Line 9 (Changchun Rail Transit)

(Redirected from Line 9 (Changchun Subway))

Line 9 of the Changchun Rail Transit (Chinese: 长春轨道交通九号线; pinyin: Zhǎngchūn guǐdào jiāotōng jiǔ hào xiàn) is a rapid transit line running from Zhaojiagang East to North Zhongchuan Street including a stop called Changchun Longjia Airport Station.[2] It is under construction and planned to open in 2025.[1]

Line 9
100pz
Overview
StatusUnder Construction
OwnerChangchun
LocaleChangchun, Jilin, China
Termini
Stations12
Service
TypeRapid transit
SystemChangchun Rail Transit
Services1
Operator(s)Changchun Rail Transit Corporation
History
Completed2025
Technical
Line length28 km (17.40 mi)[1]
Number of tracks2
Character16km Underground, 12km Elevated
Track gauge1,435 mm (4 ft 8+12 in)

History

edit

Phase 1

edit

Plans to open by 2025 from Zhaojiagang East to Jiutai South Railway Station including Changchun Longjia Airport Station.[1]

References

edit
  1. ^ a b c 长春轨道交通9号线一期工程正式开建,计划2025年年底通车!. 搜狐 (in Chinese). 2021-04-02. Archived from the original on 2021-08-12. Retrieved 2021-08-12.
  2. ^ "Changchun Subway Line 9". TravelChinaGuide.com.