Melbourne–Adelaide rail corridor

The Melbourne–Adelaide rail corridor consists of the 828-kilometre (514-mile) long 1435 mm (4 ft 8+12 in) standard-gauge main line between the Australian state capitals of Melbourne, Victoria and Adelaide, South Australia, and the lines immediately connected to it.[1] Most of its traffic is freight; the only passenger train along the entire route is the twice-weekly passenger service The Overland, operated by Journey Beyond.

Melbourne–Adelaide rail corridor
Overview
LocaleVictoria and South Australia
PredecessorVictorian Railways and South Australian Railways
Technical
Track gauge1435 mm (4 ft 8+12 in) standard gauge since 1995
Previous gauge1600 mm (5 ft 3 in) from 1887 to 1995
Route map

Adelaide
Melbourne

History

edit

From the 1850s, the Victorian Railways and South Australian Railways 1600 mm (5 ft 3 in) broad-gauge networks were established and expanded. The South Australian main line – the Adelaide-Wolseley line – was connected to the Victorian system at Serviceton in 1887. This was the first single-gauge link between two Australian colonies;[2] other connections were only constructed after another 50 years because of the failure of the colonies (later, states) to agree on a uniform gauge.

Conversion to standard gauge and rerouting

edit

In 1983, studies by the Victorian Railways and Australian National Railways Commission indicated that about $400 million would be required to construct a standard-gauge link between Melbourne and Adelaide. Various routes were considered, including via Pinnaroo, Ouyen and Maryborough, and the existing route via Ballarat, Ararat, Horsham, Bordertown and Murray Bridge.[3] The route eventually chosen avoided the steep grades of the Ballarat line by going via North Shore[4][5] (near North Geelong) and Cressy, joining the old route at Ararat to continue to Adelaide.[6] The line was converted to standard gauge in 1995 under a federal infrastructure program.[7]

Track and gauge

edit

The line is single track for the entire route with the exception of a short dual-gauge section near Melbourne and a number of 1500–1600 metres (4900–5200 feet) passing loops every 15–45 kilometres (9.3–28.0 miles). Some branch lines were also converted to standard gauge.

References

edit
  1. ^ "AusLink Network Corridors". auslink.gov.au. Archived from the original on 19 July 2008. Retrieved 29 March 2008.
  2. ^ "ARHS Railway Museum: History 1839 – 1900". railwaymuseum.org.au. Archived from the original on 29 September 2009. Retrieved 29 March 2008.
  3. ^ "General News". Newsrail. Australian Railway Historical Society. February 1983. p. 19.
  4. ^ "Geelong standard gauge platform opens, Overland accelerated but stations bypassed" Railway Digest July 1999 page 17
  5. ^ "North Geelong" (Map). Google Maps. Retrieved 11 September 2023.
  6. ^ "The Overland". Australian Rail Maps. April 2023. Retrieved 11 September 2023.
  7. ^ "ARHS Railway Museum: History 1950 – now". railwaymuseum.org.au. Archived from the original on 8 February 2007. Retrieved 29 March 2008.

Sources

edit
  • Avery, Rod (2006). Freight Across the Nation: The Australian Superfreighter Experience. Brisbane: Copyright Publishing Co. ISBN 1876344474.

36°22′26″S 140°57′54″E / 36.373951°S 140.965087°E / -36.373951; 140.965087