Guilin Road (Chinese: 桂林路; pinyin: Guìlín Lù) is an interchange station between Line 9 and Line 15 of the Shanghai Metro.
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Yishan Road (宜山路) and Guilin Road Xuhui District, Shanghai China | |||||||||||||||
Coordinates | 31°10′36″N 121°24′43″E / 31.1767°N 121.412°E | |||||||||||||||
Operated by | Shanghai No. 1 Metro Operation Co. Ltd. | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 5 (2 island platforms and 1 side platform) | |||||||||||||||
Tracks | 5 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | 29 December 2007 (Line 9) 27 June 2021 (Line 15)[1] | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
When the line opened on 29 December 2007, it was the eastern terminus of Line 9, with a shuttle bus providing a link between this station and Yishan Road station.[2][3] On 28 December 2008, the extension to Yishan Road was opened and the shuttle bus service was removed.
The line 9 platforms have 3 tracks, one island platform, and one side platform. The inner island platform is not in service. Trains heading to Caolu use the outer island platform, whilst trains towards Songjiang South Railway Station use the side platform. The line 9 platform utilizes the same platform layout as Zhongchun Road on the same line. The line 15 island platform opened on 27 June 2021 in together with the opening of the transfer between the 2 lines.[1]
Station Layout
editG | Entrances and Exits | Exits 1, 4–5, 6, 8 |
B1 | Line 9 Concourse | Faregates, Station Agent |
Line 15 Concourse | Faregates, Station Agent | |
B2 | Side platform, doors open on the right
| |
Westbound | ← Line 9 towards Songjiang South Railway Station (Caohejing Hi-Tech Park) | |
Not in service | ||
Island platform, doors open on the left
| ||
Eastbound | Line 9 towards Caolu (Yishan Road) → | |
B3 | Northbound | ← Line 15 towards Gucun Park (Wuzhong Road) |
Island platform, doors open on the left
| ||
Southbound | Line 15 towards Zizhu Hi-tech Park (Guilin Park) → |
References
edit- ^ a b 6月27日起15号线桂林路站开通初期运营、17号线末班车常态化延时运营30分钟 (in Chinese). 2021-06-25.
- ^ 上海热线新闻中心:9号线换乘其它线方式有变 两线间公交车"接驳" (in Simplified Chinese). July 2007. Archived from the original on 2007-10-10. Retrieved 2018-05-31.
- ^ 上海地铁运营有限公司:轨交9号线3号线将由专车接驳 (in Simplified Chinese). Shanghai Metro. Archived from the original on 2007-10-01. Retrieved 2018-05-31.
External links
edit