Kaleum district

(Redirected from Kaleum District)

Kaleum is a district (muang) of Sekong province in southeastern Laos.[1] In 2013, more than 100 families who inhabited the district were displaced by the construction of the Sekong 4 Dam.[2]

Kaleum district
ເມືອງກະລຶມ
Map
CountryLaos
ProvinceSekong
Time zoneUTC+7 (ICT)

Economy

edit

In February 2021, the Lao government announced that two lignite-fired power plants will constructed in Sekong province, one of them in Kaleum District. Work is to begin in 2021 and be completed by 2025. The electricity generated will be sold to Cambodia for 7.2 US cents per kWh. The Kaleum plant will be built by Phonesack Group. It will have an installed capacity of 1,800 MW. The company will invest between US$3–4 billion, including the construction of transmission lines to export electricity to Cambodia. The government claims that coal reserves adjacent to the plant are sufficient to power it for the entire 25-year concession period.[3]

Settlements

edit

References

edit
  1. ^ "Maplandia world gazetteer". Maplandia.
  2. ^ Luangkhot, Viengsay; Lipes, Joshua (11 September 2013). "Lao villagers displaced by dam await farmland six months after relocation". Refworld (UNHCR). Radio Free Asia. Retrieved 6 June 2020.
  3. ^ Phonevilay, Latsamy (5 February 2021). "Laos to Build Two Coal-Fired Plants in Xekong Province". The Laotian Times. Retrieved 5 February 2021.