sector in the first half of that year.[42] The Stage 4 stations were handed over to SMRT on 6 February 2024.[43][44]
On 5 March 2024, LTA announced that Stage 4 would open on 23 June that year.[45] A preview of Stage 4 was held on 21 June, with free rides for all 7 stations, with a free shuttle train running from Gardens by the Bay to Tanjong Rhu to ferry riders to the Stage 4 stations.[46]
On 23 June 2024, the fourth stage of the line opened, extending from Gardens by the Bay to Bayshore.[47]
Airport extension
edit
On 25 May 2019, LTA confirmed that it will extend the Thomson–East Coast Line from Sungei Bedok to Changi Airport Terminal 5. Construction works to extend the TEL to the existing Changi Airport MRT station, which is a terminal station of the East West MRT line commenced in 2020. The stretch of East West MRT line between Tanah Merah and Changi Airport will be converted to form part of the Thomson–East Coast Line extension.[48][49][50] The extension is expected to begin construction after 2022,[51] with train services commencing by 2040. In May 2024, LTA confirmed modification works for existing stations will start from 2025 after the contract for addition and alteration works is awarded.[52]
Route
editThe 43-kilometer (26.7 mi) Thomson-East Coast line runs in a north-south direction between Woodlands North and Gardens by the Bay stations and west-east direction between Gardens by the Bay and Sungei Bedok stations.[23] Beginning at Woodlands North, the line runs south passing the neighbourhood of Woodlands. Between Woodlands South and Springleaf, a branch has been implied for trains going to Mandai depot.[53] It continues heading south-east, bypassing Ang Mo Kio, towards Lentor before curving south towards Mayflower station.[31]
After Bright Hill station, the line curves south towards Caldecott station before curving west passing the unopened Mount Pleasant towards Stevens station, which it has an interchange with the Downtown line. From Napier station, the line heads east towards Orchard station, also interchanging with the North-South line. It continues heading south between Orchard and Havelock stations, cutting underneath the Singapore River before heading south-east towards Outram Park station, which has an interchange with the East-West and North-East lines.[40]
It then enters the Downtown Core, by heading in a south-east direction towards Marina Bay station, which has an interchange with the North-South and Circle lines. The line then heads north-east towards Gardens by the Bay, passing underneath the Kallang Basin, before heading north passing Founders’ Memorial station, which is scheduled to be opened in 2028. It then curves eastwards between Tanjong Rhu and Bayshore station, paralleling Marine Parade Road. In 2026, the line will continue east towards Sungei Bedok, the future terminus with which it will have an interchange with the Downtown line.[19]
Stations
editStation codes for the line are brown, corresponding to the line's colour on the system map. Most stations are island stations, with the exception of Napier, Maxwell, Shenton Way, Marina Bay, Katong Park and Tanjong Katong, which have stacked side platforms[54] whilst Tanjong Rhu station has side platforms.[55][56]
A station box is located in between Springleaf and Lentor station provisionally named "Tagore".[57]
Date Opened | Project | Description |
---|---|---|
31 January 2020 | Stage 1 | Woodlands North – Woodlands South |
28 August 2021 | Stage 2 | Springleaf – Caldecott |
13 November 2022 | Stage 3 | Stevens – Gardens By The Bay |
23 June 2024 | Stage 4 | Tanjong Rhu – Bayshore |
2026 | Stage 5 | Bedok South – Sungei Bedok |
In tandem with Founders' Memorial (2028) | Founders' Memorial station | Founders' Memorial station between Gardens by the Bay and Tanjong Rhu |
In tandem with Mount Pleasant Housing Estate | Mount Pleasant station | Mount Pleasant station between Caldecott and Stevens |
In tandem with Marina South developments | Marina South station | Marina South station between Marina Bay and Gardens by the Bay |
By the 2040s | Thomson-East Coast Line Extension | Sungei Bedok – Changi Airport |
Changi Airport – Tanah Merah (Conversion from East-West Line to Thomson-East Coast Line) |
Legend
Elevated |
Line terminus |
Transfer outside paid area |
Ground-level |
Wheelchair accessible |
Bus interchange |
Underground |
Civil Defence Shelter |
Other transportation modes |
List
Station code | Station name | Images | Interchange; Adjacent transportation |
Opening | Cost |
---|---|---|---|---|---|
TE1 – RTS |
Woodlands North | Johor Bahru–Singapore RTS (2026) | 31 January 2020; 4 years ago |
S$337 million[g] | |
TE2 NS9 |
Woodlands | North–South Line ― Woodlands Woodlands Temporary |
S$292 million[h] | ||
TE3 |
Woodlands South | — | S$143.7 million[i] | ||
S$421.6 million[j] | |||||
TE4 |
Springleaf | 28 August 2021; 3 years ago |
S$189.8 million[k] | ||
S$383.3 million[l] | |||||
TE5 |
Lentor | S$247.2 million[m] | |||
TE6 |
Mayflower | S$174.3 million[n] | |||
TE7 CR13 |
Bright Hill | Cross Island Line (2030) | S$454.4 million[o] | ||
TE8 |
Upper Thomson | — | S$374.0 million[p] | ||
TE9 CC17 |
Caldecott | Circle Line | S$284.8 million[q] | ||
TE10 |
Mount Pleasant | To be opened in tandem with future developments[34][58][59][60] | TBA | S$207.3 million[r] | |
TE11 DT10 |
Stevens | Downtown Line | 13 November 2022;
2 years ago |
S$441.0 million[s] | |
TE12 |
Napier | — | S$188.8 million[t] | ||
TE13 |
Orchard Boulevard | S$142.5 million[u] | |||
TE14 NS22 |
Orchard | North–South Line | S$498.3 million[v] | ||
TE15 |
Great World | — | S$315.8 million[w] | ||
TE16 |
Havelock | S$210.3 million[x] | |||
TE17 EW16 NE3 |
Outram Park | East–West Line North East Line |
S$300.8 million[y] | ||
TE18 |
Maxwell | — | S$221.8 million[z] | ||
TE19 |
Shenton Way | S$368 million[aa] | |||
TE20 NS27 CE2 |
Marina Bay | North–South Line Circle Line Extension |
S$425 million[ab] | ||
TE21 |
Marina South | To be opened in tandem with future developments[61] | TBA | S$488.0 million[ac] | |
TE22 |
Gardens by the Bay | — | 13 November 2022; 2 years ago |
S$331.0 million[ad] | |
TE22A |
Founders' Memorial | To be opened in tandem with Founders' Memorial[62] | 2028; 4 years' time |
$242.4 million[ae] | |
TE23 |
Tanjong Rhu | — | 23 June 2024; 5 months ago |
S$293.9 million[af] | |
TE24 |
Katong Park | S$293.5 million[ag] | |||
TE25 |
Tanjong Katong | S$145.6 million[ah] | |||
TE26 |
Marine Parade | S$555.3 million[ai] | |||
TE27 |
Marine Terrace | S$360.6 million[aj] | |||
TE28 |
Siglap | S$175.76 million[ak] | |||
TE29 |
Bayshore | S$295.9 million[al] | |||
Stage 5 (under construction, to be ready by 2026) | |||||
TE30 |
Bedok South | Bedok South | 2026; 2 years' time |
S$188.3 million[am] | |
TE31 DT37 |
Sungei Bedok | Downtown Line (2026) | S$417.5 million[an] | ||
Thomson-East Coast Line extension (future) | |||||
TBA | Cross Island Line Changi Airport Terminal 5 |
2040; 16 years' time |
TBA | ||
TBA | Changi Airport | Changi Airport Terminals 1-4 ― Changi Airport | |||
Expo | Downtown Line | ||||
Tanah Merah | East–West Line |
Depots
editNumber | Depot name; Lines |
Location | Image | Line-specific stabling capacity |
Cost | Opening |
---|---|---|---|---|---|---|
1 |
Mandai | Mandai | 90 trains | S$329 million[53][63][64] | 31 January 2020;
4 years ago | |
2 |
East Coast EWL DTL |
Changi | 62 trains | S$1.99 billion[65][66][67] | 2026;
2 years' time |
Train control
editThe Thomson–East Coast Line is equipped with Alstom Urbalis 400 Communications-based train control (CBTC) moving block signalling system with Automatic train control (ATC) under Automatic train operation (ATO) GoA 4 (UTO).[68][69][70] The subsystems consist of Automatic train protection (ATP) to govern train speed, Iconis Automatic Train Supervision (ATS) to track and schedule trains and Smartlock Computer-based interlocking (CBI) system that prevents incorrect signal and track points to be set.
Alstom supplies the platform screen doors for the Thomson–East Coast Line.[70]
Rolling stock
editThe first generation of rolling stock being introduced onto the Thomson–East Coast Line is the T251, built by Japan's Kawasaki Heavy Industries and China's CRRC Qingdao Sifang in Qingdao, China. The trains are built with 5 doors per side per car, which is the very first in Singapore to have this configuration. They are also completely automated and driverless. The trains are housed at the Mandai Depot and the future East Coast Integrated Depot (shared with the Downtown and the East West lines).[71]
See also
editNotes
edit- ^ Excluding Mount Pleasant and Marina South.
- ^ From Woodlands North to Woodlands South.
- ^ From Springleaf to Caldecott.
- ^ From Stevens to Gardens by the Bay.
- ^ From Tanjong Rhu to Bayshore.
- ^ Bedok South and Sungei Bedok.
- ^ Contract T202
- ^ Contract T203
- ^ Contract T205
- ^ Contract T206
- ^ Contract T207
- ^ Contract T208
- ^ Contract T209
- ^ Contract T210
- ^ Contract T211
- ^ Contract T212
- ^ Contract T213
- ^ Contract T215
- ^ Contract T216
- ^ Contract T217
- ^ Contract T218
- ^ Contract T219
- ^ Contract T220
- ^ Contract T221
- ^ Contract T222
- ^ Contract T223
- ^ Contract T225
- ^ Contract T226
- ^ Contract T227
- ^ Contract T228
- ^ Contract T302
- ^ Contract T303
- ^ Contract T305
- ^ Contract T306
- ^ Contract T307
- ^ Contract T308
- ^ Contract T309
- ^ Contract T310
- ^ Contract T311
- ^ Contract T312
References
edit- ^ "Land Transport DataMall". mytransport.sg. Archived from the original on 21 August 2020. Retrieved 20 August 2020.
- ^ "SMRT Trains Ops Review 2020" (PDF). Archived (PDF) from the original on 17 July 2021. Retrieved 13 January 2021.
- ^ "Land Transport Master Plan 2040: Bringing Singapore Together | Press Room | Land Transport Authority". www.lta.gov.sg. Archived from the original on 23 August 2019. Retrieved 26 May 2019.
- ^ "LTA | News Room". Archived from the original on 5 September 2020. Retrieved 22 January 2020.
- ^ "LTA unveils sites for Thomson Line terminal station". CNA. Archived from the original on 18 June 2011. Retrieved 17 June 2011.
- ^ "Factsheet: Introducing the New MRT System Map and Transit Signage System". LTA Singapore. Archived from the original on 28 August 2021. Retrieved 7 August 2021.
- ^ "Archived copy". Archived from the original on 17 July 2011. Retrieved 2 October 2010.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Thomson Line Depot To Be Constructed in Mandai". Land Transport Authority. Archived from the original on 7 August 2011. Retrieved 16 June 2011.
- ^ "Speech by Mr Lui Tuck Yew, Minister for Transport, at the Inspection of Downtown Line 1 Station and Announcement of Thomson Line alignment, 29 August 2012, 10.00am at Telok Ayer Station". Ministry of Transport. 29 August 2012. Archived from the original on 8 September 2012. Retrieved 29 August 2012.
- ^ "Caldecott – It's Beginning". Thomson Line Construction. 13 January 2014. Archived from the original on 16 January 2014. Retrieved 16 January 2014.
- ^ "Groundbreaking Ceremony of the Thomson Line". Ministry of Transport. 27 June 2014. Archived from the original on 7 September 2020. Retrieved 11 October 2019.
- ^ "Speech by Mr Yeo Cheow Tong at the Official Opening of Dover Station on 23 Oct 2001". MOT. Archived from the original on 5 September 2020. Retrieved 11 July 2019.
- ^ "SPEECH BY MR RAYMOND LIM, MINISTER FOR TRANSPORT, AT THE VISIT TO KIM CHUAN DEPOT, 25 JANUARY 2008, 9.00 AM". www.nas.gov.sg. Archived from the original on 19 November 2020. Retrieved 16 March 2022.
- ^ "Speech by Mrs Josephine Teo, Minister of State, Ministry of Finance and Ministry of Transport, at DTL3 Tunnelling Works Ceremony". Ministry of Transport. 11 July 2012. Archived from the original on 27 November 2020. Retrieved 27 November 2020.
- ^ "Direct MRT link to Changi Airport planned". The Straits Times. 30 May 2013. Archived from the original on 29 July 2014. Retrieved 15 August 2014.
- ^ "No Terminal 4 link on Eastern Region Line". asiaone. 1 June 2013. Archived from the original on 11 August 2014. Retrieved 4 June 2013.
- ^ Sim, Royston (30 August 2013). "Changi T5 to land by mid 2020s, capacity to handle 50m passenger movements a year". The Straits Times. Archived from the original on 25 June 2021. Retrieved 24 June 2021.
- ^ "Joint News Release by the Land Transport Authority (LTA) & Singapore Land Authority (SLA) – Thomson–East Coast Line: New MRT Links in the East". Land Transport Authority. 15 August 2014. Archived from the original on 19 August 2014.
- ^ a b "Names of MRT stations on Thomson–East Coast Line (East Coast stretch) announced". Today Online. 21 July 2016. Archived from the original on 22 July 2016. Retrieved 21 July 2016.
- ^ Valerie Koh (21 July 2016). "Upcoming Thomson–East Coast Line may link to all terminals at Changi Airport". Today Online. Archived from the original on 22 July 2016. Retrieved 21 July 2016.
- ^ "SMRT Trains Appointed to Operate the Thomson–East Coast Line". Land Transport Authority. 15 September 2017. Archived from the original on 15 September 2017. Retrieved 15 September 2017.
- ^ Abdullah, Zhaki (28 August 2019). "Retail and advertising operations to be outsourced on Thomson-East Coast Line". The Straits Times. Archived from the original on 29 August 2019. Retrieved 29 August 2019.
- ^ a b Tan, Christopher (19 September 2019). "First phase of Thomson-East Coast Line to open before Chinese New Year next year, with three stations in Woodlands". The Straits Times. Archived from the original on 19 September 2019. Retrieved 19 September 2019.
- ^ Liu, Vanessa (11 December 2019). "First three stations of Thomson-East Coast Line to begin service on 31 Jan; free travel for commuters for three days". The Straits Times. Archived from the original on 11 December 2019. Retrieved 11 December 2019.
- ^ Wong, Kai Yi (31 January 2020). "3 stations on Thomson-East Coast Line begin operations". The Straits Times. Archived from the original on 5 February 2020. Retrieved 15 January 2020.
- ^ "LTA | Getting Around | Public Transport | Rail Network | Thomson-East Coast Line". Land Transport Authority. Archived from the original on 21 April 2020. Retrieved 6 May 2020.
- ^ Tan, Christopher (23 March 2020). "Stage 2 of Thomson-East Coast Line likely to open after July; operating hours shortened to prepare for it". The Straits Times. Archived from the original on 5 September 2020. Retrieved 5 September 2020.
- ^ Ng, Charmaine (30 July 2020). "Works for Stage 2 of Thomson-East Coast Line progressing at slower pace due to constraints: LTA". The Straits Times. Archived from the original on 31 July 2020. Retrieved 5 September 2020.
- ^ Grace, Ho (16 December 2020). "Stage 2 of Thomson-East Coast Line to be delayed by another six months to Q3 2021". The Straits Times. Archived from the original on 17 December 2020. Retrieved 16 December 2020.
- ^ Tjendro, Johannes (30 April 2021). "LTA hands over 6 Thomson East-Coast Line stations to SMRT ahead of Q3 opening". CNA. Archived from the original on 12 May 2021. Retrieved 12 May 2021.
- ^ a b Abdullah, Zhaki (30 June 2021). "Second stage of Thomson-East Coast Line to begin operations on Aug 28". CNA. Archived from the original on 30 June 2021. Retrieved 30 June 2021.
- ^ "Thomson-East Coast Line Stage 2 Virtual Open House from 23 to 27 August 2021". LTA. 13 August 2021. Archived from the original on 6 June 2022. Retrieved 13 August 2021.
- ^ Begum, Shabana (28 August 2021). "Commuters on first trains at new TEL2 stations reminisce about inaugural 1980s MRT rides". The Straits Times. Archived from the original on 28 August 2021. Retrieved 29 August 2021.
- ^ a b Ng, Keng Gene (23 November 2021). "Mount Pleasant, Marina South MRT stations to open in tandem with housing developments". The Straits Times. Archived from the original on 23 November 2021. Retrieved 24 November 2021.
- ^ "11 more Thomson-East Coast stations to open in second half of 2022; more 'inclusive' changes for vulnerable commuters". CNA. 9 March 2022. Archived from the original on 26 April 2022. Retrieved 26 April 2022.
- ^ Kok, Yufeng (17 August 2022). "11 new Thomson East Coast Line MRT Stations on track to open by end of year". The Straits Times. Archived from the original on 17 August 2022. Retrieved 17 August 2022.
- ^ "11 MRT stations along Thomson-East Coast Line on track to open by end of the year: LTA". CNA. 17 August 2022. Archived from the original on 17 August 2022. Retrieved 17 August 2022.
- ^ Yong, Clement (7 October 2022). "11 new TEL stations, from Stevens to Gardens by the Bay, to open on Nov 13; free rides on Nov 11". The Straits Times. Archived from the original on 7 October 2022. Retrieved 7 October 2022.
- ^ "Factsheet: Thomson – East Coast Line Stage 3 to Open for Passenger Service from 13 November 2022". LTA. Archived from the original on 7 October 2022. Retrieved 7 October 2022.
- ^ a b Yeoh, Grace (7 October 2022). "11 Thomson-East Coast Line stations to open on Nov 13; free rides available on Nov 11". CNA. Archived from the original on 30 November 2022. Retrieved 7 October 2022.
- ^ Loi, Esther (13 December 2023). "TEL Stage 4: LTA to hand over stations to SMRT in early 2024 as work nears completion". The Straits Times. ISSN 0585-3923. Retrieved 13 December 2023.
- ^ Rahim, Nisha (10 January 2024). "Authorities aiming to open TEL Stage 4, from Tanjong Rhu to Bayshore, in first half of 2024: Chee Hong Tat". Yahoo News Singapore. Retrieved 11 January 2024.
- ^ Kok, Yufeng (6 February 2024). "TEL Stage 4 stations handed over to SMRT for final tests". The Straits Times. ISSN 0585-3923. Retrieved 6 February 2024.
- ^ Loh (6 February 2024). "Thomson-East Coast Line 4: LTA Hands Over 7 New Stations to SMRT; Slated for Opening in 1H 2024". SGTrains. Retrieved 7 February 2024.
- ^ Yeoh, Grace (5 March 2024). "7 new Thomson-East Coast Line stations to open on Jun 23; commuters can ride for free on Jun 21". CNA. Retrieved 5 March 2024.
- ^ William, Whitney (20 June 2024). "6 things you can do at the public preview of TEL Stage 4 MRT stations on June 21". The Straits Times. ISSN 0585-3923. Retrieved 22 June 2024.
- ^ "Seven MRT stations on TEL 4 open for passenger service". The Straits Times. 23 June 2024. Retrieved 23 June 2024.
- ^ "LTA to assess feasibility of new rail line connecting northeast and south Singapore". CNA. 25 May 2019. Archived from the original on 25 May 2019. Retrieved 25 May 2019.
- ^ "At a glance: Key updates to MRT, bus network and more for 2040 master plan". TODAYonline. 25 May 2019. Archived from the original on 25 May 2019. Retrieved 25 May 2019.
- ^ "Land Transport Master Plan 2040: Bringing Singapore Together | Press Room | Land Transport Authority". Land Transport Authority. Archived from the original on 23 August 2019. Retrieved 26 May 2019.
- ^ "最迟明年中招标进行研究 地铁汤东线延长线2022年后动工". 早报 (in Chinese). 18 November 2019. Archived from the original on 25 December 2019. Retrieved 25 December 2019.
- ^ Kok, Yufeng (1 May 2024). "Preparatory work to connect Thomson-East Coast Line with Changi Airport to begin in 2025". The Straits Times.
- ^ a b "LTA | News Room | News Releases | LTA Awards Four Contracts for Thomson Line". 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
- ^ Yong, Clement (25 October 2022). "From tunnelling 1.8m under a live MRT line to diverting a canal: LTA sets out TEL3 engineering challenges". The Straits Times. Archived from the original on 29 October 2022. Retrieved 16 November 2022.
- ^ Smith, Claire (22 January 2020). "Diaphragm walls: Making the cut". Ground Engineering. Retrieved 24 June 2024.
- ^ Tjoe, Lee Nian (22 May 2024). "TEL Stage 4: The challenge of building an MRT tunnel close to the KPE". The Straits Times. Retrieved 23 May 2024.
- ^ "Thomson Line – Contract 208". NOMA Consulting. Retrieved 8 June 2020.
- ^ Ng, Michelle (23 November 2021). "Around 5,000 HDB flats to be built in Mount Pleasant; first BTO project for sale within next 5 years". The Straits Times. Archived from the original on 23 November 2021. Retrieved 23 November 2021.
- ^ "Joint Press Release by HDB, URA & SLA – HDB Unveils Plans for a New Public Housing Estate at Site of Former Police Academy in the Mount Pleasant Area". HDB. Archived from the original on 23 November 2021. Retrieved 24 November 2021.
- ^ "HDB Unveils Plans for a New Public Housing Estate at Site of Former Police Academy in the Mount Pleasant Area". Singapore Land Authority. Archived from the original on 23 November 2021. Retrieved 24 November 2021.
- ^ Gene, Ng Keng (23 November 2021). "Mount Pleasant, Marina South MRT stations to open in tandem with housing developments". The Straits Times. Archived from the original on 23 November 2021. Retrieved 24 November 2021.
- ^ Tan, Christopher (7 January 2019). "Thomson-East Coast Line to have station at Founders' Memorial in Marina Bay". The Straits Times. Archived from the original on 7 January 2019. Retrieved 7 January 2019.
- ^ Journal, Tunnelling (18 October 2013). "LTA awards four Thomson contracts". The Tunnelling Journal. Archived from the original on 13 February 2020. Retrieved 19 September 2019.
- ^ "Factsheet: Thomson-East Coast Line – Mandai Depot". www.lta.gov.sg. Archived from the original on 19 September 2019. Retrieved 19 September 2019.
- ^ "LTA Awards Contract to Build World's First Four-In-One Depot". Land Transport Authority. 21 March 2016. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
- ^ Gabriel, Anita (21 March 2016). "LTA awards S$1.99b contract to build world's first four-in-one depot". The Business Times. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
- ^ Lim, Adrian (21 March 2016). "Korea-based construction firm to build four-in-one train and bus depot for $1.99 billion". The Straits Times. Archived from the original on 1 February 2022. Retrieved 14 November 2020.
- ^ 2020-01-31T15:53:00+00:00. "Singapore's Thomson–East Coast metro line opens". Railway Gazette International. Archived from the original on 15 June 2020. Retrieved 15 June 2020.
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ "GE Transportation Chosen by Singapore's Land Transport Authority (LTA) To Supply the Signaling of New Thomson and Eastern Region Lines". Archived from the original on 11 March 2017. Retrieved 20 October 2017.
- ^ a b "Singapore's LTA selects GE Transportation for driverless CBTC solution". Railway Technology. 7 May 2014. Archived from the original on 5 August 2017. Retrieved 6 March 2016.
- ^ "4-in-1 rail and bus depot in East Coast saved taxpayers S$2 billion: Khaw Boon Wan". CNA. Archived from the original on 23 February 2018. Retrieved 14 December 2019.
External links
edit- Media related to Thomson–East Coast MRT line at Wikimedia Commons
- Thomson–East Coast Line
- Thomson–East Coast Line