Narlıdere Kaymakamlık is the western terminus of the İzmir Metro's only operating line, the M1. Located near the Narlıdere District Governorship Building, the station has one island platform servicing two tracks. The station was opened on 4 March 2024, after almost 6 years of construction.
Narlıdere Kaymakamlık | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
İzmir Metro rapid transit station | |||||||||||
General information | |||||||||||
Other names | Kaymakamlık | ||||||||||
Location | Huzur Mah., 35320 Narlıdere | ||||||||||
Coordinates | 38°23′42″N 26°59′29″E / 38.394996°N 26.991392°E | ||||||||||
Owned by | İzmir Metropolitan Municipality | ||||||||||
Operated by | İzmir Metro A.Ş. | ||||||||||
Line(s) | |||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | ESHOT Bus: 5, 8, 82, 321, 551, 909, 975, 981, 982, 983, 984, 985, 987 | ||||||||||
Construction | |||||||||||
Parking | Yes | ||||||||||
Bicycle facilities | No | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 4 March 2024 | ||||||||||
Electrified | 750V DC Third rail | ||||||||||
Services | |||||||||||
|
History
editConstruction of the seven station expansion of the subway line, west from Fahrettin Altay, began on 9 June 2018 with completion expected by December 2021.[1] The first six stations on the extension were completed on 24 February 2024, with the last station, Narlıdere Kaymakamlık, opening its doors on 4 March 2024.[2][3]
A parking lot with a capacity of 33 vehicles will be built near the station.[4]
Connections
editESHOT operates city bus services on Mithatpaşa Avenue and Açelya Street.
Route Number | Stop | Route | Location |
---|---|---|---|
5 | Narlıdere Huzur | Narlıdere — Üçkuyular İskele | Açelya Street |
8 | Narlıdere Kaymakamlık | Güzelbahçe — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
82 | Narlıdere Kaymakamlık | Siteler — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
321 | Narlıdere Kaymakamlık | Çamlı Mahallesi — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
551 | Narlıdere Kaymakamlık | Narlıdere — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
909 | Narlıdere Kaymakamlık | Zeytinalanı — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
975 | Narlıdere Kaymakamlık | Seferihisar — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
981 | Narlıdere Kaymakamlık | Balıklıova — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
982 | Narlıdere Kaymakamlık | İYTE — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
983 | Narlıdere Kaymakamlık | Bademler — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
984 | Narlıdere Kaymakamlık | Urla — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
985 | Narlıdere Kaymakamlık | Seferihisar — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
987 | Narlıdere Kaymakamlık | Ürkmez — Fahrettin Altay Aktarma | Mithatpaşa Avenue |
Station layout
editS | Street level | Exit/entrance, buses |
M | Mezzanine level | Ticket machines, turnstiles |
P Platform level |
Westbound | Terminus, passenger drop-off only |
Island platform, doors will open on the left | ||
Eastbound | toward Evka 3 (100. Yıl Cumhuriyet Şehitlik) → |
References
edit- ^ "Büyükşehir'den 'milyarlık' yatırım" ['Billion' investment from the Metropolitan] (in Turkish). İzmir Büyükşehir Belediyesi. 10 June 2018. Archived from the original on 14 June 2018. Retrieved 10 June 2018.
- ^ "Soyer: 'Bundan sonra sathımız, tüm vatandır'". İzmir Metropolitan Municipality. 24 February 2024. Retrieved 24 February 2024.
- ^ "Narlıdere Metrosu'nda beklenen istasyon hizmete girdi". İz Gazete. 4 March 2024. Retrieved 4 March 2024.
- ^ "Narlıdere Metrosu'nda sona doğru". İzmir Büyükşehir Belediyesi. 30 June 2023. Retrieved 17 March 2024.
- ^ "Duraktan Geçen Hatlar". eshot.gov.tr (in Turkish). Retrieved 17 March 2024.
External links
edit- Media related to Narlıdere Kaymakamlık metro station at Wikimedia Commons