KRI Lukas Rumkorem (392) is the second ship of Raja Haji Fisabilillah-class offshore patrol vessel to be operated by the Indonesian Navy.

KRI Lukas Rumkorem during its launching ceremony
History
Indonesia
NameKRI Lukas Rumkorem
NamesakeLukas Rumkorem [id]
BuilderNoahtu Shipyard, Bandar Lampung
CostRp 1.085 trillion
Yard number411[1]
Laid down16 November 2022
Launched20 September 2024
IdentificationPennant number: 392
StatusFitting out
General characteristics
TypeRaja Haji Fisabilillah-class offshore patrol vessel
Displacement
  • 1,800 t (1,800 long tons) (standard)
  • 2,100 t (2,100 long tons) (full)
Length98 m (321 ft 6 in)
Beam13.5 m (44 ft) (breadth)
Height6.5 m (21 ft)
Draft4 m (13 ft)
Propulsion4 × MAN 16V28/33STC diesel engines, 7,280 kW (9,760 shp)
Speed28 knots (52 km/h)
Boats & landing
craft carried
2 × RHIBs
Complement70 (+24 extra personnel)
Sensors and
processing systems
Havelsan Advent CMS
Electronic warfare
& decoys
Armament
Aircraft carried1 × helicopter
Aviation facilitiesFlight deck and hangar

Design

edit

Unlike the class leader, Lukas Rumkorem initially was designed with a length of 60 m (200 ft), however during the construction it was redesigned to a length of 98 m (322 ft), the same as the class leader Raja Haji Fisabilillah.[2]

Service history

edit

The ship's contract was awarded on 30 April 2020, with the contract worth Rp 1,085,090,000,000.[3] Its construction was began with first steel cutting on 26 August 2021 at the then PT Daya Radar Utama (later renamed to PT Noahtu Shipyard) shipyard in Bandar Lampung, Lampung.[4][5]

The ship's keel was laid on 16 November 2022.[6] The ship experienced delays during its construction, which drew some criticism. Although the ship was planned to be handed over in 2023, the construction progress was only at 35% by March 2023.[3][7]

The patrol vessel was launched and officially given the name of Lukas Rumkorem on 20 September 2024.[8]

References

edit
  1. ^ "Brigif 4 Marinir/BS Menghadiri Acara Keel Laying Kapal Offshore Patrol Vessel (OPV)". marinir.tnial.mil.id (in Indonesian). 16 November 2022. Retrieved 26 August 2024.
  2. ^ Ardiansyah, Yulian (18 November 2022). "PT DRU Letakkan Lunas Untuk Dua OPV Baru TNI AL". globalbusinesspress.net (in Indonesian). Retrieved 26 August 2024.
  3. ^ a b "Kinerja Kemenhan Jadi Sorotan, KPK Diminta Awasi Proyek Kapal OPV, Nilai Proyek 2 Triliun". merdekanews.co (in Indonesian). 11 April 2023. Retrieved 26 August 2024.
  4. ^ Manaranche, Martin (27 August 2021). "Indonesian Shipyard Cuts Steel on New OPVs for TNI AL". navalnews.com. Retrieved 26 August 2024.
  5. ^ "Kemhan Pesan Kapal OPV dan OPV 90 Meter Buatan Dalam Negeri". kemhan.go.id (in Indonesian). 26 August 2021. Retrieved 26 August 2024.
  6. ^ "Brigif 4 Marinir/BS Menghadiri Acara Keel Laying Kapal Offshore Patrol Vessel (OPV)". mediafaktanews.com (in Indonesian). 17 November 2022. Retrieved 26 August 2024.
  7. ^ Rusdiyono (13 April 2023). "Dua Petinggi Perusahaan Pembuatan Kapal OPV Masih Bungkam Soal Progres Proyek Milik Kementerian Pertahanan". infoindonesia.id (in Indonesian). Retrieved 18 September 2024.
  8. ^ Susanti, Anita (20 September 2024). "TNI AL KEMBALI DIPERKUAT DUA KAPAL OPV 90M & OPV BUATAN INDUSTRI DALAM NEGERI". pesonalampungnews.com (in Indonesian). Retrieved 20 September 2024.