MIA station, also known as MIA Road station,[1] is an under-construction Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system in Parañaque. It is a part of the LRT-1 South Extension Project. Situated at the intersection of Roxas Boulevard and Seaside Drive, it serves Barangay Tambo and Entertainment City.

MIA
Manila Light Rail Transit System
Construction of MIA station in April 2023
General information
Other namesMIA Road
LocationRoxas Boulevard cor. NAIA Road
Tambo, Parañaque
Coordinates14°31′06″N 120°59′35″E / 14.51843°N 120.99299°E / 14.51843; 120.99299
Owned byLight Rail Transit Authority
Line(s)Line 1
Platforms2 (2 side)
Tracks2
Construction
Structure typeElevated
Other information
StatusUnder construction
History
OpeningOctober 2024
Services
Preceding station LRTA_Logo
Manila LRT
Following station
Redemptorist LRT Line 1 Asia World
towards Niog

Name

edit

MIA is the abbreviation for the former name of Ninoy Aquino International Airport (NAIA), which was Manila International Airport, opened in 1948, two years after independence from the United States. Following the government's renaming of MIA as NAIA in 1987, the adjacent road that was previously named the same became NAIA Road between Roxas Boulevard and the terminals.

History

edit

MIA station was first planned as part of the Line 1 South Extension plan, which calls for a mostly elevated extension of approximately 11.7 kilometers (7.3 mi). The extension will have 8 passenger stations with an option for 2 future stations (Manuyo Uno and Talaba).[2] The project was first approved on August 25, 2000, and the implementing agreement for the project was approved on January 22, 2002.[3] However, construction for the extension was repeatedly delayed until the project was shelved years later.

The plans for the southern extension project were restarted as early as 2012 during the second Aquino administration and was expected to begin construction in 2014, but was delayed due to right-of-way issues. The issues were resolved in 2016 and the project broke ground on May 4, 2017.[4] Meanwhile, construction works on the south extension began on May 7, 2019, after the right-of-way acquisitions were cleared.[3]

As of 30 April 2024, the phase 1 is 98.2% complete.The Phase 1 of the extension from Redemptorist station to Dr. Santos station) is slated to be operational by October 2024, with full operations by 2031.

See also

edit

References

edit
  1. ^ Uson, Melanie (August 12, 2024). "LOOK: Upcoming railway system to connect seven train lines in Greater Manila Area". l!fe · The Philippine Star. Archived from the original on August 13, 2024. Retrieved August 13, 2024.
  2. ^ "Project Update: The Line 1 South Extension Project". Light Rail Transit Authority. Archived from the original on April 30, 2006. Retrieved August 9, 2021.
  3. ^ a b Orellana, Faye (May 7, 2019). "Construction of LRT-1 Cavite extension begins". Philippine Daily Inquirer. Archived from the original on July 20, 2021. Retrieved August 9, 2021.
  4. ^ "LRMC breaks ground on LRT-1 Cavite Extension project". Light Rail Manila Corporation. May 4, 2017. Archived from the original on August 9, 2021. Retrieved August 9, 2021.
edit