The Frederick E. Everett Turnpike, also called the Central New Hampshire Turnpike, is a controlled-access toll road in the U.S. state of New Hampshire, running 44 miles (71 km) from the Massachusetts border at Nashua north to Concord. The Everett Turnpike is named for Frederick Elwin Everett, the first commissioner of the New Hampshire Department of Transportation.[2]

Everett Turnpike marker
Everett Turnpike
Central New Hampshire Turnpike
Map
Everett Turnpike highlighted in red
Route information
Maintained by NHDOT Bureau of Turnpikes
Length39.867 mi[1] (64.160 km)
Existedc. 1955–present
Component
highways
Major junctions
South end US 3 in Tyngsborough, MA
Major intersectionsRaymond Wieczorek Drive in Bedford
I-293 / NH 101 / US 3 in Bedford

I-93 in Hooksett

I-89 in Bow
North end I-93 / NH 9 in Concord
Location
CountryUnited States
StateNew Hampshire
CountiesHillsborough, Merrimack
Highway system

The turnpike is part of the New Hampshire Turnpike System, and is operated by the New Hampshire Department of Transportation's Bureau of Turnpikes. There are two tolled sections, a southern one in Bedford and a northern tolled section in Hooksett; the remainder of the turnpike is toll-free. Each of the tolled segments costs a maximum of $1.00 for passenger cars passing through the mainline tollbooths, with lower rates charged on the ramp tolls for traveling shorter distances. A 30% discount is also offered for NH E-ZPass account holders only.

Built prior to the Interstate Highway System, the route was completed in the mid-1950s as a single highway from Nashua to Concord. Today, the route is overlaid with portions of several other routes: U.S. Route 3 from the Massachusetts border to New Hampshire Route 101A in Nashua, unnumbered from there until New Hampshire Route 101 in Bedford, I-293 from there until I-93 in Hooksett, and I-93 from Hooksett to Concord. There is also a short segment concurrent with New Hampshire Route 3A in Manchester.

Route description

edit

Much of the turnpike's length has been overlapped by other numbered routes. Portions of the road are shared with US-3, I-93, and I-293. The southern portion of the turnpike, in Nashua, is posted as US-3, serving as an extension of the US-3 freeway (Northwest Expressway) from Burlington, Massachusetts. North of Exit 7 in Nashua, the turnpike runs by itself and has no number, but parallels US-3, which is a toll-free local road variously known as Concord Street (within the city of Nashua) and the Daniel Webster Highway (within Merrimack and Bedford). Approaching Bedford in the Manchester area, the turnpike is joined by I-293 which, splits off from a concurrency with NH-101. At Exit 4 (exits are numbered for I-293 on this stretch), NH-3A joins the freeway, and the concurrency passes through Manchester, near the downtown area of the city. Upon passing Manchester, Route 3A splits off at Exit 7, I-293's last northbound exit. The freeway passes into Hooksett, and I-293 ends at an interchange with I-93. The Everett Turnpike ceases to be signed at this interchange, but joins I-93 northbound and continues towards Concord, interchanging with the southern terminus of I-89 along the way. No definitive northern terminus for the turnpike exists as far as signage is concerned. This endpoint was originally at a traffic circle next to downtown Concord that has since been replaced by Exit 14 with NH-9.

There are two mainline toll plazas on the turnpike, in Bedford and Hooksett, that each charge $1.00 for cash and out of state E-ZPass users. The Bedford mainline toll plaza, located between Exit 13 and I-293, replaced the Merrimack toll plaza (formerly located at what is now Exit 11) in the early 1990s. Ramp tolls also exist at I-93 Exit 11 at the mainline toll plaza in Hooksett. E-ZPass readers were installed in all toll locations in 2005, and the state currently offers a 30% discount for using an NHDOT issued E-ZPass. Major rest areas combined with state-run liquor stores are located on either side of the highway in Hooksett just north of the mainline toll plaza on I-93. On July 18, 2014, the Exit 12 ramp tolls in Merrimack were removed, and on January 1, 2020, the Merrimack Exit 11 ramp tolls were removed.[3] Toll collection at Exit 10 in Merrimack ended on December 31, 2021.[4]

The proposed (but mostly unbuilt) Circumferential Highway around the east side of Nashua is defined as part of the turnpike.[5] Henri A. Burque Highway, the surface road that US-3 uses to get between exit 7 of the turnpike and the Daniel Webster Highway in northern Nashua, is also part of it.[1]

Signage

edit
 
Road sign showing access to the Everett Turnpike
 
The northern end of I-293 as viewed from I-93 northbound. The Everett Turnpike joins I-93 North at this interchange, but no sign indicates this.

Signs for the Everett Turnpike consist of a rectangle with a rounded bottom, a green circle, and green text that says "Everett Turnpike" above the circle, with the word "Turnpike" curved along the top edge of the circle; this signage is similar in design to that for other New Hampshire turnpikes. For the US 3 segment in Nashua, there is an Everett Turnpike sign in Massachusetts just south of the border northbound alongside the US 3 shield on an overhead sign, and several others along overhead signs through Nashua. Mile markers also contain the Everett Turnpike shield in Nashua, and combined US 3 and Everett Turnpike shields are posted along the side of the road on stand-alone posts, though most on-ramp signage only indicates US 3.

Signs for the turnpike are most prominent on the Merrimack-Bedford segment, which lacks any concurrent US or Interstate route. Along this section, the Everett Turnpike shield appears on on-ramp direction signs, along the side of the highway on signposts, and on overhead reassurance signs.

Along the I-293 segment in Manchester, signage is similar to the Nashua US 3 section, though mile markers have the I-293 shield instead of the Everett Turnpike shield.

Though the turnpike continues north to Concord, it is not signed north of the I-293 merge in Hooksett. On I-93 North, the exit for I-293 is signed as I-293/Everett Turnpike South, while the mainline is signed as "I-93 North (a toll road)". On I-293 North, Everett Turnpike signs stop at the merge, with I-93 North signed by itself. There is no indication of the northern terminus on I-93 in either direction. Southbound, the first emergence of turnpike signage is after the exit onto I-293. The sole mention of the Everett Turnpike north of the I-293 merge is on New Hampshire Route 3A at the intersection with Hackett Hill Road leading to exit 11 in Hooksett. A sign with the Turnpike and I-93 shields notes the highway as leading north to Concord and south to Manchester. North of Exit 11, there are no turnpike signs on intersecting highways, including I-89.

There are turnpike mile markers only from the Massachusetts state line to the interchange with I-293 and Route 101. North of there, the mile markers and sequential exit numbers relate to the concurrent Interstate highways.

History

edit

The highway first opened in 1955, from the Daniel Webster Highway (modern exit 3) in South Nashua to Queen City Avenue (modern I-293 Exit 4) in Manchester, with a single exit between the termini at NH 101A/Amherst Street in Nashua (modern exit 7). There was one toll booth at Thornton's Ferry in Merrimack.[6] In 1957, a second portion was opened from Queen City Avenue north to Manchester Street (US 3) in Concord (modern I-93 exit 13). The second segment had a toll booth installed at Hooksett. In 1958, the section from Hooksett northwards was incorporated into I-93. Two additional exits (modern exits 5 and 6) were added in 1960 and one more (modern exit 4) in 1964. Finally, the last segment of the route, an extension from the then-southern terminus at Daniel Webster Highway to the Massachusetts border to meet the Northwest Expressway, was completed in 1966.[7]

Little additional work was done on the turnpike for the next 12 years. In 1978, the turnpike was widened from four lanes to six between the Hooksett tolls and I-89 in Bow. In 1986, a new exit was opened at Somerset Parkway in Nashua, exit 8 (formerly exit 7W), providing a bypass of the congested exit 7 interchange, which carried access to Amherst Street and Henri Burque Highway (US 3). In 1990 and 1993, two new exits were opened in Merrimack, exit 10 (Industrial Drive) and exit 11 (Continental Boulevard), along with the relocation of the mainline toll booth from Merrimack to Bedford.[8] In the late 1990s, work began on the southern segment of the route through Nashua from the Massachusetts border to exit 8 (Somerset Parkway) as it was widened to six lanes, and the entire route south of Daniel Webster Highway (exit 3) was rebuilt, including a new exit (exit 1A-2) to connect to the Sagamore Bridge to Hudson, a rebuild of exit 1 (Spit Brook Road), and a set of collector distributor lanes. The project was completed in 2002.[7]

In the mid 2000s, I-293 exit 5 was rebuilt, adding additional ramps and widening the northbound side to three lanes from just south of exit 5 to exit 7 (NH 3A). Finally, in 2011, Raymond Wieczorek Drive (exit 13), a connector from the Everett Turnpike from just south of the I-293 merge to Manchester–Boston Regional Airport, was built.[7]

Exit list

edit
CountyLocationmi[1]kmOld exit
[9][10][5][11][12]
New exitDestinationsNotes
HillsboroughNashua0.000.00 
 
US 3 south (Northwest Expressway)
Continuation into Massachusetts; south end of US 3 overlap
0.500.801Spit Brook Road – South Nashua
1.492.402 
 
To NH 3A / Daniel Webster Highway – Hudson
Access via Circumferential Highway; signed as exit 1A from northbound collector–distributor lane
2.594.1713Daniel Webster Highway – South NashuaSouthbound left exit and northbound entrance; originally exit 1
3.185.124East Dunstable Road
4.697.5525  
 
NH 111 to NH 111A – Nashua, Hudson, Pepperell, MA
Signed as exits 5E (east) and 5W (west); originally exit 2
5.138.265E-A5ASimon StreetNorthbound exit only; formerly signed as exits 5E-A
6.2210.016  NH 130 (Broad Street) – Hollis
6.7410.857 
 
  US 3 north / NH 101A – Nashua Downtown, Amherst, Milford
Signed as exits 7E (north/east) and 7W (west); north end of US 3 overlap
7.6612.337W8 
 
 
To NH 101A west – Amherst, Milford
Access via Somerset Parkway
Merrimack9.8315.8210 
 
Industrial Drive to US 3
Formerly tolled northbound exit and southbound entrance
11.1017.86811  US 3 – MerrimackFormerly tolled northbound exit and southbound entrance; access via Greeley Street
14.9424.0412  US 3 / Bedford RoadNorthbound exit and southbound entrance; formerly tolled
Bedford13   US 3 / Raymond Wieczorek Drive – Manchester–Boston Regional AirportInterchange opened to public on November 10, 2011; US 3 not signed
Bedford Toll Plaza
19.3931.21103 
 
   
 
I-293 south / NH 101 / US 3 to NH 114 – Portsmouth, Exeter, Bedford, Milford
No direct northbound access to US 3; south end of I-293 overlap; exit number not signed
Manchester21.2234.1564  
 
  US 3 (Second Street / Queen City Avenue) / NH 3A south / NH 114A – Manchester
South end of NH 3A overlap
21.9635.345Granite Street – West Manchester
23.2737.4576Amoskeag Street / Goffstown Road
24.2539.037 
 
NH 3A north – Hooksett
Northbound exit and southbound entrance; north end of NH 3A overlap
MerrimackHooksett27.1843.74 
 
I-93 south – Salem, Boston
 
 
I-293 ends
South end of I-93 overlap; northern terminus of I-293
811 
 
To NH 3A – Hooksett
Access via Hackett Hill Road
Hooksett Toll Plaza
Bow36.2458.32 
 
I-89 north – Lebanon, White River Junction, VT
Southern terminus of I-89
Concord36.9159.4012  
 
 
NH 3A (South Main Street) to I-89 north – Bow Junction
Signed as exits 12N (north) and 12S (south); I-89 not signed southbound
38.0861.2813  US 3 (Manchester Street) – Downtown Concord
39.2063.0914  NH 9 (Loudon Road) – State Offices
 
 
I-93 north – Plymouth
Continuation north; north end of I-93 overlap
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

edit

References

edit
  1. ^ a b c GRANIT Archived August 3, 2013, at the Wayback Machine GIS data - NH Public Roads
  2. ^ Brown, Janice A. (August 23, 2006). "New Hampshire's Turnpike History". Cow Hampshire. BlogHarbor. Retrieved January 15, 2009.
  3. ^ Cronin, Mike (December 31, 2019). "NH won't charge toll at Exit 11 of Everett Turnpike starting Wednesday". WMUR. Retrieved January 21, 2020.
  4. ^ King, Jason (December 30, 2021). "Tolls to be removed on Everett Turnpike at Exit 10". WMUR. Retrieved December 31, 2021.
  5. ^ a b New Hampshire Statutes Title XX Chapter 237
  6. ^ "Contract P2650S Plans" (PDF). NHDOT Contract Plans. Retrieved May 17, 2024.
  7. ^ a b c "F.E. Everett Turnpike: Historical overview". Boston Roads. Retrieved June 8, 2021.
  8. ^ "Contract 10059A Plans" (PDF). NHDOT Contract Plans. Retrieved May 17, 2024.
  9. ^ 1968 Indiana Toll Road map (has exits 3-10 from Nashua to Milford, then present exits 11-13 from Hooksett to Concord)
  10. ^ 1985 USGS topo
  11. ^ 1985 USGS topo
  12. ^ 1957 USGS Suncook quadrangle
edit
KML is from Wikidata