List of European Court of Justice rulings

(Redirected from List of ECJ rulings)

The following is a list of notable judgments of the European Court of Justice.

Principles of Union Law

edit

Direct effect

edit

Treaties, Regulations and Decisions

edit

"The [European Economic] Community constitutes a new legal order of international law for the benefit of which the [Member] States have limited their sovereign rights".

"The Court ... has the jurisdiction to answer ... questions referred that ... relate to the interpretation of the treaty."

States can provide in national legislation for appropriate sanctions which are not provided for in the regulation, and can continue to regulate various related issues which are not covered in the regulation

  • Zaera 126/86 [1987] ECR 3697
  • Azienda Agricola C-403/98 [2001] ECR I-103
  • Steinberg T-17/10 [2012] 625
  • Sharif University T-181/13 [2014] 607

Directives

edit

Member States are precluded by their failure to implement a directive properly from refusing to recognise its binding effect in cases where it is pleaded against them, thus they cannot rely on their failure to implement the directive in time.

  • Becker 8/81 [1982] ECR 53
  • von Colson 14/83 [1984] ECR 1891
  • Kolpinghuis Nijmegen 80/86 [1987] ECR 3969

There is no obligation of harmonious interpretation where the national measure, interpreted in the light of the directive, would impose criminal liability.

Notwithstanding the Kolpinghuis ruling, the creation of any other kind of legal disadvantage of detriment, save for criminal liability, is very well possible.

Primacy

edit

Community law takes precedence over the Member States' own domestic law.

Duty to set aside provisions of national law which are incompatible with Community law. The Court ruled that:

A national court which is called upon, within the limits of its jurisdiction, to apply provisions of Community law is under a duty to give full effect to those provisions, if necessary refusing of its own motion to apply any conflicting provision of national legislation, even if adopted subsequently, and it is not necessary for the court to request or await the prior setting aside of such provisions by legislative or other constitutional means.[4]

National law must be interpreted and applied, insofar as possible, so as to avoid a conflict with a Community rule.

Duty on national courts to secure the full effectiveness of Community law, even where it is necessary to create a national remedy where none had previously existed.

Enforcement of EU law

edit

EU law has not established its own system for its enforcement or for aggrieved parties to seek remedies for breach of EU law.[5] In the absence of such a system,

It is clear from the case-law that ... it is for the domestic legal system of each Member State to designate the courts and tribunals having jurisdiction and to lay down the detailed procedural rules governing actions for safeguarding rights which individuals derive from Community law, provided, first, that such rules are not less favourable than those governing similar domestic actions (principle of equivalence) and, secondly, that they do not render virtually impossible or excessively difficult the exercise of rights conferred by Community law (principle of effectiveness) (Joined Cases C-430/93 and C-431/93 Van Schijndel and van Veen [1995] ECR I-4705, paragraph 17, and Case C-129/00 Commission v Italy [2003] ECR I-14637, paragraph 25).[6]

  • Joined Cases C-430/93 and C-431/93 Van Schijndel and van Veen introduced the principles of equivalence and effectiveness
  • Joined Cases C-222/05 to C-225/05, van der Weerd et al, a series of Dutch cases involving the Ministry of Agriculture, Nature and Food Quality: Community law does not require a national court ... to raise of its own motion a plea alleging infringement of the provisions of Community legislation, since neither the principle of equivalence nor the principle of effectiveness require it to do so.[6]

Rejection of the reciprocity principles of general international law

edit

"[I]n [the defendants'] view, … international law allows a party, injured by the failure of another party to perform its obligations, to withhold performance of its own … However, this relationship between the obligations of parties cannot be recognized under Community law ... The treaty is not limited to creating reciprocal obligations ... but establishes a new legal order ... [T]he basic concept of the treaty requires that the Member States not take the law into their own hands."[7]

Fundamental rights

edit

"Fundamental rights [are] enshrined in the general principles of Community law and protected by the Court."

Fundamental rights are an integral part of the general principles of law the observance of which the Court ensures.

  • Nold 4/73 [1974] ECR 491, §13

When protecting fundamental rights, "the Court is bound to draw inspiration from constitutional traditions common to the Member States, and it cannot therefore uphold measures which are incompatible with fundamental rights recognised and protected by the Constitutions of those States." The Court can also draw on international human rights treaties to which Member States have collaborated or are signatories.

  • Carpenter C-60/00 [2002] ECR I-6279

Fundamental rights affect the scope and application of Community law. In Carpenter, the Court weaved principles of respect for family and private life from Article 8 of the European Convention on Human Rights into its analysis of the rights of Union citizens. It concluded that the right of a minor child to reside in a Member State under Community law brought with it a corollary right for his mother to reside there as well.

The legislative organs of the union cannot make laws which allow private sector organisations to discriminate on the grounds of gender even if such discrimination is based on relevant and accurate actuarial and statistical data.

  • Minister voor Immigratie en Asiel C-199/12 [2013] 720

Law of the institutions

edit

Acts

edit
  • Mandelli 3/67 [1968] ECR 25

Acts of the European institutions must be supported by sufficient reasoning, the validity of which shall be examined by the Court.

Legislative process

edit
  • Variola 34/73 [1973] ECR 981
  • Roquette Frères v Council 138/79 [1980] ECR 3333
  • Germany v Commission 24/62 [1963] ECR 131
  • Tariff Preferences case 45/86 [1987] ECR 1493
  • Beus 5/67 [1968] ECR 83
  • Tobacco Advertising case C-376/98 [2000] ECR I-8419
  • Opinion 2/94 [1996] ECR I-1759

The European Community does not have the power under the treaties to accede to the European Convention on Human Rights.

  • Parliament v Council C-65/93 [1995] ECR I-643

Liability

edit

The Plaumann test sets out the criteria for non-privileged applicants to prove individual concern: 'Applicants must show that the decision affects them by reason of certain attributes which are peculiar to them or by reason of circumstances in which they are differentiated from all other persons and by virtue of these factors distinguishes them individually just as in the case of the person addressed.'

  • Codorníu v Council C-309/89 [1994] ECR I-1853

In this case the court took a more liberal approach than the restrictive Plaumann test for establishing individual concern, which was, however, not followed in judgements thereafter.

Interim orders

edit

Article 186 of the Treaty of Rome stated that the Court "may, in any cases referred to it, make any necessary interim order".[8] Article 39 of the Treaty of Nice's Protocol on the Statute of the Court of Justice (2001) states that "the President of the Court may, by way of summary procedure ... prescribe interim measures in pursuance of Article 243 of the EC Treaty or Article 158 of the EAEC Treaty".[9]

In Commission of the European Communities v Kingdom of Belgium (1994), the president dismissed an application for interim measures submitted by the commission on 11 March 1994 because the commission had "not displayed the diligence to be expected". The commission had been aware of an alleged breach of the procurement directives in October 1993, and had referred on 8 February 1994 to its "intention" to seek the suspension of a public supplies contract, but did not apply for an interim order until 11 March 1994.[10]

Competition

edit

Leading cases on competition law include Consten & Grundig v Commission and United Brands v Commission.

  • Case C-185/95: Baustahlgewebe v. Commission. In 1989 the European Commission had adopted a determination that 14 producers of welded steel mesh had engaged in unlawful restrictions of competition.[11] German company Baustahlgewebe GmbH appealed the decision on 20 October 1989 and the Court of First Instance did not rule on the case until 6 April 1995, five years and six months later. The Court of Justice held that the case had not been determined within a reasonable time and reduced the ECU 3 million fine by ECU 50,000 (a reduction of 1.67%).[12]
  • Case C-231/03: Coname v Comune di Cingia de' Botti in Italy (competition and free movement of persons).[13] The court established that transparency obligations apply to the award of a concession for the management of the public gas distribution service.[14]
  • Case C-501/06 P: GlaxoSmithKline Services and Others v Commission and Others, joined with cases C-513/06 P, C-515/06 P and C‑519/06 P: four appeals brought under Article 56 of the Statute of the Court of Justice, 2006, regarding Article 81 of the Treaty of Rome.[15]
  • Prezes Urzędu Ochrony Konkurencji i Konsumentów v Tele2 Polska sp. z o.o. (now Netia SA): the Polish national competition authority determined that Telekomunikacja Polska SA was not abusing a dominant position on the market. The ECJ ruled that only the European Commission has competence to make such a decision.[16]
  • Simba Toys T-450/09 [2014] 983
  • C-68/12 - Slovenská sporiteľňa et al. - three banks colluded against a non-banking financial institution which was alleged to be operating illegally in the Slovak Republic. The court ruled that the allegation of illegal operation was irrelevant to determining whether the banks' collusion interfered with the structure of the market and in particular with the interests of competition itself.[17]
  • C-230/16 - Coty Germany GmbH v Parfümerie Akzente GmbH - a supplier of luxury goods is able to prevent its authorised distributors from selling them on a third-party internet platform.[18]
  • Judgments were issued collectively on 1 February 2018 in four cases concerning anti-competitive behaviour and concerted practices in the international air freight forwarding services market:[19]
    • Case C-261/16: P Kuhne + Nagel International and others v European Commission, regarding a cartel agreeing surcharges on export declarations, referred to as the "new export system" cartel
    • Case C-263/16: P Schenker v Commission
    • Case C-264/16: P Deutsche Bahn and others v Commission
    • Case C-271/16: P Panalpina World Transport (Holding) and others v Commission
The last three cartels referred to above were those known as the "advanced manifest system" cartel, the "peak season surcharge" cartel and the "currency adjustment factor" cartel.[20]

Consumer protection

edit

Three cases which impact on the national courts' approach to considering fairness in consumer contracts are:

  • Case C-168/05 Mostaza Claro ECR I-10421 - this ruling requires national courts to assess of their own motion whether a contractual term is unfair, due to "the nature and importance of the public interest underlying the protection which [the directive under consideration] confers on consumers".[21]: Paragraph 340 
  • Case C-243/08 Pannon GSM Zrt. v Erzsébet Sustikné Győrfi, ECR I-4713 - the courts are required to examine the unfairness of a contractual term "where [they] have available ... the legal and factual elements necessary for that task".[22] The UK Government interprets the ruling as meaning that "the courts would not have to look at the fairness of the term if they do not have adequate information to do so".[21]: Paragraph 341  On concluding its examination of such a term, "where [the court] considers such a term to be unfair, it must not apply it, except if the consumer opposes that non-application".[22]
  • Case C-137/08 VB Penzugyi v Schneider - the courts would only have to look at the term or terms in question, not the entire contract.[21]: Paragraph 341 

Contractual obligations

edit

Data protection

edit

Employment

edit
 
Office of the Rotterdamsche Droogdok Maatschappij shipbuilding company

External relations

edit

External trade

edit
  • Portugal v Council, case C-149/96: application made by the government of Portugal for the annulment of Council Decision 96/386/EC of 26 February 1996 concerning the conclusion of Memoranda of Understanding between the European Community and the Islamic Republic of Pakistan (signed 31 December 1994) and between the European Community and the Republic of India (signed 15 October 1994) on arrangements in the area of market access for textile products. Among other concerns, the Portuguese government argued that the principle of transparency had been breached,[3] because the contested decision approved Memoranda of Understanding which were "not adequately structured and are drafted in obscure terms which prevent a normal reader from immediately grasping all their implications, in particular as regards their retroactive application".[26] In support of this plea, Portugal relied on a European Council resolution of 8 June 1993 on the quality of drafting of Community legislation.[27] In this respect, the Court ruled that the 1993 resolution had no binding effect and that in any case, "the decision appears to be clear in every aspect".[26]: paragraphs 55–57 

Intellectual property rights

edit

Internal market

edit

Free movement of goods

edit

Definition of "goods"

edit

'Goods' are "products which can be valued in money and which are capable, as such, of forming the subject of commercial transactions".

  • Commission v Belgium C-2/90 [1992] ECR I-4431

"Waste, whether recyclable or not, is to be regarded as 'goods'."

Customs duties and equivalent charges

edit

Articles 23 and 25 EC prohibit as between Member States all "customs duties on imports and exports and of all charges having equivalent effect". The prohibition in Article 25 also applies to customs duties of a fiscal nature.

  • Commission v Italy ('Italian statistical data') 24/68 [1969] ECR 193

Customs charges are prohibited because "any pecuniary charge, however small, imposed on goods by reason of the fact that they cross a frontier constitutes an obstacle to the movement of such goods."

  • Diamantarbeiders 2/69 and 3/69 [1969] ECR 211

A charge having equivalent effect to a customs duty is "any pecuniary charge however small and whatever its designation and mode of application which is imposed unilaterally on domestic or foreign goods by reason of the fact that they cross a frontier and which is not a customs duty in the strict sense." This is the case "even if it is not imposed for the benefit of the State [and] is not discriminatory or protective in effect, or if the product on which the charge is imposed is not in competition with any domestic product."

  • Bresciani 87/75 [1976] ECR 129

Charges imposed for a public health inspection carried out on the entry of goods to a Member State can be a charge having equivalent effect to a customs duty. It was not important that the charges were proportionate to the costs of the inspection, nor that such inspections were in the public interest.

  • Commission v Germany 18/87 [1988] ECR 5427

A charge for a service will not be regarded as a customs duty where it: (a) does not exceed the cost of the service, (b) that service is obligatory and applied uniformly for all the goods concerned, (c) the service fulfills obligations prescribed by Community law, and (d) the service promotes the free movement of goods in particular by neutralising obstacles which may arise from unilateral measures of inspection.

Indirect taxation

edit

Article 110 EC prevents any Member State from imposing, "directly or indirectly, on the products of other Member States any internal taxation of any kind in excess of that imposed directly or indirectly on similar domestic products". This prohibition also extends to "internal taxation of such a nature as to afford indirect protection to other products".

  • Humblot 112/84 [1985] ECR 1367

Quantitative restrictions

edit

Article 34 EC bans "quantitative restrictions on imports and all measures having equivalent effect shall be prohibited between Member States", the same provision in respect of exports is found in Article 35 EC.

  • Geddo v Ente 2/73 [1973] ECR 865

Quantitative restrictions are "measures which amount to a total or partial restraint of, according to the circumstances, imports, exports or goods in transit."

Measures having Equivalent effect to a Quantitative Restriction (MEQRs)
edit

The following are prohibited as Measures having Equivalent effect to a Quantitative Restriction (MEQRs): "all trading rules enacted by Member States which are capable of hindering, directly or indirectly, actually or potentially, intra-Community trade."

Justification
edit

Article 36 EC exempts quantitative restrictions which are justified on grounds of "public morality, public policy or public security; the protection of health and life of humans, animals or plants; the protection of national treasures possessing artistic, historic or archaeological value; or the protection of industrial and commercial property". The restrictions must not, in any case, "constitute a means of arbitrary discrimination or a disguised restriction on trade between Member States".

  • Cassis de Dijon 120/78 [1979] ECR 649
  • Henn and Darby 34/79 [1979] ECR 3795
  • Keck and Mithouard C-267/91 and C-268/91 [1993] ECR I-6097
  • Torfaen Borough Council C-145/88 [1989] ECR 3851

Commission v Austria cases

edit

Cases C-320/03 and C-28/09 found that rules prohibiting use of part of the A12 Autobahn by lorries of over 7.5 tonnes carrying certain goods were an unjustified restriction of the free movement of goods, even though the relevant Austrian laws were a response to the EU directives on air quality.[30]

Product liability

edit

The Product Liability Directive aims to ensure undistorted competition between economic operators, to facilitate the free movement of goods and to avoid differences in levels of consumer protection.[31]

  • Case-495/10 - Centre hospitalier universitaire de Besançon v Thomas Dutrueux, Caisse primaire d'assurance maladie du Jura, 21 December 2011: The directive is not intended "exhaustively to harmonise the sphere of liability for defective products beyond its own area of application", which concerns producer and importer liability for defective products. A French healthcare law which also imposes a form of no-fault liability on public hospitals is therefore not incompatible with the directive.[31]

Free movement of persons

edit

Workers

edit
  • Hoekstra 75/63 [1964] ECR 347
  • Sotgiu 152/73 [1974] ECR 153
  • Van Duyn 41/74 [1974] ECR 1337
  • Levin 53/81 [1982] ECR 1035
  • Lawrie-Blum 66/85 [1986] ECR 2121
  • Union nationale des entraîneurs et cadres techniques professionnels du football (Unectef) v Georges Heylens and others, C-222/86, judgment dated 15 October 1987, ruled that it must be possible for a worker to challenge a refusal to recognise the equivalence of a diploma. George Heylens in this case was a Belgian footballer. French rules at the time required a football trainer working in France to have a French qualification.[32]
  • Bettray 344/87 [1989] ECR 1621
  • Groener C-379/87 [1989] ECR 3967
  • Antonissen C-292/89 [1991] ECR I-745
  • Bosman C-415/93[1995] ECR I-4921
  • Angonese C-281/98 [2000] ECR I-4139
  • Trojani C-456/02 [2004] ECR I-07573

Citizenship

edit
  • Grzelczyk C-184/99 [2001] ECR I-6193
  • Garcia Avello C-148/02 [2003] ECR I-11613
  • Collins C-138/02 [2004] ECR I-2703
  • Zhu and Chen C-200/02 [2004] ECR I-9925
  • Metock and Others C-127/08 [2008] ECR I-6241
  • Libert et al v Gouvernement flamand (Flemish Government), Case C-197/11, found that a decree of the Flemish Region dated 27 March 2009 on land and real estate, which restricted transfer of certain land to persons with a "sufficient connection" with the local community, breached the Citizens' Rights Directive, 2004/38/EC. The case was joined with case C-203/11.[33]

Freedom of establishment and to provide services

edit

Establishment

edit
  • Reyners 2/74 [1974] ECR 631
  • Thieffry 71/76 [1977] ECR 765
  • Factortame II C-221/89 [1991] ECR I-3905
  • Vlassopoulou 340/89 [1991] ECR 2357
  • Centros C-212/97 [1999] ECR I-1459
  • Überseering C-208/00 [2002] ECR I-9919
  • Joined cases C-186/11 and C-209/11 Stanleybet et al. v. Organismos prognostikon agonon podosfairou AE (OPAP) regarding OPAP's monopoly betting licence under Greek national law.[34]

Services

edit
  • van Binsbergen 33/74 [1974] ECR 1299
  • Cowan 186/87 [1989] ECR 195
  • Rush Portuguesa C-113/89 [1990] ECR I-1417
  • Gebhard C-55/94 [1995] ECR I-4165
  • Bosman C-415/93[1995] ECR I-4921
  • Case C-393/05, Commission v Austria, concerning the Austrian requirement that every inspection body in the field of organic agriculture with a registered office outside Austria must also maintain an office inside Austria. The Court held that this requirement was a disproportionate restriction on freedom to provide services.[35]
  • Case C-434/15, Asociación Profesional Elite Taxi v Uber Systems Spain SL: the service provided by Uber connecting individuals with vehicle drivers is to be classified as a service in the field of transport.[36]

Non-application of single market principles

edit
  • Case C-108/98 - RI.SAN. v Comune di Ischia, Italia Lavoro SpA, formerly GEPI SpA and Ischia Ambiente SpA: the treaty principles relating to freedom of movement, freedom of establishment and freedom to provide services were not engaged by the facts of the case, because the facts were "confined to a single Member State". RI.SAN. Srl had challenged the decision of the comune to appoint a mixed-capital limited company to provide its waste management services, but as RI.SAN. was an Italian organisation it was not relying on the freedoms to operate across Member State boundaries which were provided for by the EC Treaty.[37]

Investment

edit
  • Case C-284/16 - Slowakische Republik v Achmea BV: in 2018, the court ruled that the arbitration clause in the 1991 agreement between The Netherlands and Slovakia (formerly the Czech and Slovak Federative Republic) on the protection of investments was "not compatible with EU law".[38]

Jurisdiction and the recognition and enforcement of judgments

edit
  • Allianz SpA v West Tankers, case C-185/07, concerned Regulation 44/2001 on the recognition and enforcement of foreign arbitral awards. Anti-suit injunctions restraining a party from commencing or continuing processes in the court of a Brussels Regulation member state cannot be granted in the court of another member state because this would be incompatible with the regulation.
  • Marco Gambazzi v DaimlerChrysler Canada Inc. and CIBC Mellon Trust Company, case C–394/07, concerned implementation of the public policy clause of the Brussels Convention (now the Brussels I Regulation). In this case, the court ruled that the Italian courts (and potentially other courts of member states) could decline to enforce a default judgment entered against Mr Gambazzi in the UK courts if, following a "comprehensive assessment of the proceedings", the court considered that the default judgment in the absence of the defendant "constituted a manifest and disproportionate infringement of [his] right to be heard".[39]
  • Car Trim GmbH v KeySafety Systems SrL (case C-381/08) and Electrosteel Europe sa v Edil Centro SpA, (case C-87/10): two linked cases regarding the place of "performance" of a contractual obligation, which may be used to determine the national court with jurisdiction in a civil or commercial matter. This will in general be the place of delivery in relation to a contract for the sale of goods. These cases looked at situations where goods were made available for delivery to a purchaser in another member state. The terms of the contract should first be considered to determine where "delivery" is to take place, but if this is not possible (not knowing which member state's substantive contract law is to apply), the place where goods are physically handed over to the purchaser or their agent will determine the place of performance.[40]
  • Pammer v. Karl Schlütter GmbH & Co. KG (case C-585/08) and Hotel Alpenhof v. Mr. Heller (case C-144/09), 2010: see Pammer and Alpenhof cases

Police and judicial cooperation in criminal matters

edit

Procurement

edit

Procurement procedures of entities operating in the water, energy, transport and postal services sectors

edit
  • Case C-513/99 - Concordia Bus Finland Oy Ab, formerly Stagecoach Finland Oy Ab v Helsingin kaupunki and HKL-Bussiliikenne, also a public procurement ruling, delivered 17 September 2002. The City of Helsinki began progressively tendering for the operation of bus services across the whole city network in 1997. Concordia Bus Finland challenged the inclusion of environmental factors in the evaluation criteria.[42] One of the objections of Concordia Bus was that the criteria were discriminatory because the Community’s own bus company HKL was the only company with gas-powered vehicles that could comply with the emission levels set. The court ruled that the fact that one of a set of various award criteria imposed by the contracting authority could only be met by a small number of companies did not in itself make this discriminatory.[43]
  • Case C-394-02: Commission of the European Communities v Hellenic Republic. Circumstances following an environmental impact assessment with a deadline for implementation did not qualify as "extreme urgency" for the purposes of justifying a negotiated contract being agreed without advertising an opportunity for other companies to express interest.[44] See Public Power Corporation#Legal issues.
  • Case C-206/08: Wasser- und Abwasserzweckverband Gotha und Landkreisgemeinden (WAZV Gotha) v Eurawasser Aufbereitungs- und Entsorgungsgesellschaft mbH. Ruled in relation to a contract for the supply of services, that "the fact that the supplier does not receive consideration directly from the contracting authority, but is entitled to collect payment under private law from third parties, is sufficient for the contract in question to be categorised as a 'service concession' within the meaning of Article 1(3)(b) of Directive 2004/17/EC of the European Parliament and of the council of 31 March 2004".[45]

Public procurement

edit
  • Case 31/87 Gebroeders Beentjes BV v State of the Netherlands on the interpretation of Council Directive 71/305/EEC of 26 July 1971 concerning the coordination of procedures for the award of public works contracts: a "social consideration" such as a condition relating to the employment of long-term unemployed persons is compatible with the public works directive if it has no direct or indirect discriminatory effect on tenderers from other Member States of the Community.[46] In his opinion as an Advocate-General in this case, Marco Darmon [de] also advised that the distinction between checking a tenderer's suitability for a specific contract and the contract award decision based on the bid evaluation criteria does not require these two steps to be assessed in sequence, and where an awarding authority "belatedly" becomes aware of a tenderer's unsuitability, it should be able to rely on that information "up to the last moment".[47]
  • Case C-243/89 Commission v Denmark - construction contract for the Storebaelt bridge: a condition requiring use of local labour and local materials was held to be incompatible with treaty principles.[48]
  • Case C-107/92 Commission v Italian Republic – an urgent need had arisen to construct an avalanche barrier in the Alpe Gallina region near Colle Isarco and Brenner in the South Tyrol, following publication of a geological report in June 1988 recommending in advance of the 1988-89 winter. The Italian government appointed a contractor without advertising in the Official Journal of the European Communities on the grounds of urgency, but the European Commission argued, and the Court agreed, that there was sufficient time to advertise the works opportunity under the accelerated procedure as defined in section 15 of the Directive on Public Works Contracts (Directive 71/305/EEC).[49]
  • Case C-331/92 Gestión Hotelera Internacional SA v Comunidad Autónoma de Canarias, Ayuntamiento de Las Palmas de Gran Canaria and Gran Casino de Las Palmas SA: the contract in question covered the assignment of publicly-owned land to a casino concession with incidental works to be undertaken in order to operate the casino. The court held that, because the works were "merely incidental" to the concession, the provisions of Directive 71/305 did not apply to the contract award procedure.[50]
  • Case C-97/94 Commission v Belgium: contracting authorities have "a degree of choice" as to which procurement procedure they follow for each procurement exercise, but "once they have issued an invitation to tender under one particular procedure, they are required to observe the rules applicable to it until the contract has been finally awarded". In this case, brought by the Commission of the European Communities against the Kingdom of Belgium, the Belgian government argued that although this tender for the supply of buses for public transport in the Walloon region had been issued using the "Open Procedure", the "negotiated procedure" could have been used instead. The court stated that subsequently changing the procedure in order to negotiate (or accept further post-tender information) was not permitted.[51]
  • Case C-225/98 Commission v French Republic – ruled that the Nord-Pas-de-Calais region and the Département du Nord had failed to fulfil their legal obligations through the use of employment criteria in the technical specification used when contracting for the construction and maintenance of school buildings. However, the court ruled that where a contracting authority had to assess two or more economically equivalent bids, they could adopt employment opportunities as an "accessory" or "additional" criterion, as long as the use of this criterion was not discriminatory.[52]
  • Case C-237/99 Commission v French Republic – ruled that the French public housing institutions, offices publics d'aménagement et de construction (OPAC, public development and construction entities) and societes anonymes habitations à loyer modéré (SA HTMs, low-rent housing corporations) met the criteria in the then-applicable public works contracts directive (Council Directive 93/37/EEC) for being treated as a "body governed by public law" according to article 1(b) of the directive:
  • a body established for the specific purpose of meeting needs in the general interest, not having an industrial or commercial character,
  • having legal personality, and
[either]
  • financed, for the most part, by the State, or regional or local authorities, or other bodies governed by public law, or
  • subject to management supervision by those bodies, or
  • having an administrative, managerial or supervisory board, more than half of whose members are appointed by the State, regional or local authorities or by other bodies governed by public law.[53][46] Accordingly they were subject to the obligation to publish relevant above-threshold contracts in the Official Journal of the European Communities.[54]
  • Case C-470/99 Universale-Bau AG established that a contracting authority must disclose not just the selection criteria it intends to use in the award of a public contract, but also the weighting that it intends to apply in respect of those criteria.[55] The ruling also established that the EU's procurement legislation does not preclude national rules invoking a time limit during which an application for review of a contracting authority's decision must be commenced, so long as the time limit is "reasonable".[55]: Paragraph 79 
  • Case C-19/00 SIAC Construction Ltd. v The County Council of the County of Mayo - the court ruled on the interpretation of Article 29 of Council Directive 71/305/EEC of 26 July 1971: see SIAC Construction Ltd v The County Council of the County of Mayo#Court of Justice of the European Union
  • Case C-488/01 Wienstrom case: the court ruled that in a tender for energy supply, a criterion relating solely to the amount of electricity produced from renewable sources in excess of the expected consumption of the contracting authority (which was the subject of the contract) could not be considered to be linked to the subject-matter of the contract. To establish such a link to the subject-matter of the contract, the criterion relating to the amount of electricity produced from renewable sources should have concerned only the electricity effectively supplied to the contracting authority,[43] namely the Austrian federal government, in respect of its offices in the Land of Carinthia.[56]
  • Case C-327/00 Santex SpA v Unita Socio Sanitaria Locale n. 42 di Pavia: Unita Socio Sanitaria Locale n.42 di Pavia in Italy tendered for home-delivery of incontinence products for their service users. A requirement in the invitation to tender (ITT) referring to tenderers' turnover over the preceding three years was challenged by a bidder, Santex SpA, and so the public body stated that the requirement would not effect eligibility to tender but would be considered in tender evaluation. Tender evaluation was postponed while additional information was requested from bidders, but ultimately the public body decided to enforce the requirement in the ITT and exclude certain bidders, including Santex, from evaluation. Santex sought to enforce its original challenge in court but as it was now more than 60 days from the publication of the ITT it was ruled out of time. The Court stated that the principle of effectiveness required the national court to override the 60 day limitation period and allow Santex's challenge to be heard.[57]
  • Case C-211/02 Tideland Signal Ltd v European Commission: supply case where the Commission rejected a tender in circumstances where the Court of First Instance held that a clarification should have been sought instead of the tender being rejected, giving rise to a proposition on the circumstances where a clarification should be sought, subsequently referred to as the "Tideland principles".[58][59]
  • Joined cases C-226/04 and C-228/04: whether companies bidding for public service contracts who have failed to pay tax or social security contributions on time but have subsequently regularised their position may be included within a procurement procedure, where national harmonising legislation makes provision for such companies not to be considered.[60]
  • Case C-331/04 ATI EAC and Others v ATCV Venezia SpA and others, a public service contracts case, allowed that specific weightings may be applied to the subheadings of an award criterion which are defined in advance, even though the weightings were not determined at the time when the contract notice was issued, so long as the criteria themselves are not amended, the weightings do not contain elements which, if they had been known at the time the tenders were prepared, could have affected their preparation, and they do not give rise to any discrimination between the tenderers.[61]
  • Case C-444/06 Commission v Spain: the Spanish public procurement rules did not adequately transpose the requirements of Council Directive 89/665/EEC on the coordination of the laws, regulations and administrative provisions relating to the application of review procedures to the award of public supply and public works contracts, as amended by Council Directive 92/50/EEC of 18 June 1992. However, in regard to some provisions in Spanish law intended to preserve the effects of a contract subject to an administrative declaration of invalidity and to maintain continuity of public service provision, the Court found that the commission had not demonstrated that the legislation undermined the requirements of the review directive.[62]
  • Case C‑450/06 Varec SA v Belgian State, 14 February 2008: a review body must ensure that confidentiality and business secrecy are respected. The review body itself is responsible for determining how this can best be done whilst also providing effective legal protection and respecting the rights of the parties to the dispute under review to conduct their defence.[63]
  • Case C-454/06 pressetext Nachrichtenagentur GmbH v Republic of Austria, on amendments to the Austrian government's contract with the Austria Press Agency (APA), and the question of material amendments to a contract.[64]
  • Case C-532/06 Emm G Lianakis AE and others v Dimos Alexandrouplis and others, states that the "selection" and "award" stages of a procurement process are distinct processes with different purposes and should not be fused into one. The case establishes that a supplier's "experience" may be used as a selection criterion but cannot function as a evaluation criterion at the "award" stage.[65]
  • Case T-258/06 Commission v Germany, a case in the General Court of the European Union: Germany unsuccessfully challenged the lawfulness of the Commission's Interpretative Communication on the Community law applicable to contract awards not or not fully subject to the provisions of the Public Procurement Directives, published in August 2006.[66]
  • Case C‑538/07 Assitur Srl v Camera di Commercio, Industria, Artigianato e Agricoltura di Milano: addressed a referral from the Italian Tribunale Amministrativo Regionale per la Lombardia for advice on whether the list of criteria in the (old) procurement directive 92/50/EEC for excluding tenderers from a procurement process was to be treated as exhaustive. The ruling confirmed that in itself the list was not exhaustive, but parallel Italian legislation according to which "undertakings linked by a relationship of control or affiliated to one another" were not permitted to take part simultaneously in the same procurement procedure" was unlawful unless the businesses involved were given "an opportunity to demonstrate that [their] relationship did not influence their conduct in the course of that tendering procedure".[67]
  • Case C-406/08, Uniplex (UK) Ltd. v NHS Business Services Authority: reviewed the provision in the UK's Public Contracts Regulations obliging an unsuccessful tenderer to submit a challenge to the contracting authority's decision "promptly, and in any event within three months". The court concluded that this national provision was contrary to EU law because this form of wording prevented claimants from knowing the exact time limit which would apply.[68]
  • Case C-456/08 Commission v Ireland: Order 84A of the Rules of the Superior Courts in Ireland required procurement review actions to be brought "at the earliest opportunity and in any event within three months". The Court ruled that this wording left disappointed bidders "in uncertainty regarding their position when they consider making use of their Community law right to effective legal remedy against a decision of a contracting authority".[69] A new Order 84A was issued by the Irish Government on 8 September 2010 which is now consistent with EU law. This requires that actions be brought within 30 calendar days of when the claimant "knew or ought to have known" of the alleged infringement".[70]
  • Case C-599/10 SAG ELV Slovensko a.s. and others v Úrad pre verejné obstarávanie, referral from the Najvyšší súd Slovenskej republiky (Supreme Court of the Slovak Republic). In a case where a tender is imprecise or does not meet the technical requirements of the specification, there is no obligation to consult the tenderer or to ask for a clarification, and to do so would conflict with the principle of equal treatment of tenderers. There is a duty to request clarification of an abnormally low price and in this case the contracting authority "must set out clearly its request for clarification".[71]
  • Case C-182/11 Econord SpA v Comune di Cagno et al., 29 November 2012: control "similar to the control which [a local authority] exercises over its own departments" is maintained where the authority holds capital in a public entity and also plays "a role in its managing bodies".[72] Joined case with case C-183/11.[72]
  • Case 94/12 Swm Contruzioni 2 SpA and Mannochi Luigino DI v. Provincia di Fermo ruled that Italian public works contracting rules which prevented a tenderer from relying on the capacities of more than one other business in each category covered by the business qualification system was inconsistent with the rules in the public procurement directive of 2004 allowing "entities" (plural), as a general rule, to be engaged in supporting the delivery of a contract or evidencing that the necessary capacity was available to the tendering organisation.[73]
  • Case C-552/13 Grupo Hospitalario Quirón SA v Departamento de Sanidad del Gobierno Vasco and Instituto de Religiosas Siervas de Jesús de la Caridad, confirmed that the 2004 Directive on Public Procurement did not permit a tender for medical services to state as a requirement that the proposed services must be provided within the boundaries of a particular locality, in this case the municipality of Bilbao.[74] A more general proximity requirement in the specification, more easily justifiable, was not criticised by the court.[75]
  • Case T-4/13 - Communicaid Group Ltd. v European Commission, another EU General Court case. Communicaid, a London-based language-training company challenged a procurement award decision made by the Commission and requested that the proposed contract award be suspended. The challenge was dismissed as Communicaid had failed to establish why urgent measures were required.[76]
  • Case C-413/17 – Roche Lietuva, related to the detailed formulation of technical specifications.[77]

Social policy

edit
  • Defrenne III C-149/77 [1978] ECR 1365: the scope of article 119 does not extend beyond equal pay, but the elimination of sex discrimination is a fundamental principle of Community law.[78]
  • Bundesdruckerei v. Stadt Dortmund, Case C-549/13: the City of Dortmund could not require tenderers for a document digitalisation contract to commit to paying German minimum wage levels to the workforce when they were intending to sub-contract the performance of the contract to a firm based in Poland outside the scope of the German minimum wage law.[79]

State liability

edit

Taxation

edit

Value added tax

edit
  • C-97/90 – Lennartz v Finanzamt München III: reference for a preliminary ruling on VAT paid on the purchase of capital goods.[80]
  • Axel Kittel & Recolta Recycling SPRL (cases C-439/04 and C-440/04, issued 6 July 2006) (known as Kittel), a missing trader fraud case. Under the Kittel ruling, "the right to claim input tax could be denied to anyone in the supply chain if the trader knew or should have known that their transactions were connected with VAT fraud".[81]

VAT groups

edit

Taxation barrister Philip Simpson refers to "the three main ECJ cases" on VAT groups as:

  • Case C-162/07, Ampliscientifica and Amplifin v. Ministero dell’Economia e delle Finanze, (2008, Italy) ECR I-4019: Italy had failed to consult the EU's VAT Committee in accordance with Article 11 of the Sixth VAT Directive
  • Case C-7/13 Skandia America Corp (USA) v. Skatteverket (the Swedish Tax Agency), 14 September 2014, affected certain member states who operate a form of "establishment-only" VAT grouping.[82] According to HMRC's summary of this case,

    Skandia America Corporation was a company incorporated in the United States, with a fixed establishment (a branch) in Sweden. The Swedish branch became part of a Swedish VAT group. The Swedish tax authority viewed services provided by Skandia America Corporation to its Swedish branch as taxable transactions. Skandia disagreed on the grounds that these were intra-company transactions and consequently not supplies for VAT purposes, following the decision in FCE Bank (C-210/04). ... The [ECJ] stated that under the Swedish grouping provisions only the branch that was physically located in Sweden could belong to a Swedish VAT group. The [ECJ] ruled that consequently the branch in Sweden became part of single taxable person (the group) different to the taxable person of the US head office. So the provision of IT services by the head office to its branch was a supply between 2 separate taxable persons and so liable to VAT. The Swedish VAT group had to account for VAT on those services under the reverse charge.[83]

  • Cases C-108/14 and C-109/14 (conjoined), Larentia + Minerva and Marenave, 16 July 2015.[84]

A separate ruling is Case C-355/06, van der Steen (2007), a case which Simpson refers to as "not terribly clear".[84]

Fifty-seven pre-accession cases

edit

The following is the official list of fifty-seven cases that were translated in preparation for new member states who joined the European Union in 2004.[85] The list below contains fifty case names, because some cases were joined.

Notes

edit
  1. ^ See also Marshall v Southampton Health Authority
  2. ^ InfoCuria, Commission v Spain, 13 September 2001, accessed 11 June 2021
  3. ^ a b Prechal, S. and de Leeuw, M. (2007), "Dimensions of Transparency: The Building Blocks for a New Legal Principle?", Review of European and Administrative Law, Vol. 0, No. 1, pp. 51-61
  4. ^ European Court of Justice, Reference to the Court under Article 177 of the EEC Treaty by the Pretore di Susa (Italy) for a preliminary ruling in the action pending before that court between Amministrazione DELLE Finanze pello Stato (Italian Finance Administration) and Simmenthal S.p.A, delivered 9 March 1978, accessed 1 June 2021
  5. ^ Edwards, D., The impact of the EU law principle of effectiveness, Francis Taylor Building, Solicitor's Journal, published 19 June 2012, accessed 25 January 2023
  6. ^ a b European Court of Justice, Joined Cases C-222/05 to C-225/05, van der Veerd et al., 7 June 2007, accessed 25 January 2023
  7. ^ Commission of the European Economic Community v Grand Duchy of Luxembourg and Kingdom of Belgium, joined cases 90/63 and 91/63, [1964] ECR 625, accessed 29 May 2021
  8. ^ Article 186
  9. ^ Protocol on the Statute of the Court of Justice, accessed 27 January 2021
  10. ^ EUR-Lex, Commission of the European Communities v Kingdom of Belgium, Order of the President, Case C-87/94 R, 22 April 1994, accessed 28 January 2021
  11. ^ European Commission, Decision 89/15/EEC, 2 August 1989
  12. ^ European Court of Justice, Press Release 81/98, The Court of Justice applies "reasonable time" rule and reduces fine imposed on company, 17 December 1998, accessed 5 May 2023
  13. ^ [2005] EUECJ C-231/03 (21 July 2005)
  14. ^ European Sources Online, Press Release: Judgment of the Court of Justice in Case C-231/03. Consorzio Aziende Metano (Coname) v. Comune di Cingia de’ Botti. The awards by a municipality of a public service concession to a company with predominantly public share capital must comply with transparency criteria, published 21 July 2005, accessed 4 November 2022
  15. ^ InfoCuria, Joined Cases C‑501/06 P, C-513/06 P, C-515/06 P and C‑519/06 P, published 6 October 2009, accessed 4 November 2022
  16. ^ EUR-Lex, Prezes Urzędu Ochrony Konkurencji i Konsumentów v Tele2 Polska sp. z o.o., devenue Netia SA, judgment of 3 May 2011, accessed 7 February 2023
  17. ^ EUR-Lex, Protimonopolný úrad Slovenskej republiky v Slovenská sporiteľňa a.s., published 7 February 2013, accessed 1 February 2023
  18. ^ European Court of Justice, A supplier of luxury goods can prohibit its authorised distributors from selling those goods on a third-party internet platform such as Amazon, Press Release 132/17, published 6 December 2017, accessed 21 November 2023
  19. ^ Court of Justice of the European Union, The Court of Justice upholds the fines imposed by the Commission on a number of companies for their participation in cartels in the international air freight forwarding services sector, Press Release 09/18, published 1 February 2018, accessed 1 February 2021
  20. ^ European Commission, Antitrust: Commission imposes € 169 million fine on freight forwarders for operating four price fixing cartels, Brussels, published 28 March 2012, accessed 8 February 2022
  21. ^ a b c   This article incorporates text published under the British Open Government Licence: UK Legislation, Consumer Rights Act 2015, section 71: Explanatory Notes, published 26 March 2015, accessed 21 February 2024
  22. ^ a b European Court of Justice, Case C-243/08: Pannon GSM Zrt. v Erzsébet Sustikné Győrfi, paragraph 35, delivered 4 June 2009, accessed 24 May 2024
  23. ^ European Court of Justice, Intercontainer Interfrigo SC (ICF) v Balkenende Oosthuizen BV and MIC Operations BV, case C-133/08, delivered 6 October 2009, accessed 22 May 2024
  24. ^ EUR-Lex, Maximillian Schrems v Data Protection Commissioner, published 6 October 2015, accessed 28 July 2021
  25. ^ Personnel Today, TUPE test cases serve as good employer guideline, published 27 July 2004, accessed 7 March 2021
  26. ^ a b European Court of Justice, Case C-149/96 Portugal v Council, accessed 10 June 2021
  27. ^ EUR-Lex, Council Resolution of 8 June 1993 on the quality of drafting of Community legislation, 8 June 1993, accessed 10 June 2021
  28. ^ EUR-Lex, Adidas-Salomon AG and Adidas Benelux BV v Fitnessworld Trading Ltd., European Court Reports 2003 I-12537, accessed 1 December 2023
  29. ^ Court of Justice, The Court specifies the conditions under which goods coming from non-member States that are imitations or copies of goods protected in the EU by intellectual property rights may be detained by the customs authorities of the Member States, Philips Electronics NV v Lucheng Meijing Industrial Company Ltd. and others; and Nokia Corporation v Her Majesty’s Commissioners of Revenue and Customs, 1 December 2011, accessed 7 February 2021
  30. ^ Court of Justice of the European Union, The traffic prohibition for lorries carrying certain goods on the Inn valley motorway in the Tyrol is incompatible with the free movement of goods, Press Release 138/11, published 21 December 2011, accessed 19 December 2023
  31. ^ a b ECJ, The liability of a public healthcare establishment, in its capacity as a service provider, does not fall within the scope of the Product Liability Directive, Press Release 142/11, published 21 December 2011, accessed 28 January 2023
  32. ^ ECJ, Union nationale des entraîneurs et cadres techniques professionnels du football (Unectef) v Georges Heylens and others, published 15 October 1987, accessed 10 January 2023
  33. ^ European Court of Justice, Judgment of the Court (First Chamber), 8 May 2013. Eric Libert and Others v Gouvernement flamand (C‑197/11) and All Projects & Developments NV and Others v Vlaamse Regering (C‑203/11), accessed 8 December 2022
  34. ^ InfoCuria, Judgment of the Court (Fourth Chamber), 24 January 2013: Stanleybet International Ltd (C‑186/11) William Hill Organization Ltd (C‑186/11) William Hill plc (C‑186/11) Sportingbet plc (C‑209/11) v Ipourgos Oikonomias kai Oikonomikon Ipourgos Politismou: requests for a preliminary ruling from the Simvoulio tis Epikratias, joined Cases C‑186/11 and C‑209/11, published 24 January 2013, accessed 7 July 2022
  35. ^ European Court of Justice, Judgment of the Court (First Chamber) of 29 November 2007: Commission of the European Communities v Republic of Austria. Regulation (EEC) No 2092/91 – Organic production of agricultural products – Private inspection bodies – Requirement of an establishment or permanent infrastructure in the Member State where the services are provided – Justifications – Connection with the exercise of official authority – Article 55 EC – Consumer protection
  36. ^ Court of Justice of the European Union, The service provided by Uber connecting individuals with non-professional drivers is covered by services in the field of transport, Press Release No 136/12, published 20 December 2017, accessed 22 April 2022
  37. ^ EUR-Lex, RI.SAN. Srl and Comune di Ischia, Italia Lavoro SpA, formerly GEPI SpA, Ischia Ambiente SpA, Case C-108/98, delivered 9 September 1999, accessed 15 January 2024
  38. ^ Court of Justice of the European Union. "Judgment in Case C-284/16 - Slowakische Republik v Achmea BV" (PDF). Retrieved 6 January 2024.
  39. ^ Marco Gambazzi v DaimlerChrysler Canada Inc. and CIBC Mellon Trust Company, Case C–394/07, Summary, accessed 21 September 2022
  40. ^ EU Pillar, C-381/08 Car Trim GmbH v KeySafety Systems Srl (Fourth Chamber) (2010) ECR I-01255, University of Aberdeen, accessed 10 February 2021
  41. ^ EUR-Lex, Judgment of the Court (Grand Chamber), 29 January 2013. re: Ciprian Vasile Radu, accessed 19 May 2024
  42. ^ European Court of Justice, Case C-513/99 - Concordia Bus Finland Oy Ab, formerly Stagecoach Finland Oy Ab v Helsingin kaupunki and HKL-Bussiliikenne, 17 September 2002, accessed 7 June 2023
  43. ^ a b European Commission, Directorate-General for Employment, Social Affairs and Inclusion and Directorate-General for the Internal Market and Services, Buying Social: A Guide to Taking Account of Social Considerations in Public Procurement, 2010, accessed 6 June 2023. © European Union, 2010: reproduction is authorised provided the source is acknowledged
  44. ^ InfoCuria, Commission of the European Communities v Hellenic Republic, Case C-394/02, published 2 June 2005, accessed 5 October 2022
  45. ^ EUR-Lex, Wasser- und Abwasserzweckverband Gotha und Landkreisgemeinden (WAZV Gotha) v Eurawasser Aufbereitungs- und Entsorgungsgesellschaft mbH. Reference for a preliminary ruling: Thüringer Oberlandesgericht – Germany. Procurement procedures of entities operating in the water, energy, transport and postal services sectors – Public service for the distribution of drinking water and the treatment of sewage – Service concession – Definition – Transfer to the supplier of the risk connected with operating the service in question. Case C-206/08, published 10 September 2009, accessed 23 August 2022
  46. ^ a b Gebroeders Beentjes BV v State of the Netherlands, accessed 29 May 2021
  47. ^ EUR-Lex, Opinion of Mr Advocate General Darmon, paragraph 37, delivered on 4 May 1988, accessed 25 December 2023
  48. ^ Heard, E., Evaluation and the audit trail, Bevan Brittan, published 8 June 2016, accessed 31 December 2023
  49. ^ EUR-Lex, Judgment of the Court, 2 August 1993, in Case C-107/92, accessed 8 March 2021
  50. ^ EUR-Lex, Gestión Hotelera Internacional SA and Comunidad Autónoma de Cananas, Ayuntamiento de Las Palmas de Gran Canaria and Gran Casino de Las Palmas SA, published 19 April 1994, accessed 3 November 2023
  51. ^ European Court of Justice, Commission of the European Communities v Kingdom of Belgium: Judgment of the Court, Case C-87/94, 25 April 1996, accessed 28 January 2021
  52. ^ InfoCuria, C-225/98 – Commission v France, Judgment of the Court of 26 September 2000, accessed 13 June 2022
  53. ^ EUR-Lex, Council Directive 93/37/EEC of 14 June 1993 concerning the coordination of procedures for the award of public works contracts, accessed 19 February 2021   Text was copied from this source, which is available under a Creative Commons Attribution 4.0 International License.
  54. ^ InfoCuria, Commission of the European Communities v French Republic, delivered 1 February 2001, accessed 19 February 2021
  55. ^ a b European Court of Justice, Universale-Bau AG, delivered 12 December 2012, accessed 8 May 2024, and quoted in Northern Ireland Court of Appeal, McLaughlin & Harvey Ltd v Department of Finance & Personnel [2011] NICA 60, paragraph 12, delivered 26 September 2011, accessed 8 May 2024
  56. ^ EUR-Lex, EVN AG and Wienstrom GmbH v Republik Österreich, judgment of the Court (Sixth Chamber), 4 December 2003, paragraph 15, accessed 6 June 2023
  57. ^ "Whether a National Limitation Period for Procurement Actions may be Overriden: A Note on Case C-327/00, Santex v Unita Socio Sanitaria Locale n.42 di Pavia", Public Procurement Law Review, [2003] 12 (4)
  58. ^ Court of First Instance (First Chamber), Tideland Signal Ltd v. European Commission, Case T-211/02, published 27 September 2002, accessed 2 October 2023
  59. ^ Taylor, S., Judgment was handed down on 31 October 2017 by Mr Justice Coulson in R (Hersi & Co Solicitors) v The Lord Chancellor (as successor to the Legal Services Commission), Keating Chambers, published 8 July 2017, accessed 2 October 2023
  60. ^ La Cascina Soc. coop, arl, and others v. Ministero della Difesa and Others, 9 February 2006, accessed 12 May 2023
  61. ^ European Court of Justice, C-331/04 - ATI EAC and Others, delivered 24 November 2005, accessed 24 May 2024
  62. ^ European Court of Justice, Case C‑444/06, Commission v. Kingdom of Spain, published 3 April 2008, accessed 31 October 2022
  63. ^ InfoCuria, Varec SA v État belge, accessed 18 November 2022
  64. ^ European Court of Justice, pressetext Nachrichtenagentur GmbH v Republik Österreich (Bund), APA-OTS Originaltext-Service GmbH and APA Austria Presse Agentur registrierte Genossenschaft mit beschränkter Haftung, Case C-454/06, delivered on 19 June 2008, accessed 9 January 2024
  65. ^ Office of Government Commerce, Requirement to distinguish between "selection" and "award stages of a public procurement, and to give suppliers complete information about the criteria used in both stages, Action Note 04/09, published 29 April 2009, accessed 23 September 2023
  66. ^ England and Wales High Court (Technology and Construction Court), AG Quidnet Hounslow LLP v London Borough of Hounslow [2012] EWHC 2639, paragraph 63, delivered 28 September 2012, accessed 26 July 2023
  67. ^ InfoCuria, Assitur Srl v Camera di Commercio, Industria, Artigianato e Agricoltura di Milano, judgment given 19 May 2009, accessed 5 October 2023
  68. ^ Office of Government Commerce, Procurement Policy Note – Time Limits for Challenges under the Public Procurement Regulations. Action Note 03/10 22 February 2010, accessed 9 August 2023
  69. ^ InfoCuria, Action brought on 20 October 2008 - Commission of the European Communities v Ireland (Case C-456/08), published 6 December 2008, accessed 19 March 2023
  70. ^ Crossen, K. and Gunn, D., Order 84A of the Rules of the Superior Courts, Mondaq Ltd., published 6 January 2011, accessed 19 March 2023
  71. ^ European Court of Justice, A contracting authority in a tendering procedure must seek explanations from a tenderer in the case where the tender appears to contain an abnormally low price, Press Release 39/12, 29 March 2021, accessed 9 December 2022
  72. ^ a b Court of Justice of the European Communities, Econord SpA v Comune di Cagno (C-182/11) (2012) EUECJ C-182/11 (29 November 2012), accessed 11 June 2021
  73. ^ Case C-94/12, Swm Costruzioni 2 SpA and Mannocchi Luigino DI v Provincia di Fermo, InfoCuria, paragraph 39, accessed 24 July 2023
  74. ^ European Court of Justice, Case C-552/13, Grupo Hospitalario Quirón SA v Departamento de Sanidad del Gobierno Vasco and Instituto de Religiosas Siervas de Jesús de la Caridad, published 22 October 2015, accessed 10 March 2021
  75. ^ Smith, R., Specifying location requirements, Local Government Lawyer, published 19 November 2015, accessed 18 March 2021
  76. ^ Strada Lex, General Court of the European Union - Order of March, 11 2013 in the case no T-4/13 (ECLI:EU:T:2013:121), accessed 24 December 2022
  77. ^ C-413/17 – Roche Lietuva, 25 October 2018, accessed 5 March 2021
  78. ^ Case C-149/77, Gabriellc Defrenne v Société Anonyme Belge de Navigation Aérienne Sabena, 15 June 1978, accessed 28 January 2021
  79. ^ Case C-549/13 Bundesdruckerei GmbH v. Stadt Dortmund, 18 September 2014, accessed 28 January 2021
  80. ^ C-97/90 – Lennartz v Finanzamt München III, published 11 July 1991, accessed 26 March 2021
  81. ^   This article incorporates text published under the British Open Government Licence: HMRC, Advice on applying supply chain due diligence principles to assure your labour supply chains, updated 31 December 2020, accessed 16 March 2021
  82. ^ HMRC, Revenue and Customs Brief 2 (2015): VAT grouping rules and the Skandia judgment, published 10 February 2015, accessed 5 December 2023
  83. ^   This article incorporates text published under the British Open Government Licence: HMRC, Revenue and Customs Brief 2 (2015): VAT grouping rules and the Skandia judgment, published 10 February 2015, accessed 25 March 2023
  84. ^ a b Simpson, P., VAT Groups: recent cases and proposals for reform, Old Square Tax Chambers, section 7, 1 March 2016, archived 3 February 2021, accessed 11 November 2022
  85. ^ Official list of 57 cases on curia.europa.eu

References

edit
edit