Original file (1,326 × 1,984 pixels, file size: 462 KB, MIME type: image/jpeg)
This is a file from the Wikimedia Commons. Information from its description page there is shown below. Commons is a freely licensed media file repository. You can help. |
Summary
DescriptionPort of Dipolog Terminal Building (2020).jpg |
Cebuano: 10 KA PROYEKTONG IMPRASTRAKTURA SA KAGAMHANANG LOKAL SA DIPOLOG GI TURN-OVER
Mokabat sa pulo (10) ka nagkadaiyang proyektong imprastruktura nga nakumpleto sa pagtrabaho sa buhatan sa City Engineering ning dakbayan alang karung tuiga ang malampusong gi-turn over karung adlawa, Hulyo 16. Ang maong napulo ka proyektong imprastruktura ang gilangkoban sa mga mosunod: pagtukod sa Sub-station Building, alang sa mga personahe sa kapulisan sa Barangay Punta, Rehab/Improvement of Old Building sa Dipolog City Port Complex sa Barangay Galas, Fabrication of Dipolog Port Perimeter Fence and Alley sa Barangay Galas, Construction of 4 classrooms 2 storey bldg., sa Sta. Filomena Elementary School, Construction of 3 Barrel Reinforced Concrete Box Culvert ug Construction of PCCP Approach for Box Culvert, Road Concreting didto sa Barangay Sta. Isabel, Completion of Second Floor of Day Care Center (Establishment of Nutrition Post Clinic) sa Barangay Miputak, Construction of Drainage Canal sa Calibo Street Barra Biasong Circumferential Road ug Construction of Drainage Canal didto sa Mabini Street, Barangay Biasong ning dakbayan. Si Mayor Darel Dexter T. Uy mismo maoy nanguna sa gipahigayong ‘ribbon cutting’ ug pagtunol sa “Key of Responsibility’’ inubanan sa presensiya nila ni City Planning and Development Officer , Engr. Albert Alimpulos ug Engr. Susan Ualat sa City Engineering Office alang sa pag turn-over sa maong mga proyekto. Dako ang kalipay nga gibati sa Mayor atol niini gumikan sa nakitang kalampusan pinaagi sa pag-turn-over sa maong mga proyekto nga makatabang alang sa kalambuan dinhi sa dakbayan ilabina sa aspeto sa edukasyon, kalinaw, kaluwasan ug uban pa . Atol niini, mipabati sa iyang kalipay ang principal sa Sta. Filomena Elementary School sa nadawat nga 4 units 2 storey building ngadto ni Mayor Uy. Si Police Lieutenant Virginie P. Bartiana ang mapasalamaton usab sa proyekto nga Sub-station Building nga gipahimutang sa Punta ug lakip ang mga punong barangay nga nakapahimulos sa maong proyekto ang nagmapasalamaton usab. (CIO-gom)English: 10 INFRASTRACTURE PROJECTS OF THE CITY GOVERNMENT OF DIPOLOG WERE TURNED-OVER
About ten (10) different infrastructure projects completed by the City Engineering Office in this city for this year were successfully turned over today, July 16. The ten infrastructure projects are composed of the following: construction of Sub-station Building for police personnel in Barangay Punta, Rehab/Improvement of Old Building in Dipolog City Port Complex in Barangay Galas, Fabrication of Dipolog Port Perimeter Fence and Alley in Barangay Galas, Construction of 4 classrooms 2 storey [building] in Sta. Filomena Elementary School, Construction of 3 Barrel Reinforced Concrete Box Culvert and Construction of PCCP Approach for Box Culvert, Road Concreting in Barangay Sta. Isabel, Completion of Second Floor of Day Care Center (Establishment of Nutrition Post Clinic) in Barangay Miputak, Construction of Drainage Canal in Calibo Street, Barra, Biasong, Circumferential Road and Construction of Drainage Canal in Mabini Street, Barangay Biasong in this city. Mayor Darel Dexter T. Uy himself led the ribbon cutting and handing over of the "Key of Responsibility" in the presence of the City Planning and Development Officer, Engr. Albert Alimpulos and Engr. Susan Ualat of the City Engineering Office for the turn-over of those projects. The Mayor was very happy during this due to the success seen through the turn-over of these projects that help for the development of the city, especially in the aspect of education, peace, safety and others. During this, the principal of Sta. Filomena Elementary School expressed happiness for receiving the 4 units 2 storey building by Mayor Uy. Police Lieutenant Virginie P. Bartiana is also grateful for the Sub-station Building project that was set up in Punta and including the barangay chiefs who benefited from the project are also grateful. (CIO-gom) |
Date | |
Source | https://www.facebook.com/photo?fbid=981068782352853&set=pcb.981061912353540 |
Author | Dipolog City Government |
Licensing
Public domainPublic domainfalsefalse |
This work is in the public domain in the Philippines and possibly other jurisdictions because it is a work created by an officer or employee of the Government of the Philippines or any of its subdivisions and instrumentalities, including government-owned and/or controlled corporations, as part of their regularly prescribed official duties; consequently, any work is ineligible for copyright under the terms of Part IV, Chapter I, Section 171.11 and Part IV, Chapter IV, Section 176 of Republic Act No. 8293 and Republic Act No. 10372, as amended, unless otherwise noted. However, in some instances, the use of this work in the Philippines or elsewhere may be regulated by this law or other laws.
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 15:06, 16 July 2023 | 1,326 × 1,984 (462 KB) | Xander Wu | Uploaded a work by Dipolog City Government from https://www.facebook.com/photo?fbid=981068782352853&set=pcb.981061912353540 with UploadWizard |
File usage
The following page uses this file:
Metadata
This file contains additional information, probably added from the digital camera or scanner used to create or digitize it.
If the file has been modified from its original state, some details may not fully reflect the modified file.
Author | Freger S Reyes |
---|---|
Copyright holder | All Rights Reserved |
Original transmission location code | -xvBPM7BQD15lZivPrfV |