Florida High-Speed Corridor

(Redirected from Florida High Speed Corridor)

The Florida High-Speed Corridor is a canceled high-speed rail project in the U.S. state of Florida. Initial service would have run between the cities of Tampa and Orlando, with plans to then extend service to South Florida, terminating in Miami. Trains with a top speed of 168 mph (270 km/h) to 186 mph (300 km/h) would run on dedicated rail lines alongside the state's existing highway network.

Florida High-Speed Corridor
Federal Railroad Administration map of the
Florida High-Speed Corridor
Overview
StatusCanceled
Termini
Service
TypeHigh-speed rail
History
OpenedProposed
Technical
Line length324 mi (521 km)[1]
Number of tracks2
Track gauge4 ft 8+12 in (1,435 mm)
Operating speed168–186 mph (270–300 km/h)

Construction of the line was slated to begin in 2011, with the initial Tampa-Orlando phase completed by 2014.[2] On February 16, 2011, Florida Governor Rick Scott formally announced that he would be rejecting federal funds to construct the high-speed railway, thereby killing the Florida High-Speed Rail project. Governor Scott said the project would be "far too costly to taxpayers" and that "the risk[s] far outweigh the benefits".[3]

In the wake of the project's cancellation, a private sector express passenger service running across much of the proposed route has been proposed by All Aboard Florida, now known as Brightline. This service began operations in 2018 and now runs passenger trains between Orlando and Miami. Its extension from Orlando to Tampa is in the early planning stages and has yet to be fully funded.

Proposal

edit

After the original federal proposal in the 1960s, U.S. federal and state governments revisited the idea of fast trains occasionally. The Passenger Railroad Rebuilding Act of 1980 led to the funding of high-speed corridor studies in 1984. Private-sector consortia intending to build high-speed lines were created in Florida, Ohio, Texas, California, and Nevada. Maglev trains became a new field of interest. They were officially added to the definition of "railroad" in 1988 and were studied repeatedly. Five high-speed corridors were officially endorsed in October 1992 following the passage of the Intermodal Surface Transportation Efficiency Act of 1991.[4] TEA-21 and other legislation continued to be passed with mentions of high-speed rail, but lacking funding or real direction.[5]

Planning

edit

Original referendum

edit
 
This section of I-4 was reconstructed in the late 2000s; the new highway alignment added a wide median for the future construction of the Orlando-Tampa high-speed rail line

In November 2000, Florida voters approved an amendment to Florida's constitution mandating the state establish a system of high-speed trains exceeding 120 mph (190 km/h) to link its five largest urban areas, with construction commencing by November 1, 2003. The Florida Legislature enacted the Florida High-Speed Rail Authority Act in March 2001, creating the Florida High-Speed Rail Authority (HSRA).[6] The HSRA established a Vision Plan for the system which proposed construction in several phases.[7] Preliminary assessments and environmental studies were begun to develop an initial phase of the system between Orlando and Tampa.[6]

The first phase, planned for completion in 2009 under the original referendum, would have connected Orlando to Tampa (Phase 1, Part 1), with a later extension to St. Petersburg (Phase 1, Part 2).[8] Later phases might have extended the network to Miami, Fort Myers, Jacksonville, Tallahassee and Pensacola.

The Florida HSRA issued a Request for Proposal to Design, Build, Operate, Maintain and Finance (DBOM&F) the Orlando to Tampa Phase In October 2002. Two of the four received in February 2003 were reviewed further, one from a consortium of Fluor Corp. and Bombardier Transportation and one from Global Rail Consortium. The proposals showed the cost of the Orlando-Tampa route to be approximately $2.4 billion. Both proposals offered private equity contributions to support operations of the system and show the willingness of the private sector to share the risk associated with projected ridership revenues.[6] In June 2003, Florida Governor Jeb Bush vetoed funding for the project that the Florida Legislature approved.[9] The HSRA continued moving forward with the project, using funds already authorized by the federal government, and in October 2003 ranked the Fluor Bombardier proposal first.[6]

In early 2004, Governor Jeb Bush endorsed an effort to repeal the 2000 amendment that mandated the construction of the High-Speed Rail System. On October 27, 2004, the authority voted to prefer the consortium of Fluor Corp. and Bombardier Transportation to build and operate the system, using Bombardier's JetTrain technology. However, a month later in November, Florida voters repealed the 2000 amendment, removing the constitutional mandate for the system. Although the amendment was repealed, no action was taken by the state legislature in regard to the Florida High-Speed Rail Authority Act. With the law still in effect, Florida's HSRA continued to meet, and completed the environmental impact statement for the Tampa-Orlando segment in 2005. With the constitutional mandate gone, funding for the project stopped, and very little action was taken over the next several years.[6]

Plans revived in 2009

edit

Passage of the American Recovery and Reinvestment Act of 2009 designated $8 billion to develop a high-speed intercity passenger rail system. The Federal Railroad Administration named Florida one of ten high-speed rail corridors potentially eligible for federal funding.[10] The HSRA met on February 26, 2009, to begin planning their application for these funds.[11] Due to the passage of time, potential legal issues, and new federal funding criteria rendering the earlier bids from 2003 inapplicable, the decision was made in May 2009 that a new bidding process would be necessary.[12][13] A first round application was submitted in August 2009 for $30 million to conduct a two-year environmental study on the Orlando-Miami route. In October 2009, the authority applied for the second round for the entire Tampa - Orlando - Miami corridor, broken into two components: Orlando-Tampa and Orlando-Miami.[14] Connect Us, a political action committee, was launched on August 18, 2009, to rally public support for these applications.[15]

 
A typical High-Speed Rail cross section in I-4. Note the safety barriers between the tracks and road traffic.

On December 16, the Florida Legislature passed a bill authorizing FDOT to move forward with the purchase from CSX of the Central Florida Rail Corridor for the SunRail commuter rail project and providing additional funding for South Florida's Tri-Rail commuter rail system.[16] Funding of these initiatives was vital to the state's hopes to win federal HSR funding, as it showed the state of Florida was committed to creating a comprehensive rail network allowing connectivity between high-speed rail and local mass transit systems.[17] The legislation also replaced the Florida High-Speed Rail Authority with the Florida Rail Enterprise, a new agency created under the FDOT, responsible for construction, maintenance, and promotion of the state's high-speed rail system, as well as development and operation of publicly funded passenger rail systems in general.[18]

 
Florida High-Speed Rail Authority Logo in 2010

On January 28, 2010, the White House announced that Florida would receive $1.25 billion of its request, about half of the cost of the Tampa-Orlando segment.[1] The state's efforts towards high-speed rail between 2000 and 2005 put Florida ahead of the field in terms of the level of planning already completed, and this proved to be a major factor in winning the funds.[2] The preservation of the I-4 corridor by the FDOT, and completion of the environmental impact studies in 2005 meant that the project could have proceeded to construction in a very short time frame for a relatively affordable cost. In March 2010 the Florida Rail Enterprise was still seeking to refine cost estimates based on advanced engineering, finish development of possible Early Works (Install permanent barrier systems along most of I-4 and remove/relocate elements in median) and contract for bid in 2010 and finally initiate a new bid procurement process specific to the Tampa to Orlando phase.[19] In June 2010, the Federal Railroad Administration issued its record of the final decision, the final stage of approval for the design, purchase of land and construction of phase one. Tendering was thus able to begin.[20] In October 2010, Florida received $800 million more towards construction from the FY 2010 High-Speed Rail allocations.[21]

In December 2010 the US Department of Transportation redistributed approximately $1.2 billion in HSR funds that had been rejected by governors elected in Wisconsin and Ohio. Florida was projected to receive as much as $342.3 million of the reallocated rail funds, which would have closed the gap of the project's projected cost. Construction of the line was to begin in 2011, with the initial phase completed by 2014.[2]

Cancellation

edit

On February 16, 2011, Governor Rick Scott formally announced that he would reject federal funds to construct the project, attempting to kill Florida High-Speed Rail. On March 4, 2011, the Florida Supreme Court unanimously turned down the request of two state senators to force Scott to accept federal funding for the project. Shortly thereafter, U.S. Transportation Secretary Ray LaHood announced that he would be redirecting the funds intended for Florida to other states and, on May 9, awarded $2.02 billion to 22 projects in 15 states.[22]

Extant construction

edit
 
Worker taking soil samples in the median of Interstate 4.

In July 2010, the Florida Department of Transportation began geotechnical sampling along the Orlando-Tampa corridor.[23] The soil would have been tested every 200 feet (61 m) along the route to check soil conditions and allow proper foundation planning, had the project not been canceled.[24]

Route

edit

Phase 1: Tampa to Orlando route

edit
Planned Orlando -Tampa Route
 
 
Orlando International Airport
 
 
 
 
 
 
 
 
 
CSX Transportation "A" Line (Future SunRail)
 
 
 
Orange County Convention Center
 
 
 
 
Walt Disney World
 
Lakeland
 
 
 
 
Tampa
 
Florida Rail Enterprise map of the Orlando Tampa route"

In early planning stages, all routes but the one along the median of Interstate 4 (which has been and is being widened by several road construction projects) were dropped from consideration; alternates used the CSX tracks to the south of I-4. Stations would have been provided at downtown Tampa, northern Lakeland, Walt Disney World, and possibly at the Orange County Convention Center (see below), and at Orlando International Airport.

Orlando area route selection

edit

Two routes were considered in the Orlando area. One would have split from I-4 at the interchange with SR 536, World Center Drive, and run east along SR 536 and SR 417, the Central Florida GreeneWay, to the south entrance to Orlando International Airport, from which it would head north to end at the planned South Terminal. The other route would continue along I-4 to SR 528, the Beachline Expressway, with an extra stop at the Orange County Convention Center and International Drive, and then run east along SR 528 and a new right-of-way east and southeast to the south entrance of the airport.

Journey times

edit

The trains would have been capable of reaching speeds of "168 miles per hour (270 km/h)"[25] but due to the number of proposed stations, a "bullet train would beat a car by only 30 minutes."[26] Proposed journey times for some routes:[27]

Route Distance (miles) Distance (km) Current avg. travel time
(2000 uncongested)
Current avg. travel time
(2000 congested)
Proposed avg. travel time
High-Speed Rail
Convention Center – Orlando Airport 11 miles 18 km 16 minutes 21 minutes 11 minutes
Disney – Orlando Airport 19 miles 30 km 25 minutes 34 minutes 21 minutes
Downtown Tampa – Orlando Airport 84 miles 135 km 1 hour 22 minutes 1 hour 31 minutes 1 hour 4 minutes
Lakeland – Downtown Tampa 31 miles 50 km 39 minutes 40 minutes 22 minutes

Planned stops

edit

The Orlando International Airport was planned to be the Orlando terminus of the initial Orlando-Tampa route. The airport had already invested considerably to accommodate the station, such as the extra length of the taxiway bridge over the southern access road. This station would have provided access for airport passengers and for Orlando's Lynx local bus service.[14][28]

The Orange County Convention Center is the second largest in the United States, located on International Drive, a major tourist strip connecting SeaWorld Orlando and Universal Orlando Resort. The planned intermodal station here would have also provided access to Orlando's Lynx local bus service, and to International Drive's I-Ride trolley.

Walt Disney World was planning to donate a site for the station, although the exact location was never determined. The station would have linked into the extensive Disney Transport bus system.[19] Also, the Walt Disney Company initially announced that if the SR 417 route was built, they would direct tourists to take the train from the airport to Walt Disney World. They would keep busing tourists if the SR 528 route was built. The SR 417 route was initially selected by a 7-1 vote on October 27, 2004. However, in November 2004, the Florida High-Speed Rail Authority dropped the SR 417 from consideration and selected the SR 528 route due to a lack satisfactory progress on the agreements with The Walt Disney Company and Orlando Orange County Expressway Authority.[6]

Two locations were under consideration for a station near Lakeland, Florida. The top choice was near USF Polytechnic followed by a location near Kathleen Road.[19]

A site in downtown Tampa had been cleared for a multi-modal station at the terminus of the route.[19] The station would have been located next to the Marion Transit Center, the main hub of the Hillsborough Area Regional Transit system. A connection to Tampa International Airport was also being considered[citation needed]

Phase 2: Orlando to Miami route

edit
Proposed Orlando -Miami Routes
Both options that were under consideration are shown.[29]
 
 
Orlando International Airport
 
 
 
Phase 1 Route to Tampa
 
 
 
 
Florida's Turnpike Option / Interstate 95 Option
 
 
Melbourne (Interstate 95 Option Only)
 
 
 
Both options run side by side here to Miami
 
 
Fort Pierce
 
 
West Palm Beach
 
 
Fort Lauderdale
 
 
MiamiCentral
 
Florida Rail Enterprise map of the Orlando Miami route

The second phase of the project would have been an Orlando-Miami link. As of the Regional Rail Briefing in Lakeland, Florida, on March 24, 2010, two routes were under consideration. One route followed SR 528 past the Orlando International Airport toward Cape Canaveral, before joining and following Interstate 95 down to Miami. The other route traveled south along Florida's Turnpike to Miami.[19] The environmental impact study for the corridor began in 2010 and would have taken approximately two years to complete.[30]

The higher-speed rail route of Brightline, being developed between Orlando and Miami, closely follows the Cape Canaveral route.[31]

See also

edit

References

edit
  1. ^ a b "Fact Sheet: High Speed Intercity Passenger Rail Program: Tampa - Orlando - Miami". The White House: Office of the Press Secretary. 28 January 2010. Archived from the original on 2017-01-21. Retrieved April 7, 2010.
  2. ^ a b c Jackovics, Ted (January 28, 2010). "Obama calls high speed rail funding a 'down payment'". The Tampa Tribune. Archived from the original on January 5, 2013. Retrieved February 18, 2010.
  3. ^ "UPDATE 1-Florida governor rejects US high-speed rail funds". Reuters. February 16, 2011.
  4. ^ "Chronology of High-Speed Rail Corridors". Federal Railroad Administration. Department of Transportation. July 7, 2009. Archived from the original on February 14, 2010. Retrieved February 13, 2010.
  5. ^ "CFS Report To Congress". High Speed Ground Transportation for America. Federal Railroad Administration. September 1997. Archived from the original on August 25, 2009. Retrieved February 17, 2010.
  6. ^ a b c d e f "Florida High Speed Rail - Overview". Floridabullettrain.org. Archived from the original on 2013-04-14. Retrieved November 9, 2010.
  7. ^ "Rail Corridors". Florida High Speed Rail. Retrieved May 1, 2010.
  8. ^ "Florida High Speed Rail - Project Status - Phases/Schedules". Floridabullettrain.org. Archived from the original on 2012-08-03. Retrieved November 9, 2010.
  9. ^ "Derailed: Florida Amendment for $25B Bullet Train Bites Dust in Vote - Site Selection Online". Siteselection.com. Retrieved November 9, 2010.
  10. ^ "Stimulus Application". Florida High Speed Rail. Archived from the original on June 16, 2010.
  11. ^ "Florida High Speed Rail Authority Board Meeting" (PDF). Archived from the original (PDF) on June 16, 2010. Retrieved April 28, 2010.
  12. ^ "High Speed Rail Commission In the Lead? – Central Florida Political Pulse". Orlando Sentinel. May 16, 2009. Archived from the original on May 28, 2010. Retrieved November 9, 2010.
  13. ^ "Florida High Speed Rail Authority Meeting Thursday, May 14, 2009, 11:00 a.m." (PDF). Archived from the original (PDF) on June 16, 2010.
  14. ^ a b "Vision for High Speed Rail in America" (PDF). Florida High Speed Rail Industry Forum. December 2, 2009. Archived from the original (PDF) on March 27, 2010.
  15. ^ "ConnectUs: Supporting High Speed Rail in Florida". Fastrailconnectus.com. August 18, 2009. Archived from the original on July 2, 2010. Retrieved November 9, 2010.
  16. ^ "News & Events". Sunrail.com. December 16, 2009. Archived from the original on 2010-11-30. Retrieved November 9, 2010.
  17. ^ "News & Events". Sunrail.com. June 26, 2009. Archived from the original on November 30, 2010. Retrieved November 9, 2010.
  18. ^ "HB 1B - Transportation" (PDF). Florida High Speed Rail. Archived from the original (PDF) on June 16, 2010. Retrieved April 28, 2010.
  19. ^ a b c d e "FLORIDA HIGH SPEED RAIL UPDATE:Regional Rail Briefing March 24, 2010, Lakeland" (PDF). Florida Department of Transportation. March 2010. Archived from the original (PDF) on June 16, 2010. Retrieved April 7, 2010.
  20. ^ "Pointers June 2010". Railway Gazette. June 13, 2010. Retrieved November 9, 2010.
  21. ^ "U.S. Transportation Secretary Ray LaHood Announces $2.4 Billion for High Speed Rail Projects". Federal Railroad Administration. October 28, 2010. Archived from the original on November 2, 2010. Retrieved November 9, 2010.
  22. ^ "Mich. wins $200M for high speed rail". The Detroit News.[dead link]
  23. ^ "Bullet Train Work Begins With Soil in I-4 Median". TheLedger.com. July 20, 2010. Archived from the original on June 13, 2011. Retrieved November 9, 2010.
  24. ^ "Work begins on Florida's high speed rail". WTSP.com. Archived from the original on 2013-01-05. Retrieved November 9, 2010.
  25. ^ "Is the U.S. turning a corner on high-speed rail?". CNN. Retrieved June 12, 2016.
  26. ^ "High-Speed Rail Loses Steam in Ohio". Newsweek. 16 August 2010.
  27. ^ AECOM Consulting; Wilbur Smith Associates (November 20, 2002). "Investment Grade Ridership Study - Summary Report" (PDF). Archived from the original (PDF) on June 16, 2010. Retrieved April 28, 2010.
  28. ^ "Passenger Traffic 2006 FINAL". Airports Council International. Archived from the original on September 29, 2007.
  29. ^ "FLORIDA HIGH SPEED RAIL UPDATE:Regional Rail Briefing March 24, 2010, Lakeland" (PDF). Florida Department of Transportation. March 2010. Retrieved April 7, 2010.
  30. ^ "Environmental Studies". Florida High Speed Rail. Archived from the original on June 16, 2010. Retrieved April 26, 2010.
  31. ^ "Passenger Train Travel Miami To Orlando FL - Fort Lauderdale & West Palm Beach". All Aboard Florida. Archived from the original on May 11, 2013. Retrieved June 12, 2016.
edit