English: Schematic sections through the Waitaki dam (Figure A) and powerstation (Figure B). Redrafted from sections originally produced by the Electricity Division of the Ministry of Energy (EDME) and subsequently published in Natusch (1988) The Waitaki Dammed. Scales are approximate; no scales provided in Natusch (1988) although the maximum height of the dam (Figure A) is recorded as 36.5 m, while the powerhouse (in its original form, Figure B) was 106 m long, 45 m wide with an overall height of 40 m.