GER Class C72

(Redirected from LNER Class J68)

The GER Class C72 was a class of thirty 0-6-0T steam locomotives designed by A. J. Hill for the Great Eastern Railway. They passed to the London and North Eastern Railway (LNER) at the 1923 grouping and received the LNER classification J68.

GER Class C72
LNER Class J68
J68 0-6-0T No. 68642 at Stratford Locomotive Depot February 1961
Type and origin
Power typeSteam
DesignerA. J. Hill
BuilderStratford Works
Build date1912–1923
Total produced30
Specifications
Configuration:
 • Whyte0-6-0T
 • UICC n2t
Gauge4 ft 8+12 in (1,435 mm)
Driver dia.4 ft 0 in (1.219 m)
Wheelbase13 ft 10 in (4.22 m)
Length27 ft 8 in (8.43 m) over buffers
Loco weight42 long tons 9 cwt (95,100 lb or 43.1 t)
Fuel typeCoal
Fuel capacity2 long tons 10 cwt (5,600 lb or 2.5 t)
Water cap.1,200 imp gal (5,460 L; 1,440 US gal)
Firebox:
 • Grate area14.5 sq ft (1.35 m2)
Boiler pressure180 lbf/in2 (1.24 MPa)
Heating surface996.17 sq ft (92.547 m2)
CylindersTwo, inside
Cylinder size16.5 in × 22 in (419 mm × 559 mm)
Performance figures
Tractive effort19,091 lbf (84.92 kN)
Career
Operators
Class
  • GER: C72
  • LNER: J68
Power classBR: 2F
Axle load classLNER/BR: RA 3
Withdrawn1940, 1958–1961
DispositionAll scrapped

History

edit

These locomotives were an improved version of the Class S56 tanks, and the final development of James Holden's Class T18 tank locomotives, sharing the same 16.5-by-22-inch (419 mm × 559 mm) cylinders, 4-foot-0-inch (1.219 m) driving wheels, and 13-foot-10-inch (4.22 m) wheelbase. There were three orders, each of ten locomotives, all built at Stratford Works between 1912 and 1923. The first batch were built as suburban passenger tanks and were fitted with Westinghouse air brakes. The second and third batches were built as shunting tanks and were fitted with steam locomotive brakes and vacuum train brakes.

Table of orders and numbers[1]
Year Order Quantity GER Nos. LNER Nos. 1946 Nos. Notes
1912 C72 10 41–50 7041–7050 —, 8638–8646 Passenger service
1913–14 G75 10 21–30 7021–7030 8647–8656 Shunting service
1923 L89 10 31–40 7031–7040 8657–8666 Shunting service

The last batch did not emerge from Stratford until after the grouping.

One locomotive was lent to the War Department in October 1939,[2] and sold 12 months later,[3] It was used on the Longmoor Military Railway before being moved to the Bicester Central Ordnance Depot,[2] and then the Military Port No. 1, Faslane.[4] The remaining locomotives were renumbered 8638–8666 in order of construction. At nationalisation in 1948 they passed to British Railways, who added 60000 to their numbers. Post war withdrawals started in 1958, and all were gone by 1961.

Table of withdrawals[3]
Year Quantity in
service at
start of year
Quantity
withdrawn
Locomotive numbers Notes
1940 30 1 7041 to WD 85
1958 29 6 68651/53/59/62/64/66
1959 23 5 68638–40/48/58
1960 18 10 68641/43/45/52/54–57/61/65
1961 8 8 68642/44/46–47/49–50/60/63

References

edit
  1. ^ Aldrich 1969, p. 104
  2. ^ a b Tourret 1995, p. 47
  3. ^ a b Aldrich 1969, p. 105.
  4. ^ Tourret 1995, p. 48
  • Aldrich, C. Langley (1969). The Locomotives of the Great Eastern Railway 1862–1962 (7th ed.). Wickford, Essex: C. Langley Aldrich. OCLC 30278831.
  • Baxter, Bertram (2012). Baxter, David; Mitchell, Peter (eds.). British Locomotive Catalogue 1825–1923, Volume 6: Great Eastern Railway, North British Railway, Great North of Scotland Railway, Midland & Great Northern Joint Railway, remaining companies in the LNER group. Southampton: Kestrel Railway Books. pp. 103–104. ISBN 978-1-905505-26-5.
  • Tourret, R. (1995). Allied Military Locomotives of the Second World War. Abingdon, Oxon: Tourret Publishing. ISBN 0-905878-06-X.
edit