The Haneda Airport Access Line (羽田空港アクセス線, Haneda-kūkō akusesu-sen) is a commuter rail line under construction by the East Japan Railway Company (JR East) that will link Haneda Airport to central Tokyo.[1] Construction began on 2 June 2023.[2][3]
Haneda Airport Access Line | |
---|---|
Overview | |
Native name | 羽田空港アクセス線 |
Status | Under Construction |
Locale | Tokyo |
Termini |
|
Service | |
Type | Heavy rail |
History | |
Planned opening | Fiscal 2031 (tentative) |
Technical | |
Number of tracks | 2 |
Track gauge | 1,067 mm (3 ft 6 in) |
Electrification | 1,500 V DC, overhead lines |
Two further branches are proposed to connect the airport west towards Osaki and Shinjuku, and east towards Shin-Kiba along the Rinkai Line.
History
editDue to the growing demand of air travelers using Haneda Airport, especially international travelers, JR East officially announced in the “JR East Group Management Vision V” issued in 2013 that they aimed to improve the accessibility to the airport.[4]
In 2014, JR East released its fundamental construction plan for the accessibility improvement.[5] The plan proposed that an existing disused freight line located southeast of Tamachi Station be connected via a single-track tunnel to the Tokaido Line. The newly-constructed section would be about 5 km (3.1 mi) long, running from the existing Tokyo Freight Terminal to a new Haneda Airport New Station (羽田空港新駅, Haneda-kūkō shin-eki) to be located between Terminal 1 and Terminal 2 via a new underwater tunnel.[6]
In the JR East Group Management Vision "Move Up” issued in 2018, JR East proposed constructing three conventional lines departing from the airport connecting to different parts of Tokyo: the East Yamanote route, the West Yamanote route and the Coastal Area route.[7] In 2019, JR East officially launched the environmental assessment for the new lines.[8]
In 2021, JR East announced that they have received Ministry of Land, Infrastructure, Transport and Tourism approval for construction of the East Yamanote route and intended to start construction in 2022, for completion by 2029.[9] In early April 2023, JR East announced that construction would begin, and that a construction groundbreaking ceremony would take place at a later date in June of that year.[10] The opening date is expected to take place sometime in fiscal 2031, two years later than the initial expected opening date.[11] Construction of the new line is estimated to cost about ¥280 billion (2022) (US$2.13 billion).[11]
Construction of the line officially began on 2 June 2023 with a groundbreaking ceremony.[2][3][10]
Route
editHaneda Airport Access Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Three routes from Tokyo Freight Terminal onwards to the various points in central Tokyo were under consideration. The selected East Yamanote route (東山手ルート) will run from the new airport station located between Terminals 1 and 2 of Haneda Airport to a point near Tamachi Station, using an unused freight line between Tamachi and Tokyo Freight Terminal to connect to the Tokaido Main Line (Ueno-Tokyo Line). By running through trains on the Ueno–Tokyo Line, through service can be offered to Tokyo Station, Ueno Station, and northbound lines including the Takasaki Line, Utsunomiya Line, and Joban Line, allowing service to the northern suburbs of Tokyo. Travel times between Tokyo and Haneda are estimated to decrease from the current 28 minutes to 18 minutes.[12]
Proposed extensions
editThe other two routes remain possible future extensions, although as of 2024 there is no timeline for either.
- West Yamanote Route (西山手ルート): this would connect the new line to Oimachi Station on the Rinkai Line, which operates as a through service with the Saikyo Line connecting to major terminal stations on the west side of the Yamanote Line including Osaki, Ebisu, Shibuya, Shinjuku, and Ikebukuro, as well as points north in Tokyo and Saitama Prefecture. Travel time between Shinjuku and Haneda would be reduced from 43 minutes at present to 23 minutes.[12]
- Coastal Area Route (臨海部ルート): this would connect Tokyo Freight Terminal to the Rinkai Line for Odaiba (Tokyo Teleport Station) and the Tokyo waterfront. This also allows for future through service to the Keiyo Line for Maihama (Tokyo Disney Resort) and points east in Chiba Prefecture. The travel time between Haneda and Shin-Kiba Station on the Keiyo Line would decrease from 41 minutes to 20 minutes.[12]
See also
edit- Keikyū Airport Line
- Tokyo Monorail
- Kama-Kama Line (proposed)
References
edit- ^ "Jr羽田空港アクセス線、鉄道事業許可の詳細。2029年度開業めざす | タビリス". 20 January 2021.
- ^ a b "「羽田空港アクセス線」起工式 東京-羽田が18分、31年度開業へ:朝日新聞デジタル" ["Haneda Airport Access Line" Groundbreaking Ceremony: Tokyo to Haneda Airport in 18 minutes with a 2031 completion]. Asahi Shimbun Digital (in Japanese). 2 June 2023. Archived from the original on 2 June 2023. Retrieved 3 June 2023.
- ^ a b "JR東日本、羽田空港アクセス線の起工式 31年度開業" [JR East groundbreaking ceremony for Haneda Airport access line, services to begin in 2031]. Nihon Keizai Shimbun Online (in Japanese). 2 June 2023. Archived from the original on 2 June 2023. Retrieved 3 June 2023.
- ^ "JR East Group Management Vision V" (PDF). Retrieved 2019-05-17.
- ^ "JR East eyes new, faster access to Haneda airport from central Tokyo". Japan Times.
- ^ "Ministry of Land, Infrastructure, Transport and Tourism permits Haneda Airport Access Line". 20 January 2021. Retrieved 2021-01-25.
- ^ "JR East eyes new, faster access to Haneda airport from central Tokyo". The Japan Times Online. 2014-08-19. ISSN 0447-5763. Retrieved 2019-05-12.
- ^ "Environmental test for new train link to Haneda to begin in spring". Kyodo News. 2019-02-10. Retrieved 2019-05-17.
- ^ "JR East's Haneda Airport Access Line to Open in FY 2029". 21 January 2021. Archived from the original on 25 January 2021. Retrieved 21 April 2021.
- ^ a b "JR東日本,羽田空港アクセス線(仮称)の工事に着手へ" [JR East to start construction of Haneda Airport Access Line]. Japan Railfan Magazine Online (in Japanese). 5 April 2023. Archived from the original on 5 April 2023. Retrieved 5 April 2023.
- ^ a b "JR East pushes back planned opening of new Haneda Airport line by two years". The Japan Times. 5 April 2023. Archived from the original on 5 April 2023. Retrieved 5 April 2023.
- ^ a b c "JR East Group Management Vision "Move Up" 2027" (PDF). Retrieved 2019-05-17.