LRTA 1100 class

(Redirected from LRTA Class 1100)

The LRTA 1100 class is the second-generation class of high-floor light rail vehicles of the LRT Line 1.

LRTA 1100 class
A 1100 class train at Monumento, December 2021
Interior of the train captured in April 2024
Stock typeLight rail vehicle
In service1999–present
ManufacturerHyundai Precision & Industries
Adtranz (later Bombardier Transportation, Alstom)
AssemblyChangwon, South Korea
Constructed1997–1998
Entered service1999; 25 years ago (1999)
Refurbished2019–2020
Number built28 vehicles (7 sets)
Number in service16 vehicles (4 sets)
Formation4 cars per trainset
(Mc–M–M–Mc)
Fleet numbers1101–1128
Capacity1,358 passengers (320 seats)
OperatorsLRTA (1999–2015)
LRMC (2015–present)
DepotsBaclaran
Lines served Line 1
Specifications
Car body constructionStainless steel
Train length105.7 m (346 ft 9+2764 in)
Car length26.35 m (86 ft 5+1332 in) (Mc)
26.5 m (86 ft 11+516 in) (M)
Width2.59 m (8 ft 5+3132 in)
Height3.95 m (12 ft 11+3364 in)
Floor height0.92 m (3 ft 732 in)
Platform height0.69 m (2 ft 3+1164 in)
Doors4 sets of 1.5 m (59 in) double-leaf pocket doors per side
Articulated sections2
Wheel diameter660–600 mm (26–24 in) (new–worn)
Wheelbase2.31 m (7 ft 6+1516 in)
Maximum speed60 km/h (37 mph)
Weight37.4 t (82,000 lb) (Mc)
36.5 t (80,000 lb) (M)
Axle load10.7 t (24,000 lb)
Traction systemAdtranz[a]/Voith[b] IGBTVVVF
Traction motors4 × 3-phase AC induction motor
  • As built: 125 kW (168 hp)
  • Refurbished: 170 kW (230 hp)
Power outputAs built:
  • 500 kW (670 hp) (single LRV)
  • 2 MW (2,700 hp) (4-car train)
Refurbished:
  • 680 kW (910 hp) (single LRV)
  • 2.72 MW (3,650 hp) (4-car train)
Acceleration1.1 m/s2 (3.61 ft/s2)
Deceleration1.3 m/s2 (4.27 ft/s2) (service)
2.08 m/s2 (6.82 ft/s2) (emergency)
Auxiliaries2 × Static inverter
HVACRoof-mounted duct-type air conditioning
Electric system(s)750 V DC overhead catenary
Current collector(s)Single-arm pantograph
UIC classificationBo′+2′+Bo′
BogiesFLEXX Metro 1000[1]
Minimum turning radius25 m (82 ft 0 in)
Braking system(s)Knorr-Bremse regenerative[2] and electro-pneumatic
Safety system(s)ATP
Coupling systemSemi-permanent
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Notes/references
Sourced from [3][4][5][6][7][8][9][10][11][12] unless otherwise noted.

The trains were purchased in 1996 as part of a capacity expansion project funded by official development assistance (ODA) loans from Japan. Entering service in 1999,[6][13] many vehicles were taken out of service due to lack of spare parts. The trains subsequently underwent re-engineering and refurbishment by Voith from 2019 to 2020.

Operational history

edit

Background and purchase

edit

By 1990, the LRT Line 1 in Metro Manila reached its capacity, necessitating the need for capacity expansion. The project, launched in 1994 and undertaken at a cost of ₱4.1 billion,[14] was one of the flagship projects of the administration of President Fidel V. Ramos.[15] Initially, 32 cars with identical specifications to the 1000 class trains were planned to be ordered for the 32 two-car trains operating at the time so that each train would consist of three cars. However, with the increasing transport demand, four-car trains were considered instead.[16]

In February 1996, four bidders were submitted to build the new trainsets. These are a consortium of Marubeni Corporation, Adtranz, and ABB; GEC Alsthom (now Alstom); a consortium of Mitsui and Siemens; and a consortium of Mitsubishi Corporation and Construcciones y Auxiliar de Ferrocarriles.[17] Mitsubishi and CAF would go on to build the fourth-generation train sets as part of the Cavite Extension Project. In August of that year, the Marubeni-Adtranz-ABB consortium was awarded the contract and was signed the following September.[18][19] On October 18, Hyundai Precision signed a contract to produce 28 cars (7 sets) for the LRT Line 1. These cars were produced between 1997 and 1998 as its first manufactured light rail vehicle.[6]

Commissioning and later decline

edit

The handover ceremony and test-run of the 1100 series LRV was done with former President Joseph Estrada and former Vice-President Gloria Macapagal Arroyo in 1999.[citation needed] These trains raised the line's capacity by half[20] from a carrying capacity of 18,000 passengers per hour per direction to 27,000 passengers per hour per direction.[21]

After 2001, many vehicles left the service owing to problems in operations and maintenance.[22] Although spare parts had been substantially given in 2004, 14 cars remained out-of-service due to the lack thereof as of 2013, including two cars involved in a collision.[23][24][25] Most of the spare parts for the trains, including brake parts, were only procurable from Adtranz.[11] There were attempts to procure spare parts, but these attempts failed. This was affected by the acquisition of Adtranz by Bombardier Transportation in 2001 (later acquired by Alstom in 2021). Furthermore, parts in the 1200 class and the 1100 class only share 20% commonality.[26]

In addition, these trainsets were, until 2020, used as "skip trains" or trains meant to target a particular station due to extremely high volume of passengers, especially during rush hours.

A 1100 class trainset was used for the first test run of the LRT Line 1 Cavite Extension Phase 1 on December 19, 2023. According to the Light Rail Manila Corporation (LRMC), the 1100 class is the widest in terms of car body, making it the most strategic option to check for initial compatibility of station platforms, walkways, cableways, and others.[27]

Refurbishment

edit

Refurbishment of the second-generation trains was initiated by LRMC in February 2018, which aimed to restore the inactive fleet into serviceable conditions and increase the capacity of Line 1. LRMC and Voith signed an agreement to refurbish the said fleet which includes the control devices, traction systems, and automatic diagnostic displays of main circuits.[28] The refurbishment was carried out between 2019 and 2020 and six out of seven sets returned to operation with an extended vehicle life.[29] The remaining unrepaired set is in the Santolan Depot of LRT-2, due to the ongoing expansion of the Line 1 depot.

Design

edit

The 1100 class are the first 6-axle (3-bogie) light rail vehicles with two articulated cars in the entire rolling stock of the LRT Line 1, as its predecessor, the 1000 class, was built to the 8-axle (4-bogie) design with three sections.

Car body

edit
The 1100 class trains resemble those of Adana Metro (top) and the LRV34 trains of Istanbul Tram Line T4 (above). Both trains were manufactured by Hyundai Precision's successor, Hyundai Rotem.

The train car body is made of stainless steel, sporting a silver body with yellow and blue cheatlines. Each LRV has four sliding pocket-type doors per side. The 1100 class trains are 90 millimeters (3.5 inches) wider than the 1000 class.[3]

Similar to the 1000 class, the 1100 class have cheatlines of blue and yellow that run through its sides. The trains also served as a prototype for future LRVs made by Hyundai Precision, which bears resemblance to the trains used in the Adana Metro and the Hyundai Rotem LRV34 trains of the Line T4 of the Istanbul Tram.

Each light rail vehicle has two roof-mounted air-conditioning units. In total, there are eight air-conditioning units in a four-car train set.[3]

Interior

edit

The trains have longitudinal seating. A wheelchair provision is present near the articulated portion of the intermediate cars.

Electrical

edit

The 1100 class trains are the first Line 1 trains to have a propulsion system controlled by variable-voltage/variable frequency drive (VVVF) inverters with insulated-gate bipolar transistors (IGBT). The two inverters drive the four 3-phase alternating current, enclosed-type induction motors.[29] Adtranz supplied the original electrical components, while Voith installed the new components. The traction equipment in a refurbished train consists of two Voith EmCon I1000-9AU traction inverters with 350 kilovolt-amperes continuous power in each, two auxiliary static inverters, and a VPort IO control unit.[29]

Prior to refurbishment, the trains produced a distinct high-pitched acceleration sound unique to the Adtranz VVVF controller used, a trait present in the train's derivative models. After refurbishment, the traction acceleration sound is now identical to the one used in the MRTC 3100 class trains, as its traction controller is manufactured by Voith as well.

Mechanical

edit

Each LRV has three outside-frame bogies consisting of two motorized bogies at the ends of the LRV and one trailer bogie under the articulation.[29] Unlike other trains, which have a bogie wheelbase of 1.9 meters (6 ft 3 in), the long, 2.31-meter (7 ft 7 in) wheelbases of the 1100 class trains has caused restricted access to some tracks at the Baclaran Depot.[30] The primary suspension is a chevron rubber spring, while the secondary suspension is an air suspension, similar to the 1200 class.[7] Semi-permanent couplers are present in the ends of each light rail vehicle except the driving cab section of the MC car.

Train formation

edit

The configuration of a four-car trainset is Mc–M–M–Mc. Mc denotes a driving car while M denotes an intermediate car.

Cars of 1100 class
Car type Mc M
A-car B-car A-car B-car
Quantity 2 2
Control cab        
VVVF inverter        
Auxiliary inverter        
Pantograph        
Car length m 26.35 26.5
ft in 86 ft 5+1332 in 86 ft 11+516 in
Capacity[7] Seated 78 82
Standing 252 267
Total 330 349

Incidents

edit
  • Two 1100 class trains, LRVs 1107 and 1120, collided at Baclaran Depot. LRV 1120, however, was subsequently repaired and refurbished in 2019.[4]
  • On November 27, 2017, a 1100 class train door malfunctioned after a passenger forcibly opened it at Vito Cruz station, causing the sensor to malfunction. The train continued its journey with the door left open, and a passenger recorded this incident on camera.[31]
  • On April 19, 2023, a 1100 class train stopped between Roosevelt and Balintawak Station.The 1100 class was coupled to a 1000 class train to be brought back to Baclaran Depot.[citation needed]
  • On August 24, 2023, a 1100 class train derailed near Baclaran Station. Efforts took the entire day to remove the train, necessitating track repairs. As a result, provisional services were implemented between Fernando Poe Jr. and Gil Puyat stations, scheduled for the upcoming weekend until August 27. Fortunately, the repairs were completed ahead of schedule and certified on August 26, enabling the line to resume regular operations.[32]

See also

edit

Notes

edit
  1. ^ As built
  2. ^ Refurbished

References

edit
  1. ^ Bombardier Transportation 2020, p. 3.
  2. ^ "Manila shutoken no kōkyō kōtsū seibi ni kansuru kenshū-yō sofuto seisaku jigyō riyō tebiki-sho" マニラ首都圏の公共交通整備に関する研修用ソフト制作事業 利用手引書 [User guidebook for the production of training software for public transport maintenance in Metro Manila]. Nippon Foundation. 2011. Retrieved May 27, 2020.
  3. ^ a b c DOTC & LRTA 2012, p. 10.
  4. ^ a b JICA 2013a, p. 5-2.
  5. ^ JICA 2013a, p. 5-4.
  6. ^ a b c Roteco 1999, p. 1217.
  7. ^ a b c JICA 2013b, p. A-26.
  8. ^ JICA 2013b, p. B-3.
  9. ^ JICA 2013a, p. 12-87.
  10. ^ JICA 2013a, p. 5-5.
  11. ^ a b LRTA 2006, p. 15-17.
  12. ^ LRTA 2006b, p. 12.
  13. ^ "Managing Safety in LRT-1" (PDF). LRTA. May 27, 2020. Retrieved December 2, 2019.
  14. ^ "LRT to get facelift with new modernization program, says administrator". The Philippine Star. April 9, 2000. Retrieved June 26, 2024.
  15. ^ JICA 2004, p. 2.
  16. ^ JICA 2004, p. 3-4.
  17. ^ "4 foreign firms eye P2.8-B LRT deal". Manila Standard. February 25, 1996. p. 13.
  18. ^ Marcelo, Ellen S. (August 29, 1996). "P2.77-B LRT I contract awarded : Marubeni - ABB group wins". Manila Bulletin.
  19. ^ Villegas, Paul N. (September 24, 1996). "LRTA, Marubeni Corp. sign P1.94-B pact to expand LRT 1". Business World.
  20. ^ DOTC & LRTA 2012, p. 15.
  21. ^ "The Line 1 Capacity Expansion Project (Phase I)". Light Rail Transit Authority. Archived from the original on May 17, 2006. Retrieved January 11, 2022.
  22. ^ DOTC & LRTA 2012, p. 14.
  23. ^ JICA 2013a, p. 3-14.
  24. ^ JICA 2004, p. 9.
  25. ^ JICA 2013a, p. 5-3.
  26. ^ JICA 2010, p. 11.
  27. ^ Sarao, Zacarian (December 20, 2023). "LRT-1 successfully tests Cavite extension phase 1". INQUIRER.net. Retrieved December 31, 2023.
  28. ^ "LRMC, Voith sign agreement for P450M repair of more trains for LRT–1". Light Rail Manila Corporation. February 8, 2018. Retrieved June 20, 2024.
  29. ^ a b c d "Modernization of light rail trains". Voith. Archived from the original on November 3, 2021. Retrieved November 3, 2021.
  30. ^ JICA 2013b, p. A-25.
  31. ^ Bacungan, VJ (November 28, 2017). "WATCH: LRT-1 train runs with open door". CNN Philippines. Archived from the original on October 30, 2021. Retrieved July 11, 2021.
  32. ^ Yu, Lance Spencer (August 24, 2023). "LRT1 rides limited to Gil Puyat-Fernando Poe Jr. route from August 25 to 27". Rappler. Archived from the original on August 26, 2023. Retrieved June 11, 2024.

Sources

edit