Green's Farms station is a commuter rail stop on the Metro-North Railroad's New Haven Line, located in Westport, Connecticut.

Green's Farms
The Green's Farms station building in November 2007
General information
Location2 Post Office Lane
Westport, Connecticut
Coordinates41°07′24″N 73°18′55″W / 41.123316°N 73.315415°W / 41.123316; -73.315415
Owned byConnDOT
Line(s)ConnDOT New Haven Line (Northeast Corridor)
Platforms2 side platforms
Tracks4
ConnectionsLocal Transit Norwalk Transit District: G1, G2, Nyla Farms Shuttle
Construction
Parking466 spaces
Bicycle facilitiesYes; bike racks
Other information
Fare zone18
Passengers
2018846 daily boardings[1]
Services
Preceding station Metro-North Railroad Following station
Westport New Haven Line Southport
Former services
Preceding station New York, New Haven and Hartford Railroad Following station
Westport & Saugatuck
toward New York
Main Line Southport
toward New Haven
Location
Map

Station layout

edit

The station has two high-level side platforms, each six cars long, serving the outer tracks of the four-track Northeast Corridor.[2]: 21  The station has 466 parking spaces, all owned by the state.[3] Interstate 95 borders the parking lots to the north of the station on either side of New Creek Road.

Like other station houses on the New Haven Line, the one at Green's Farms is on the north side of the tracks, just east of New Creek Road, which runs beneath a railroad bridge. Access to the south side of the tracks is down a wooden staircase, under the railroad bridge at New Creek Road, and up another wooden staircase. Part of the platform near the station house is covered, and on the east end of the north platform another, rusty metal canopy covers a small area. A ticket machine is on the north platform near the station house. Bicycle stands are located to the east of the station house.

References

edit
  1. ^ Metro-North 2018 Weekday Station Boardings. Metro-North Railroad Market Analysis/Fare Policy Group. April 2019. p. 6.
  2. ^ "Metro-North Railroad Track & Structures Department Track Charts Maintenance Program Interlocking Diagrams & Yard Diagrams 2015" (PDF). Metro-North Railroad. 2015. Retrieved January 28, 2019.
  3. ^ "Table 1: New Haven Line Parking Capacity and Utilization". Task 2: Technical Memorandum parking Inventory and Utilization: Final Report (PDF). Urbitran Associates Inc. to the Connecticut Department of Transportation. July 2003. p. 6. Archived from the original (PDF) on July 12, 2007.
edit