Line 4 (Hangzhou Metro)

(Redirected from Line 4, Hangzhou Metro)

Line 4 of the Hangzhou Metro (Chinese: 杭州地铁四号线; pinyin: Hángzhōu Dìtiě Sìhào Xiàn) is a rapid transit line in Hangzhou.

Line 4
 4 
A train of Hangzhou Metro Line 4
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations33 (32 in operation)
Service
TypeRapid transit
SystemHangzhou Metro
Operator(s)Hangzhou Metro Corporation
Depot(s)Qibao Stabling Yard
Gouzhuang Depot
Rolling stockPM082
PM174
Daily ridership422,800 (2019 Peak)
History
Opened2 February 2015; 9 years ago (2015-02-02)
Technical
Line length46.85 km (29.11 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead line, 1500 V DC
Operating speed80 km/h (50 mph)
Route map

1
Puyan
2
Yangjiadun
3
Zhejiang Chinese Medical University
 6 
4
Lianzhuang
5
Shuicheng Bridge
6
Fuxing Road
7
Nanxingqiao
 5 
8
Yongjiang Road
9
Jinjiang
 1 
10
Chengxing Road
11
Citizen Center
 7 
12
Jiangjin Road
Line 2 interconnection
13
Qianjiang Road
 2   9 
14
Jingfang
15
Xintang
16
Xinfeng
17
East Railway Station
 1  China Railway HGH
18
Pengbu
 1 
Line 1, Qibao and Qibao Depot
19
Mingshi Road
20
Liming
21
Jianqiao Old Street
22
South Huazhong Road
23
Xintiandi Street
 3 
24
Gaotingba
25
Taoyuan Street
26
Wujiajiaogang
27
Ducheng Ecopark
28
Ping'an Bridge
29
Chuyun Road
30
Hangxing Road
 10 
31
Haoyun Street
Gouzhuang Depot
Left arrow Liangzhu – Chaoyang Right arrow
32
Jinjiadu
 2 
district
Yuhang
Xihu
33
Chihua Street

Description

edit

Phase 1

edit

Phase 1 of the line started operation since 2015. Running northeast–southwest, the line connects Hangzhou East railway station, Qianjiang New City and Binjiang District. Part of the line (Qianjiang Road to Shuicheng Bridge) runs along the north bank of Qiantang River.

Phase 2

edit

The second phase of Line 4 is 26 km in length.[1] This extension was opened on 21 February 2022.

Opening timeline

edit
Segment Commencement Length Station(s) Name
Pengbu — Jinjiang 2 February 2015 9.6 km (6.0 mi) 9 Phase 1 (initial section)
Xintang 28 June 2015 Infill station 1
Jinjiang — Puyan 9 January 2018 11.2 km (7.0 mi) 7 Phase 1 (final section)
Lianzhuang 6 June 2018 Infill station 1
Pengbu — Chihua Street 21 February 2022 26 km (16 mi)[1] 14 Phase 2 (exclude Ducheng Ecopark Station)

Stations

edit
Legend

  - Operational
  - Under construction

Station name[2] Connections Distance
km
Location
English Chinese
Puyan 浦沿 0.00 0.00 Binjiang
Yangjiadun 杨家墩 0.98 0.98
Zhejiang Chinese Medical University 中医药大学  6  0.93 1.91
Lianzhuang 联庄 1.24 3.15
Shuicheng Bridge 水澄桥 2.23 5.38 Shangcheng
Fuxing Road 复兴路 1.23 6.61
Nanxingqiao 南星桥  5  1.62 8.23
Yongjiang Road 甬江路 1.41 9.64
Jinjiang 近江  1  1.10 10.74
Chengxing Road 城星路 1.30 12.04
Citizen Center 市民中心  7  0.75 12.79
Jiangjin Road 江锦路 0.65 13.44
Qianjiang Road 钱江路  2   9  0.95 14.39
Jingfang 景芳 1.45 15.84
Xintang 新塘 1.15 16.99
Xinfeng 新风 1.25 18.24
East Railway Station 火车东站  1   6 [a] 19 [a]
  HGH
0.60 18.84
Pengbu 彭埠  1  1.10 19.94
Mingshi Road 明石路 4.48 24.42
Liming 黎明 1.33 25.75
Jianqiao Old Street 笕桥老街 1.19 26.94
South Huazhong Road 华中南路 1.71 28.65 Gongshu
Xintiandi Street 新天地街  3  2.16 30.81
Gaotingba 皋亭坝 1.75 32.56
Taoyuan Street 桃源街 1.46 34.02
Wujiajiaogang 吴家角港 1.33 35.35
Ducheng Ecopark 独城生态公园 1.85 37.20
Ping'an Bridge 平安桥 1.39 38.59
Chuyun Road 储运路 1.31 39.90 Yuhang
Hangxing Road 杭行路  10  1.33 41.23
Haoyun Street 好运街 1.58 42.81
Jinjiadu 金家渡  2  2.19 45.00
Chihua Street 池华街 1.75 46.75 Xihu
  1. ^ a b Out-of-station interchange with East Railway Station (East Square)
 
To scale map of Hangzhou Metro Line 4

Rolling stock

edit
Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes
PM082 B 2013-2015 CSR Nanjing Puzhen 174 (29 sets) 04 001 - 04 029 (040011-040296) Tc+Mp+M+M+Mp+Tc Gouzhuang Yard
Qibao Depot
 4 
PM174 2020-2022 CRRC Nanjing Puzhen 192 (32 sets) 04 030 - 04 061 (040301-040616)

See also

edit

References

edit
  1. ^ a b "杭州地铁4号线二期又迎新进展". 2021-04-25.
  2. ^ "杭州市人民政府关于杭州地铁4号线二期工程、8号线一期工程、9号线一期工程车站站名的批复". 2021-03-11.