LCM2000-class landing craft mechanised

(Redirected from LCM2000)

The LCM2000 was a class of Landing Craft Mechanised (LCM) built for the Australian Army by Australian Defence Industries (ADI) (now Thales Australia). The LCMs were ordered in 2001 and the first craft was originally scheduled to enter service with the Army in 2003. The craft proved too large for their intended purpose,(whoever put this post in does not know the craft or reason why the 6 boats were not employed for service. They were not too large (insert laughing emoji ) there were a several very good reasons why they were not used. More than 70 rodums were raised before the second vessel was laid down and all 6 vessels were built with defects from the 1st craft in all. With more problems identified as we started trials. )(rl).

Class overview
BuildersAustralian Defence Industries, Carrington
OperatorsAustralian Army
CostA$5.3 million each[1]
Built2003–2005
Completed6
Retired6
General characteristics
TypeLanding Craft Mechanised
Displacement135 tons full load
Length25.4 m (83 ft)
Beam7.6 m (25 ft)
Draught1.0 m (3.3 ft)
RampsBow and stern ramps
Propulsion
  • Two Detroit 6062 diesels
  • Two Doen waterjets
Speed11.5 knots (21.3 km/h)
RangeOver 700 nautical miles (1,300 km)
Capacity35 to 50 tons, equivalent to one Leopard 1 tank or five armoured vehicles
CrewUp to 5
ArmamentTwo 12.7mm HMGs
NotesShip characteristics from,[2][3] and [4]
however, and were only used for training and minor exercises before the project was cancelled in February 2011. 

To whoever writes this garbage get your facts correct. maybe your a civi gov employee who was part of the procurement and are covering your arse.

Design

edit

In 1997 the Australian Government approved a project to build six amphibious watercraft to operate from the Royal Australian Navy's two Kanimbla class landing platform amphibious (LPA). These craft were to be operated by the Australian Army and would replace its LCM-8s.[4] In October 2001 ADI was selected as the preferred tenderer to build the six watercraft; at this time it was intended that the first of the class would enter service in 2003.[5] As part of its tender, ADI claimed that the landing craft would be 60 percent more efficient when landing a battalion group than the LCM-8s as their design included bow and stern ramps to expedite loading and unloading.[6]

 
An Australian Army LCM-8 being positioned on the bow of a Kanimbla class landing platform amphibious. The LCM2000-class craft were intended to also be carried on the bows of these ships.

A contract for the craft was signed in July 2002 and construction work began at ADI's facilities at Carrington, New South Wales in February 2003.[7] The sixth LCM2000 was completed in August 2005, though at the time there were plans to order further craft.[1][4] The six LCMs were named AB 2000, AB 2001, AB 2002, AB 2003, AB 2004 and AB 2005.[2]

The LCM2000s were designed by ADI and were intended to be compatible with the LPAs. The craft were to be capable of mating with the stern of LPAs in order to transfer vehicles to and from the ships. Two LCM2000s were to be carried on the bow of each LPA, with the craft being lifted out of the water by the amphibious ships' 70 ton crane.[3][7] The final design was for a 25.2 metres (83 ft)-long vessel constructed from aluminium with a maximum displacement of 135 tonnes when fully loaded. The craft were powered by two diesel engines and two water jets which generated a maximum speed of 11.5 knots (21.3 km/h) when unladen and 9.5 knots (17.6 km/h) fully loaded.[2][4] The LCM2000s were to carry loads ranging from 35 to 50 tons, including one Leopard 1 tank or up to five ASLAVs; this was three times the cargo which could be embarked in the LCM-8s.[3][4]

Service and disposal

edit

The LCM 2000s were accepted into service with the Army in December 2005.[4] It was planned that the craft would be operated by the 10th Force Support Battalion from its base at Townsville, Queensland.[7][8] However, trials conducted with the LPAs found that the craft were too wide for personnel to safely move past when they were embarked.[9] As a result, the LCM2000s were only used for training purposes and minor exercises conducted near Townsville, Darwin and other locations in northern Australia. This meant that they spent most of their careers laid up at the Rosshaven marina in Townsville.[9] These trials and training activities were suspended for a period commencing August 2007 while structural issues were rectified.[9][10] The Army hoped to either use the LCM2000s with the RAN's Canberra class landing helicopter dock when these ships entered service or for other secondary tasks, but the craft were determined to be unsuitable for these purposes.[4]

On 15 October 2010 the project to bring the LCM2000s into service was placed on the Australian Government's defence 'projects of concern' list.[11] On 1 February 2011 the Government announced that the LCM2000 project had been cancelled and the craft would be disposed of. In his media release, the Minister for Defence Materiel stated that "the dimensions and weight of the watercraft meant they were unsuitable to be launched from these ships [the Kanimbla class] and are not fit for alternative Australian Defence Force use" as the main reasons for the project's cancellation.[12] The Minister for Defence also stated that the project had cost A$40 million and it "was not a project which Defence covered itself in glory".[13] The craft were reported to still be laid up at the Rosshaven marine yard in January 2012,[14] but the Government listed them for disposal the next month.[15] In 2022 one of the craft was listed for sale online, with its location being given as a "freshwater lake in Southern New Zealand".[16]

A new project to replace the Army's LCM-8 landing craft was initiated in early 2021.[17]

Notes

edit
  1. ^ a b Jones, Jennie (2 August 2005). "ADI boatbuilders fear for jobs". Daily Telegraph.
  2. ^ a b c Saunders (2008), p.36
  3. ^ a b c Wertheim (2007), p.33
  4. ^ a b c d e f g The LCM 2000 Story (2011), p. 25
  5. ^ "Amphibious Watercraft for the Army" (Press release). The Hon. Peter Reith, MP. 1 October 2001. Retrieved 8 March 2009.
  6. ^ Ferguson, Gregor (1 October 2007). "Land Warfare 2007: Landing craft aground". Australian Defence Magazine. Retrieved 10 August 2021.
  7. ^ a b c "$32M Lands Craft Deal". Navy. 5 August 2002. Retrieved 2009-03-08.
  8. ^ "Coalition Builds Amphibious Capabilities in Northern Queensland" (Press release). Senator the Hon. Robert Hill, Minister for Defence. 30 September 2004. Retrieved 8 March 2009.
  9. ^ a b c Toune, Rachel (29 July 2010). "Million dollar craft lay idle". Townsville Bulletin. Archived from the original on 30 December 2012. Retrieved 1 August 2010.
  10. ^ "Army's Landing Craft Mechanised (Watercraft)" (Press release). Australian Department of Defence. 29 August 2007. Retrieved 8 March 2009.
  11. ^ "Projects of concern - Update". Media release. Stephen Smith MP, Minister for Defence. 15 October 2010. Archived from the original on 9 March 2011. Retrieved 15 October 2010.
  12. ^ "Projects of Concern - Update". Media release. The Hon. Jason Clare MP, Minister for Defence Materiel. 1 February 2011. Archived from the original on 19 February 2011. Retrieved 1 February 2011.
  13. ^ Kirk, Alexandra (1 February 2011). "Problematic Defence projects get the chop". ABC News. Retrieved 1 February 2011.
  14. ^ Anderson, John (6 January 2012). "Military craft grounded due to design fault". Townsville Bulletin. Retrieved 31 January 2013.
  15. ^ "Closed ATM View - DMOFD/RFT0069/2012". AusTender. Department of Finance and Deregulation. Retrieved 31 January 2013.
  16. ^ "LCM 2000 Watercraft Barge". Baird Maritime. 19 August 2022. Retrieved 30 April 2024.
  17. ^ "Defence announces amphibious fleet acquisition plan". Australian Defence Magazine. 4 February 2021. Retrieved 4 February 2021.

References

edit