Interstate 264 (Kentucky)

(Redirected from Interstate 264 in Kentucky)

Interstate 264 (I-264) is a partial loop around the city of Louisville, Kentucky, south of the Ohio River. An auxiliary route of I-64, it is signed as the Shawnee Expressway for its first eight miles (13 km) from its western terminus at I-64/U.S. Route 150 (US 150) to US 31W/US 60 and as the Watterson Expressway for the remainder of its length from US 31W/US 60 to its northeastern terminus at I-71. It is 22.93 miles (36.90 km) in length and runs an open circle around central Louisville.[1] It is the only auxiliary route of I-64 outside of Virginia.

Interstate 264 marker
Interstate 264
Watterson/Shawnee Expressway
Map
I-264 highlighted in red
Route information
Auxiliary route of I-64
Maintained by KYTC
Length22.93 mi[1] (36.90 km)
Existed1948–present
HistoryExpanded into a partial loop from 1958 to 1974
NHSEntire route
Major junctions
West end I-64 / US 150 in Shawnee
Major intersections
East end I-71 in Glenview Manor
Location
CountryUnited States
StateKentucky
CountiesJefferson
Highway system
  • Kentucky State Highway System
KY 263 I-265

I-264 is Louisville's inner beltway (in conjunction with I-64 and I-71), and the later constructed I-265, the Gene Snyder Freeway, is Louisville's outer beltway. I-264 is currently used as the primary detour route when I-64 is closed through Downtown Louisville. However, in late 2016 with the completion of the Lewis and Clark Bridge, the formerly separate segments of I-265 in Kentucky and Indiana have been connected to provide another detour route.

In discussions about the city, I-264 is often used as a rough line dividing the older areas of Louisville from its suburbs.

Route description

edit

I-264 begins four miles (6.4 km) west of Downtown Louisville at I-64 just east of the Sherman Minton Bridge, which links Southern Indiana with Kentucky as it crosses the Ohio River. The Interstate ends approximately six miles (9.7 km) northeast of Downtown Louisville, where it connects to I-71.

History

edit

1920s–1958: pre I-264 designation

edit
 
Eastbound I-264 on the approach to I-64 and Shelbyville Road exits

As early as the mid-1920s, there were proposals made for a road with a similar goal.[2]

In 1941, a planning document described the need for a bypass around the southern end of Louisville. A funding shortage caused by world War II delayed the opening. In 1948 the expressway opened from the Dixie Highway to the Shelbyville Road on the southeast side of the city. The road was a two-lane expressway built to carry traffic between Shelbyville Road and US 31W (Dixie Highway) in Louisville as a relocation of US 60.

In 1952, the road was named the "Watterson Expressway" after local journalist and editor Henry Watterson.[3]

By 1954, the entire roadway was either built or under construction. It was also determined that the road would be extended from Shelbyville road to Brownsboro Road.[4]

1958–present: since designation

edit

Interstate 264 was one of two routes approved by the American Association of State Highway Officials (AASHO) for the Kentucky statewide urban Interstate numerology on November 10, 1958.[3] It was to be a partial beltway loop. Taking advantage of the Watterson Expressway already existing, plans were made to widen the 1948 segment to four lanes and expand the expressway itself from Shelbyville road to Brownsboro Road, as had already been planned. Work on the massive project was complete by 1965.

On July 11, 1968, the 1/2 mile Waterson Expressway extension eastwards to I-71 was completed. The other segments of the expressway were also resurfaced in a $1 million safety project, previously rain caused severe accidents.[5]

In 1970, the first part of a western extension was opened at the Dixie Highway intersection. For the next four years, this expansion would be opened in segments. Work was completed in 1974 when the segment with I-64 northwest of Downtown Louisville was opened. At this point, both the Shawnee and Watterson Expressways were signed as I-264. The original section from Dixie Highway to I-71 still retained the "Watterson Expressway" moniker though this was still cosigned, along with the original US 60 designation, as I-264, while the western segment was originally named the "Shawnee Expressway", even though signage referred to it simply as "I-264", with no mention of the "Shawnee Expressway" name. The original Dixie Highway to I-71 segment signage reads as "I-264 Watterson Expressway", while the western segment signage still only reads as "I-264".

The US 60 concurrency was dropped in 1984 when the original surface roads through Louisville were returned to their original designations.

 
Junction of US 31E and I-264

As early as the 1960s, there were suggestions to rebuild the Watterson Expressway, as its exits were to close together and the more minor ones were extremely congested.[6] The Watterson Expressway underwent a major reconstruction effort that began in 1985. The freeway had outlived its useful purpose and had numerous characteristics that defined it as a blight on Louisville: deteriorating overpasses, buckling pavement, deficient and too closely spaced interchanges, and rampant congestion. Dozens of bridges were reconstructed and widened, and the majority of the interchanges were redesigned and rebuilt from the ground up from US 31W east to Shelbyville Road. Exit 13 exit was also eliminated, the Westbound side closing in 1986, and the eastbound side closed in 1987.[7] The entire highway reconstruction project was completed in 1995. A typical deficient interchange along I-264 was the I-65, Kentucky Exposition Center, and Louisville International Airport exit. Before the reconstruction, two cloverleafs with no collector–distributor lanes existed and posed serious weaving issues. The interchange today has been rebuilt and features numerous flyovers and collector–distributor lanes, making it safer though not necessarily easier to navigate.

The Shawnee Expressway, from its opening in 1970, had received no more than emergency or spot patching and was in need of a rebuild. After several years of planning, in early 2003, the Kentucky Transportation Cabinet (KYTC) began a reconstruction project on this segment of Interstate Highway stretching from the US 31W interchange northwest to just east of Bank Street. A concrete surface several inches thick was constructed on mainline roadway and access ramps, a new median barrier was formed, new lighting fixtures were installed, 37 bridges were rehabilitated, 380 new roadway signs were posted, and all guardrails were replaced as part of the 7.6-mile (12.2 km) project. In addition, the segment from River Park Drive to I-64, which was only two lanes, was widened to three lanes. No major ramp or interchange modifications were needed. The highway reconstruction project costed approximately $66 million (equivalent to $92.8 million in 2023[8]) and required 18 months of labor. About 70,000 vehicles a day use the portion of I-264 near US 31W and about 40,000 daily use the segment near its western terminus with I-64.

On April 1, 2010, the Kentucky General Assembly designated the western portion to be renamed as the Georgia Davis Powers Expressway.[9] At this point, small signs at both the western I-64 terminus and the Dixie interchange were installed.

Although the Kentucky General Assembly considered plans for an interchange with Kentucky Route 1447 (KY 1447, Westport Road) as early as 1992, work did not begin until October 2008 and was completed in May 2010.[10][11][12] Additionally, the overpass carrying traffic over the roadway was replaced with a wider three-lane one that also had shoulders; the roadway nearby was also reconstructed.

In 2011, plans were made to improve the US 42 interchange. In its previous configuration, the exit was a congested boatneck that frequently saw accidents.[13] The project was completed in 2014.[14]

Future

edit

There are currently plans to rebuild the I-65 interchange.[15]

Exit list

edit

The entire route is in Louisville, Jefferson County.

mikmExitDestinationsNotes
0.00.00A-B   I-64 / US 150 – Louisville, Lexington, New Albany, St. LouisWestern terminus; Westbound exit/eastbound entrance & signed as exit 0A (east) & left 0B (west); I-64 exit 1; tri-stack interchange.
0.20.321Bank Street / Northwestern ParkwayEastbound exit and westbound entrance
1.01.62Muhammad Ali Boulevard / River Park Drive
2.33.73Virginia Avenue / Dumesnil Street
3.55.64   KY 2054 (Algonquin Parkway) / KY 2056 (Bells Lane)Eastbound exit not signed for KY 2054/Algonquin Parkway
4.7–
4.9
7.6–
7.9
5  KY 1934 (Cane Run Road) / Ralph AvenueEastbound exit signed as exits 5A (Ralph Avenue, Cane Run Road north) and 5B (Cane Run Road south) eastbound
6.911.18   US 31W / US 60 (Dixie Highway) – Fort Knox, ShivelySigned as exits 8A (south/west) and 8B (north/east)
West of this exit, I-264 is the Georgia Davis Powers Expressway; east of this exit it is the Watterson Expressway.
8.613.89  KY 1865 (Taylor Boulevard)
9.615.410  KY 1020 (Southern Parkway) / 3rd Street
10.516.911Crittenden Drive – Kentucky Exposition Center
10.817.411Louisville International Airport
10.817.412Kentucky Exposition Center (Freedom Way)Westbound exit is part of exit 11
10.917.512   I-65 / KY 61 – Nashville, IndianapolisI-65 exit 131A northbound, 131A-B southbound; former northern terminus of the Kentucky Turnpike, I-65 continued north
12.920.814  KY 864 (Poplar Level Road)
14.122.715  KY 1703 (Newburg Road)Signed as exits 15A (north) and 15B (south) westbound
15.124.316   US 31E / US 150 (Bardstown Road)
16.426.417  KY 155 (Taylorsville Road)Signed as exits 17A (south) and 17B (north)
17.227.718  KY 1932 (Breckenridge Lane)Signed as exits 18A (south) and 18B (north)
18.429.619  I-64 – Lexington, LouisvilleI-64 exit 12 westbound, 12A-B eastbound; signed as exits 19A (east) and 19B (west).
18.830.320  US 60 (Shelbyville Road) – Middletown, St. MatthewsSigned as exits 20A (east) and 20B (west)
20.432.821  KY 1447 (Westport Road)
21.634.822   US 42 / KY 22 (Brownsboro Road)
22.436.023  I-71 – Cincinnati, LouisvilleEastern terminus; Eastbound exit and westbound entrance; signed as left exit 23B (south) & 23A (north); I-71 exit 5; tri-stack interchange
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

edit

References

edit
  1. ^ a b "Table 2 – Auxiliary Routes – FHWA Route Log and Finder List – Interstate Highway System – National Highway System – Planning". Federal Highway Administration (FHWA). Federal Highway Administration. December 31, 2021. Archived from the original on February 13, 2023. Retrieved March 18, 2022.
  2. ^ "Aug 24, 1952, page 39 - The Courier-Journal at Newspapers.com". Newspapers.com. Archived from the original on May 16, 2024. Retrieved May 16, 2024.
  3. ^ a b Kleber, John E., ed. (2001). "Watterson Expressway". The Encyclopedia of Louisville. Lexington, Kentucky: University Press of Kentucky. p. 926. ISBN 0-8131-2100-0. OCLC 247857447.
  4. ^ "1954-05-06 – Accord reached on highway work Pg. 1". The Courier-Journal. May 6, 1954. p. 1. Archived from the original on May 16, 2024. Retrieved May 16, 2024 – via newspapers.com.
  5. ^ "Jul 12, 1968, page 17 - The Courier-Journal at Newspapers.com". Newspapers.com. Archived from the original on May 17, 2024. Retrieved May 16, 2024.
  6. ^ "Jul 20, 1969, page 80 - The Courier-Journal at Newspapers.com". Newspapers.com. Archived from the original on May 17, 2024. Retrieved May 17, 2024.
  7. ^ Shapero, Ken (October 18, 1987). "Ramps at Watterson and I-65 are a-mazing for motorists". www.newspapers.com. The Courier Journal. pp. B1. Archived from the original on October 26, 2018. Retrieved October 25, 2018.
  8. ^ Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  9. ^ "House Joint Resolution 67" (PDF). Archived from the original (PDF) on November 10, 2010. Retrieved February 1, 2011.
  10. ^ Alcock, Andy (April 29, 2010). "New I-264 Interchange Opens At Westport Road – Louisville News Story – WLKY Louisville". wlky.com. Archived from the original on September 28, 2011. Retrieved February 1, 2011.
  11. ^ "KY 1447". KentuckyRoads.com. March 31, 2010. Archived from the original on November 24, 2010. Retrieved February 1, 2011.
  12. ^ "State to spend $47 million on I-264 at Westport Road interchange | Business First". Bizjournals.com. September 22, 2008. Archived from the original on October 26, 2012. Retrieved February 1, 2011.
  13. ^ "I-264/US 42 Interchange Scoping Study Item No. 5-390.00 Jefferson County, Kentucky" (PDF). Archived (PDF) from the original on May 17, 2024. Retrieved May 16, 2024.
  14. ^ "Press Release Page | KYTC". transportation.ky.gov. Archived from the original on May 16, 2024. Retrieved May 16, 2024.
  15. ^ "I-65/I-264 Interchange Planning Study | KYTC". transportation.ky.gov. Archived from the original on May 11, 2024. Retrieved May 16, 2024.
edit
KML is from Wikidata