LRTA 1200 class

(Redirected from LRTA Class 1200)

The LRTA 1200 class is the third-generation class of high-floor light rail vehicles (LRV) of the LRT Line 1.

LRTA 1200 class
A Kinki Sharyo-built 1200 class train at FPJ station, August 2023
Interior of the train captured in February 2022. This LRV was built by Nippon Sharyo
Stock typeLight rail vehicle
In service2006–present
ManufacturerKinki Sharyo and Nippon Sharyo
AssemblyOsaka (Kinki Sharyo) and Toyokawa, Aichi (Nippon Sharyo), Japan
Constructed2005–2006
Entered serviceDecember 11, 2006; 17 years ago (2006-12-11)
Number built48 vehicles (12 sets)
Number in service44 vehicles (11 sets)
Formation4 cars per trainset
(Mc–M–M–Mc)
Fleet numbers1201–1248
Capacity1,388 passengers (272 seats)
OperatorsLRTA (2007–2015)
LRMC (2015–present)
DepotsBaclaran
Lines served Line 1
Specifications
Car body constructionStainless steel
Train length105.7 m (346 ft 9+2764 in)
Car length
  • 26.35 m (86 ft 5+1332 in) (Mc)
  • 26.5 m (86 ft 11+516 in) (M)
Width2.59 m (8 ft 5+3132 in)
Height3.91 m (12 ft 9+1516 in)
Floor height0.92 m (3 ft 732 in)
Platform height0.69 m (2 ft 3+1164 in)
Doors4 sets of 1.5 m (59 in) double-leaf pocket doors per side
Articulated sections2
Wheel diameter660–600 mm (26–24 in) (new–worn)
Wheelbase1.9 m (74+1316 in)
Maximum speed60 km/h (37 mph)
Weight37.4 t (82,000 lb) (Mc)
36.5 t (80,000 lb) (M)
Axle load10.3 t (23,000 lb)
Steep gradient4%
Traction systemMitsubishi Electric IGBTVVVF
Traction motors4 × 105 kW (141 hp) 3-phase AC induction motor
Power output
  • 420 kW (563 hp) (single LRV)
  • 1.68 MW (2,253 hp) (4-car train)
TransmissionTwo-stage reduction drive
Acceleration1.1 m/s2 (2.46 mph/s)
Deceleration1.3 m/s2 (2.91 mph/s)
Auxiliaries440 V AC IGBT static inverter
110 V DC batteries
HVACRoof-mounted duct-type air conditioning
Electric system(s)750 V DC overhead catenary
Current collector(s)Single-arm pantograph
UIC classificationBo′+2′+Bo′
BogiesInside-frame type
Minimum turning radius25 m (82 ft 0 in)
Braking system(s)Knorr-Bremse[1] regenerative and electro-pneumatic
Safety system(s)Siemens[a]/Alstom Atlas 100[b] ATP
Coupling systemSemi-permanent
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Notes/references
Sourced from [2][3][4][5][6][7][8] unless otherwise noted.

Purchased as part of the second phase of the capacity expansion of the line, the trains entered service in December 2006.[9]

Operational history

edit

Background and purchase

edit

With the completion of the initial capacity expansion of the LRT Line 1, its capacity was raised by half with the introduction of seven four-car trains and the upgrading of the existing two-car trains to three cars in 1999. However, its capacity was expected to become insufficient once the railway network in Metro Manila was completed in 2004 with the full opening of the LRT Line 2.[10]

On April 7, 2000, the Japan Bank for International Cooperation (JBIC) extended a ₱8.893 billion loan to finance the second phase of the capacity expansion project.[11] While existing rolling stock were refurbished, twelve more four-car trains were purchased, in conjunction with other upgrades in signaling, telecommunications, and existing railway tracks as well as upgrades at stations and the depot.[12]

Two firms bidded for the project: Kanematsu and Kawasaki Steel Corporation, and the joint venture of Sumitomo Corporation and Itochu. Marubeni was disqualified from the bidding but questioned the technicalities of the bidding procedure. However, delays were encountered in the bidding process, with senator Francisco Tatad claiming on March 21, 2004, that "unconfirmed reports" reaching him disclosed that groups identifying themselves with the President of the Philippines attempted to extort US$1 million from each bidder supposedly as campaign funds for the May 2004 elections. This, according to Tatad, limited the bidders to the two aforementioned firms. His claims were denied by LRTA administrator Pacifico Fajardo, as well as the Department of Transportation and Communications (DOTC; precursor to the DOTr).[13] Fajardo later claimed that JBIC posed "no objection" to the bidding, and said that it was conducted with transparency.[14]

After a delay of more than three years since 2001, Sumitomo and Itochu won the contract and was given the go-ahead in March 2005.[15] Following this, they signed a construction contract with Kinki Sharyo and Nippon Sharyo to manufacture the light rail vehicles.[5][16]

Production and commissioning

edit

In December 2005, officials from the Light Rail Transit Authority and Manila Tren Consortium—the project consultant of the capacity expansion project, inspected the full-scale mock-up model at Kinki Sharyo's factory in Osaka.[17] It was then displayed at the line's depot in Baclaran in March 2006.[18]

After delivery in the third quarter of 2006, the third-generation trains underwent mainline test runs in the late evening, during non-operating hours. Some scheduled tests in late September 2006 were cancelled due to Typhoon Xangsane.[19]

On December 9, 2006, at a ceremony in Baclaran, Japanese Prime Minister Shinzo Abe and President Gloria Macapagal Arroyo inaugurated the third-generation 1200 class trains. These were then deployed for revenue operations two days later.[20] The trains raised the line's capacity from 27,000 passengers per hour per direction to 40,000 passengers per hour per direction.[18]

Themed trains

edit

On September 6, 2018, a 3G trainset was decorated with a special Gabay Guro decoration to celebrate the National Teachers' Month in the Philippines. The decoration has a library-themed look with images of books. The special themed train was launched on that date and ended a year later.[21]

Design

edit
 
A scale model drawing of the LRTA 1200 class in a 4-car formation

Like the 1100 class, the 1200 class shares the 6-axle rigid body LRV design consisting of two articulated cars.

Car body

edit

The car body has a length of 26 meters (85 feet 4 inches) without couplers, a width of 2.59 meters (8 feet 6 inches), and a height of 3.91 meters (12 feet 10 inches).[22] 1200 class LRVs have 4 electronic sliding doors on both sides.[5] The train car body is made of beadless lightweight stainless steel, with composite materials on the indoor panels and aluminum on the inner bone to reduce weight.[5] 1200 class LRVs have 4 electronic sliding doors on both sides.[5]

Each light rail vehicle has two roof-mounted air-conditioning units that has a cooling capacity of 41,000 kilocalories (170,000 kilojoules). In total, there are eight air-conditioning units in a four-car train set.[22]

Interior

edit

The interior is color-toned based on light and dark two-color green in the seats to complement the landscape of Manila. Seats are made of fiber reinforced plastic and has an aluminum bracket type cantilever longitudinal seat for reducing weight. Seating and grip sticks are designed to have ergonomic dimensions, aside from equipment arrangement inside the cab.[22] A wheelchair-compatible space is provided beside the gangway of the intermediate car, alongside an equipped fire extinguisher.[17]

Electrical

edit

Each LRV consists of four totally enclosed, self-ventilated 3-phase AC induction motors, driven by variable-voltage/variable-frequency drive (VVVF) inverters. Auxiliary power is sourced from 440-volt alternating current static inverters and 110-volt direct current batteries.[23]

Mechanical and braking

edit

Each LRV has three inside-frame bogies, similar to the 1000 class. The bogies consist of two motorized bogies at the ends of the LRV and one shared trailer bogie under the articulation.[5] The primary suspension is a chevron rubber spring, while the secondary suspension is an air suspension, similar to the 1100 class.[24] Semi-permanent couplers are present in the ends of each light rail vehicle except the driving cab section of the MC car.

The 1200 class employs a regenerative and electronically controlled pneumatic braking system manufactured by Knorr-Bremse.[1] The resistors are mounted on the roof for backup regenerative brakes.[5] Each VVVF controller is equipped with an Electronic Command Braking Device (ECBD).[22] Disc brakes are present on the bogies.[23]

Train formation

edit

The configuration of a four-car trainset is Mc–M–M–Mc. Mc denotes a driving car while M denotes an intermediate car.

Cars of 1200 class
Car type Mc M
A-car B-car A-car B-car
Quantity 2 2
Control cab        
VVVF inverter        
Auxiliary inverter        
Pantograph        
Car length m 26.35 26.5
ft in 86 ft 5+1332 in 86 ft 11+516 in
Capacity Seated 66 70
Standing 272 286
Total 338 356

Incidents

edit
  • On June 24, 2010, two trains (1G and 3G) collided at Balintawak station.[25] As a result, LRVs 1248 and 1247 sustained damage. There were plans to restore it,[26] but the involved cars remain idle as of 2022.
  • On February 18, 2011, two trains (1G and 3G) collided near Roosevelt Station in Quezon City at the reversing tracks, around a kilometer away to the east. There were no passengers on board when the incident happened.[27] This caused the Roosevelt and Balintawak stations to remain closed for two months until the stations were reopened on April 11, 2011. An investigation was conducted and was shown that one of the drivers was texting when the incident occurred.[28] This however caused LRV 1236, the 3G unit involved in the incident, to be in idle state and has not yet been restored for service.
  • On May 23, 2015, thousands of passengers were stranded after two trains (1G and 3G) collided near the Monumento station. A train driver was hurt after the impact caused his head to slam into the dashboard of the train.[29] The accident, later revealed to be caused by power fluctuation that affected the signalling system, forced passengers to alight from the station until services was restored around 1 pm at the same day.[30]

Build details (original configurations)

edit

All 1200 class trains were designed and built to agreed specifications with no comparable differences.

Set No. 1 2 3 4 Manufacturer Notes
1 1201 1202 1203 1204 Kinki Sharyo
2 1205 1206 1207 1208
3 1209 1210 1211 1212 Nippon Sharyo
4 1213 1214 1215 1216
5 1217 1218 1219 1220 Kinki Sharyo
6 1221 1222 1223 1224
7 1225 1226 1227 1228 Nippon Sharyo
8 1229 1230 1231 1232
9 1233 1234 1235 1236 Kinki Sharyo 1233–1234 re-configured to 1246–1245
10 1237 1238 1239 1240
11 1241 1242 1243 1244 Nippon Sharyo
12 1245 1246 1247 1248 1246–1245 re-configured to 1233–1234

Notes

edit
  1. ^ As built; used 2007–2022
  2. ^ Used 2022–present

References

edit
  1. ^ a b Knorr-Bremse 2011, p. 11.
  2. ^ Department of Transportation and Communications; Light Rail Transit Authority (June 4, 2012). MANILA LRT1 EXTENSION, OPERATIONS AND MAINTENANCE PROJECT (PDF). Public-Private Partnership Center (Report). Retrieved April 9, 2018.
  3. ^ "LRTA LRV". Kinki Sharyo. Archived from the original on July 17, 2011. Retrieved April 9, 2018.
  4. ^ Kinki Sharyo 2006.
  5. ^ a b c d e f g Nippon Sharyo 2007.
  6. ^ JICA 2013b, p. B-3.
  7. ^ DOTC & LRTA 2012, p. 61.
  8. ^ JICA 2013a, p. 12-87.
  9. ^ "PGMA, Japan PM inaugurate 3G trains" (Press release). Light Rail Transit Authority. December 7, 2006. Archived from the original on July 8, 2008. Retrieved April 21, 2022.
  10. ^ JICA 2012, p. 14.
  11. ^ Araneta, Sandy (April 3, 2005). "RP urged to speed up LRT expansion". The Philippine Star. Retrieved June 26, 2024.
  12. ^ JICA 2012, p. 24.
  13. ^ Ronda, Rainier Allan (March 25, 2004). "LRTA denies anomaly in rail expansion project". The Philippine Star. Retrieved June 26, 2024.
  14. ^ "LRT expansion proj delay a disservice to public — LRTA". The Philippine Star. March 29, 2004. Retrieved June 26, 2024.
  15. ^ Araneta, Sandy (March 20, 2005). "P8.5-billion LRT-1 expansion approved". The Philippine Star. Retrieved June 26, 2024.
  16. ^ "ITOCHU Corporation". Japan Overseas Railway System Association. Archived from the original on August 7, 2020. Retrieved November 27, 2021. In the Philippines, we undertook the Manila LRT Line 1 Capacity Expansion 2 as a JV contractor and we supplied rolling stock and railway systems.
  17. ^ a b "Osaka Inspection Tour" (Press release). Light Rail Transit Authority. December 12, 2005. Archived from the original on December 29, 2005. Retrieved February 17, 2022.
  18. ^ a b "3rd Generation LRV Mock Up on Display" (Press release). Light Rail Transit Authority. March 9, 2006. Archived from the original on April 24, 2006. Retrieved November 27, 2021.
  19. ^ Otsuki 2007, p. 13.
  20. ^ "GMA, Japan PM inaugurate '3-G' trains". The Philippine Star. December 10, 2006. Retrieved June 18, 2024.
  21. ^ "LOOK: 'Gabay Guro' train offers chance to rediscover joys of reading, learning". ABS-CBN News. September 6, 2018. Retrieved September 5, 2021.
  22. ^ a b c d Kinki Sharyo 2006, p. 2.
  23. ^ a b DOTC & LRTA 2012, p. 60.
  24. ^ JICA 2013b, p. A-26.
  25. ^ JICA 2013a, p. 8-8.
  26. ^ Department of Transportation and Communications (September 14, 2012). "Invitation to Bid - Rehabilitation and Restoration of Light Rail Vehicles (LRVs) Project" (PDF). Archived from the original (PDF) on December 27, 2021. Retrieved January 16, 2022.
  27. ^ Castro, Doland (February 18, 2011). "2 LRT trains collide". ABS-CBN News. ABS-CBN News and Current Affairs. Archived from the original on May 26, 2020. Retrieved May 26, 2021.
  28. ^ Tan, Kimberly Jane (April 11, 2011). "LRT Balintawak, Roosevelt stations resume operations". GMA News. GMA News and Public Affairs. Retrieved December 28, 2021.
  29. ^ Gonzales, Yuji Vincent (May 23, 2015). "2 LRT trains collide due to technical glitch; at least 1 hurt". Philippine Daily Inquirer. Archived from the original on February 4, 2016. Retrieved May 26, 2021.
  30. ^ Palma, Paola (May 23, 2015). "Minor collision disrupts LRT operation Saturday". CNN Philippines. Archived from the original on January 1, 2016. Retrieved May 26, 2021.

Sources

edit