Connecticut Route 25

(Redirected from Newtown-Bridgeport Way)

Route 25 is a 28.59-mile (46.01 km), primary state highway connecting the city of Bridgeport and the town of Brookfield in the U.S. state of Connecticut. Route 25 is a six-lane freeway from Bridgeport to northern Trumbull and a two-lane surface road the rest of the way to Brookfield.

Route 25 marker
Route 25
Map
Map of Fairfield County in southeastern Connecticut with Route 25 highlighted in red
Route information
Maintained by CTDOT
Length28.59 mi (46.01 km)
Existed1932[1]–present
Major junctions
South end I-95 in Bridgeport
Major intersections Route 8 in Bridgeport
Route 15 / Merritt Parkway / Route 127 in Trumbull
I-84 in Newtown
North end US 202 in Brookfield
Location
CountryUnited States
StateConnecticut
CountiesFairfield
Highway system
  • Connecticut State Highway System
Route 22 Route 27

Route 25 was originally laid out as a toll road known as the Bridgeport and Newtown Turnpike in 1801. The Route 25 designation was assigned in 1932 to the turnpike alignment and additionally extended through New Milford all the way to Torrington. The route was cut back to its modern northern terminus in Brookfield in 1974, with U.S. Route 202 taking over the old alignment. The Bridgeport-Newtown corridor had been planned as an freeway since the 1950s. The modern Route 25 freeway was fully open by 1982.

Route description

edit

Route 25 begins at an interchange with Interstate 95 in Bridgeport. For the first 3.8 miles (6.1 km) of the route, it is co-signed with the Route 8 freeway. After the split with Route 8, it continues as its own freeway through the town of Trumbull for another 6.1 miles (9.8 km), providing partial access to the Merritt Parkway (Route 15) along its path through the town. The freeway section ends at the junction with Route 111 on the northern edge of town.

 
Signage for Route 25 southbound at exit 9 in Trumbull

Route 25 continues northward as a surface road following Main Street into Monroe, where it intersects with the northern end of Route 59 in the village of Stepney. Upon entering Newtown, the road becomes known as South Main Street. After intersecting the eastern end of Route 302, it overlaps for 2.7-mile (4.3 km) with U.S. Route 6 northwest from the town center. After turning north onto Hawleyville Road, it intersects I-84 at Exit 9. For the rest of its length, Route 25 is a secondary minor arterial road, crossing Route 133, and ending at U.S. Route 202 in Brookfield.[2]

History

edit

Route 25 was originally laid out as a toll road known as the Bridgeport and Newtown Turnpike in 1801 and ran from Bridgeport via Newtown borough to Brookfield Center. In 1848, the north and south ends were made free. In the south, tolls were no longer collected within the city limits of Bridgeport, and in the north, the road north of Newtown borough was made free. In 1886, Fairfield County dissolved all turnpike corporations in its jurisdiction, causing the Bridgeport and Newtown Turnpike to become a public road.

Route 25 was designated along the old turnpike route in the 1932 state highway renumbering.[1] When originally designated in 1932, Route 25 continued well beyond Brookfield, following Route 133 and Route 67 to New Milford (via Bridgewater), then turning northeast along modern Route 202 before terminating at Route 8 in Torrington. In April 1943, a portion of Routes 25 and 133 swapped alignments. Route 25 now connected to U.S. Route 7 in Brookfield and overlapped it to New Milford, bypassing Bridgewater.[3] In 1963, Route 25 was extended further eastward to Route 44 in Canton after the relocation of Route 4. In 1974, U.S. Route 202 was relocated and the portion of Route 25 from Brookfield to Canton was taken over by US 202. Route 25 was truncated to its present terminus in Brookfield at this time.[4]

Freeway relocation

edit

Before the last segment of the Route 25 Expressway opened in 1982, Route 25 originally followed Main Street through Bridgeport northward to the present-day freeway terminus. The old Route 25 through Bridgeport became an extension of Route 111 when the freeway opened.

The Route 25 freeway was originally planned to continue north to meet I-84 in Newtown, where a semi-directional interchange and freeway stub for the planned freeway connection was built. The planned 9-mile (14 km) extension was canceled in 1991, along with many other highway projects due to a fiscal crisis arising when Connecticut was especially hit hard by the Late 1980s recession. At that time Connecticut's economy was heavily reliant on the defense industry. The end of the Cold War combined with the recession resulted in a near-total collapse of Connecticut's industrial base, and a loss of billions of dollars in tax revenues generated by these industries.[4]

During the late 1990s, an alternative plan to widen the existing Route 25 to 4 lanes with a center turn lane in certain spots through Trumbull, Monroe, and Newtown was met with opposition, particularly in Newtown where there was strong opposition to any type of project that will change the existing profile of the Route 25 corridor, despite the high accident rate and congestion on the road. In the early 2000s the Connecticut Department of Transportation (ConnDOT) was forced to resort to a plan that will widen and improve intersections on Route 25 from the freeway terminus in Trumbull to the Monroe/Newtown town line, but opposition in Newtown has compelled ConnDOT to limit upgrades in that community to spot improvements at major intersections and routine maintenance and periodic rehabilitation or replacement of existing bridges and culverts without adding capacity to the road. To ease traffic congestion in Newtown, ConnDOT opened the Mile Hill Road Bypass (SR 860), cutting through the former Fairfield Hills Hospital property and connecting to I-84 and Route 34 at the freeway stub originally intended for Route 25 (now part of SSR 490). Under the belief an freeway will never be built along Route 25 or Route 34, ConnDOT plans to remove this freeway stub and the high-speed interchange, replacing it with a diamond interchange within the next 10 years. ConnDOT is also planning to build a rest area on land left over when the interchange conversion is complete.[4]

Junction list

edit

Exit numbers were converted from sequential to mile-based in September 2024. The entire route is in Fairfield County.

LocationmikmOld exitNew exitDestinationsNotes
Bridgeport0.00–
0.21
0.00–
0.34
1  I-95 – New Haven, New York City
 
 
Route 8 begins
Southern terminus; signed as exits 1A (north) and 1B (south); exit 27A on I-95
0.400.6411CProspect Street / Myrtle AvenueSouthbound exit and northbound entrance
0.801.2921D  Route 130 (Fairfield Avenue)Southbound exit and northbound entrance
1Golden Hill Street / Main StreetNorthbound exit and southbound entrance
1.442.323
4
2AMain Street / Washington AvenueSouthbound exit and northbound entrance
2.213.56  US 1 / Lindley StreetNorthbound exit and southbound entrance; US 1 not signed
2.804.5152B  US 1 (Boston Avenue / North Avenue)Access via Chopsey Hill Road
3.756.0463 
 
 
 
 
Route 8 north to Route 15 north (Merritt Parkway) – Waterbury, New Haven
Northern terminus of Route 8 concurrency; northbound exit and southbound entrance
Trumbull4.036.4964  Route 127 (White Plains Road) / Old Town RoadSouthbound exit and northbound entrance
5.128.247
8
5 
 
 
 
  Route 15 south / Merritt Parkway south / Route 127 / White Plains Road – New York City
Northbound exit and southbound entrance; exit 31 on Merritt Parkway
   Route 15 / Merritt Parkway – Hartford, New York CitySouthbound exit and northbound entrance; exit 32A on Merritt Parkway
6.4810.4396Daniels Farm Road – TrumbullTrumbull not signed northbound
9.8715.88Northern end of freeway section
  Route 111 – Trumbull, Monroe
Monroe12.8720.71 
 
Route 59 south – Easton
Northern terminus of Route 59
Town of Newtown19.1030.74 
 
 
 
To I-84 (US 6) / Route 34
Access via SR 860
Borough of Newtown19.7931.85 
 
Route 302 west – Bethel
Eastern terminus of Route 302
20.1632.44 
 
 
 
US 6 east to I-84 – Sandy Hook, Waterbury
Southern terminus of US 6 concurrency
Town of Newtown22.8636.79 
 
US 6 west – Danbury
Northern terminus of US 6 concurrency
23.2737.45  I-84 – Waterbury, DanburyExit 9 on I-84
Brookfield26.8943.28  Route 133 – Bridgewater
28.5946.01  US 202 – Danbury, New MilfordNorthern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

edit
  1. ^ a b "Road Conditions in Connecticut". The Hartford Daily Courant. May 27, 1932. p. 14. Retrieved December 24, 2019 – via Newspapers.com.  
  2. ^ State of Connecticut (2006). "Connecticut Route log" (PDF). State of Connecticut. Archived from the original (PDF) on September 5, 2015. Retrieved March 16, 2008.
  3. ^ "Route Numbers on Three Highways Reassigned". The Hartford Courant. April 29, 1943. p. 13. Retrieved May 2, 2018 – via Newspapers.com.  
  4. ^ a b c Scott Oglesby (2005). "Connecticut Route 25". Connecticut Roads. Kurumi. Retrieved March 16, 2008.
edit
KML is from Wikidata