Ontario Highway 427

(Redirected from ON 427)

King's Highway 427 (pronounced "four twenty-seven"), also known as Highway 427 and colloquially as the 427, is a 400-series highway in the Canadian province of Ontario that runs from the Queen Elizabeth Way (QEW) and Gardiner Expressway in Toronto to Major Mackenzie Drive (York Regional Road 25) in Vaughan. It is Ontario's second busiest freeway by volume and the third busiest in North America, behind Highway 401 and Interstate 405 in California.[2][3] Like Highway 401, a portion of the route is divided into a collector-express system with twelve to fourteen continuous lanes. Notable about Highway 427 are its several multi-level interchanges; the junctions with the QEW/Gardiner Expressway and Highway 401 are two of the largest interchanges in Ontario and were constructed between 1967 and 1971, while the interchanges with Highway 409 and Highway 407 were completed in 1992 and 1995, respectively.

Highway 427 marker
Highway 427
Map
Highway 427 highlighted in red
Route information
Maintained by Ministry of Transportation of Ontario
Length27 km (17 mi)
ExistedDecember 4, 1971[1]–present
Major junctions
South end  Queen Elizabeth Way / Gardiner ExpresswayToronto
Continues as Browns Line; however, according to the King's Highway Website, the south end is Evans Avenue.
Major intersections Highway 401Toronto
 Highway 409 – Toronto/Mississauga
 407 ETRVaughan
North end Regional Road 25 (Major Mackenzie Drive) – Vaughan
Location
CountryCanada
ProvinceOntario
Highway system
Highway 420 Queen Elizabeth Way

Highway 427 is one of two complete north-south freeways in Toronto, the only other one being Highway 404/Don Valley Parkway serving North York and Scarborough. Highway 427 serves as a major traffic route for the western portion of Toronto (Etobicoke), the northeastern portion of Mississauga (Malton), the southeastern portion of Brampton (Claireville), and the western portion of Vaughan (Woodbridge). The section of Highway 427 between Highway 401 and Dundas Street is a heavily traversed transit corridor; the 1.61-kilometre (1.00 mi) stretch between Burnhamthorpe and Rathburn saw an average of over 400,000 vehicles and over 5,000 buses per day in 2016, including express buses from GO Transit, MiWay, and the Toronto Transit Commission (TTC).[4] The freeway is also the main feeder to Toronto Pearson International Airport from the north and south, as a considerable amount of traffic from Highway 401 (eastbound), the QEW/Gardiner Expressway, and Highway 407 make use of the route for airport access.

First designated in 1972, Highway 427 assumed the recently completed 12-lane collector-express freeway of Highway 27, as well as a short freeway north of Highway 401 known as the Airport Expressway. Both routes were upgraded throughout the 1950s and 1960s, eventually becoming intertwined into the present configuration in 1972. The freeway was extended north from Pearson Airport to Highway 7 over the following twenty years. Construction of an extension north to York Regional Road 25 (Major Mackenzie Drive) began in 2017 and was opened on September 18, 2021.

Route description

edit
 
Highway 427 begins at a complicated interchange with the Queen Elizabeth Way (QEW) and Gardiner Expressway

Highway 427 is the second-busiest freeway in Canada with an average of 300,000 vehicles that use it between the QEW and Highway 401 per day. The section between Burnhamthorpe Road and Rathburn Road has an annual average daily traffic (AADT) count of 353,100. The route was 19.9 km (12.4 mi) long from 1991 until 2021, with the latest extension bringing it to approximately 27 km.[2]

At its southern terminus, the route begins at Coules Court, where it continues as Brown's Line, once the southernmost stretch of Highway 27.[2] Alderwood Plaza, located on the east side of the route, has a parking lot which provides access to the highway; this is the only at-grade access along the length of the route.[5] The four-lane road splits into a divided highway and descends below Evans Avenue. The highway weaves through a complicated interchange, providing northbound access to Evans Avenue and the Gardiner Expressway, and southbound access to The Queensway, QEW/Gardiner Expressway, and Evans Avenue. North of the interchange, the lanes from Brown's Line diverge and form the collector lanes of a collector-express system. Flyover ramps to and from the QEW/Gardiner pass over the southbound lanes and converge to form the express lanes. This collector-express system serves to divide local traffic from freeway-to-freeway traffic; the express lanes provide access between the QEW/Gardiner Expressway and Highway 401, while the collector lanes provide local access between those interchanges.[6]

 
South of Eglinton Avenue, Highway 427's northbound and southbound express lanes split to interchange with Highway 401, while the collector lanes split off to become Highway 27

After crossing Canadian Pacific Railway (CPR) tracks, the freeway interchanges with Dundas Street (former Highway 5). A set of criss-crossing ramps provide access between the collector and express lanes north of this point,[6] referred to as "The Basketweave", with the northbound express-to-collector transfer also having an offramp to Dundas Street. North of Dundas, the highway has a northbound right-in/right-out (RIRO) interchange with Gibbs Road, the first of several that provide collector lane access to minor streets that mostly connect to The East Mall and The West Mall, which run parallel with the collector-express section of the freeway. The highway passes beneath Bloor Street but has no interchange with it.[5] A full interchange is provided shortly after with Burnhamthorpe Road, southwest of Burnhamthorpe Collegiate Institute. Across from the school, another RIRO provides access from the southbound lanes to Holiday Drive and The West Mall. Following the off-ramp, to the north, is a half-cloverleaf interchange with Rathburn Road, which provides access from the northbound lanes and to the southbound lanes.[6]

 
Highway 427 looking south from Langstaff Road

Transfers provide a second and final opportunity to cross between the express and collector lanes, or vice versa, south of the complicated 1.56-square-kilometre (0.60 sq mi) Highway 401 interchange. A final RIRO provides southbound access to and from Eringate Drive, after which the collector lanes diverge, and the express lanes cross the southbound collectors. The collector lanes cross Eglinton Avenue at a half-cloverleaf interchange and then dives under Highway 401 while transitioning into Highway 27, while the express lanes interchange with Highway 401 and continue the route of Highway 427. The Highway 427 express lanes and ramps connecting to Highway 401 are constructed around the Richview Memorial Cemetery.[6][7] Highway 427 passes through the sprawling Highway 401 interchange and becomes displaced approximately 1 km (0.62 mi) to the west. There are no ramps to provide access from southbound Highway 427 to eastbound Highway 401 and vice versa, as this connection is handled by Highway 409.[5] Highway 427 crosses Renforth Drive and then curves to the east of Runway 24R and 24L of Toronto Pearson International Airport.[8] Shortly thereafter, it crosses and interchanges with Dixon Road and Airport Road, between which it forms the demarcation line.[6] Several ramps diverge at this point to provide access to Pearson Airport, and the freeway narrows to eight lanes.[5]

From here to just south of Finch Avenue, the freeway follows the boundary line between Toronto and Mississauga.[6] It encounters the third multi-level junction along its length, with Highway 409, which provides access to the airport as well as the southbound to eastbound movement that cannot be performed at the interchange with Highway 401 to the south.[5] Highway 427 continues straight north and narrows again to six lanes.[5] After crossing the Kitchener GO line, it passes west of Woodbine Racetrack and interchanges with Rexdale Boulevard/Derry Road and Finch Avenue. The freeway bends slightly eastward, diverging from the Toronto/Mississauga boundary to briefly run exclusively through Toronto again. It crosses the West Humber River where it drains from the Claireville Reservoir.[6] The highway crosses Steeles Avenue and enters Vaughan, as it approaches a fourth and final sprawling interchange with Highway 407.[5] It then interchanges with Highway 7 (York Regional Road 7), Langstaff Road (Regional Road 72), Rutherford Road (Regional Road 73), and ends at a trumpet interchange with Major MacKenzie Drive (Regional Road 25), with the northbound exit ramp defaulting into Garnet Williams Way, a local side street.

 
Highway 427 and Highway 409 interchange as seen from the Network Road overpass

History

edit

QEW to Highway 401 (1953–1956)

edit

Although Highway 427 was not officially designated until 1972,[9] several sections of freeway were already in place prior to that date. The designation was applied following the completion of the interchanges at the QEW and Highway 401 as well as the expansion of the section between them into a collector-express system.[1]

Highway 27 was designated as a two-lane road travelling north from Highway 2 (Lake Shore Boulevard) towards Barrie. As Toronto grew outwards following the annexation of various municipalities, the Ontario Department of Highways (DHO) began planning for a bypass of the city, aptly named the Toronto Bypass. A significant portion of this bypass was designed to be incorporated into the Transprovincial Highway, now Highway 401. The remainder was designed to follow the existing right-of-way of Highway 27 between the QEW and Richview Sideroad (now Eglinton Avenue).[10]

 
An aerial view, facing north, of the reconstruction of Highway 27 to a four-lane freeway during the early 1950s, including a cloverleaf interchange with the QEW.

Construction of the Toronto Bypass began near Yonge Street in 1949 (along present-day Highway 401) and on the four-laning of Highway 27 in 1953.[11][12] The Highway 27 work involved the construction of two interchanges: a three-way interchange at Highway 401 and a large cloverleaf at the QEW, the latter of which would become one of the worst bottlenecks in the province a decade after its completion, according to Minister of Transportation Charles MacNaughton.[13] By September 1956, it was possible to bypass Toronto entirely on the four lane divided highway composed of Highway 401 and Highway 27.[14][15] Highway 401 was extended to the west soon after,[16] but Highway 27 remained a two-lane highway north of it.[17]

 
Completed grading on the reconstruction of Highway 27 in 1954; the Highway 401 overpass is visible in the background

Airport Expressway (1964–1971)

edit
 
An aerial photograph of the Airport Expressway in 1964

During the early 1960s, Toronto International Airport was expanded with the construction of the Aeroquay One terminal.[18] To serve the expected demand of the airport expansion, the DHO built a new four-lane freeway known as the Toronto Airport Expressway which opened on January 3, 1964. This new route ran north from Highway 401 at Renforth Drive to Dixon/Airport Roads (roughly followed the same alignment as today's Highway 427) where it tied in with and downgraded into Indian Line. The Airport Expressway featured a connection with the western terminus of Richview Sideroad at the southern end of the interchange with Highway 401 as well as an interchange with Renforth Drive.[19] On Highway 401 the Airport Expressway interchange was located 1 km (0.62 mi) to the west on the existing interchange with Highway 27.[20][19][21]

Expansion (1963–1971)

edit

In 1963, MacNaughton announced that Highway 401 would be widened from a four-lane highway to a collector-express system, modeled after the Dan Ryan Expressway in Chicago.[15] Plans were soon developed to apply this model to the QEW between Highway 27 and Royal York Road and to Highway 27 between the QEW and Highway 401, and were unveiled to Etobicoke council on October 13, 1966.[22] Design work followed and was completed by May 1967.[23] The widening of Highway 27 required the demolition and rebuilding of overpasses at Bloor Street, Burnhamthorpe Road, and Rathburn Road constructed just over a decade earlier.[23] The rest of the route was rebuilt by September 1968, the next stage involved the reconstruction of the interchanges with QEW and Highway 401 which were reconfigured into complicated multi-level interchanges to permit free-flow movement.[24][1][25]

Replacing a cloverleaf, the new interchange with the QEW was built over 48.5 ha (120 acres) and required the construction of 19 bridges and the equivalent of 42 km (26 mi) of two-lane roadway. The project involved the temporary diversion of QEW traffic to an overpass that would eventually be used for The Queensway. Construction began in September 1968,[24] although preliminary work had been ongoing since 1966;[26] the interchange opened to traffic on November 14, 1969.

 
A diagram superimposing the old Airport Expressway and the current Highway 401–427 interchange

The existing Airport Expressway was removed in its entirety, as the DHO deemed it insufficient for future expansion beyond an airport access road, but its replacement in the form of the Highway 427 extension (also known as the Airport Expressway until 1980) still followed roughly the same alignment. Like the former Airport Expressway, the extension included direct access to the airport and Dixon/Airport Roads, north of which at a temporary terminus it defaulted to Indian Line. [23][27]

Highway 401's new junction with Highway 27 remains the largest interchange in Canada as it sprawls over 156 ha (385 acres) and required the construction of 28 bridges and the equivalent of 46.6 km (29 mi) of two-lane roadway, being built around the existing Richview Memorial Cemetery. On Highway 401 this required the removal of the existing interchange with Highway 27 as well as the half-cloverleaf interchange with the Airport Expressway which was 1 km (0.62 mi) to the west as both were originally conceived as separate routes. These two interchanges were replaced with a single large junction, where north of Highway 401 the collector lanes would continue the Highway 27 routing while the express lanes would shift westward to meet the rebuilt Airport Expressway. The reconstructed interchange also including connections to Eglinton Avenue (ultimately meant for the proposed but never-built municipal Richview Expressway) from all directions except for Highway 401 east of that interchange, while Carlingview Drive received ramps to Highway 401 east of that interchange.[28] While the new interchange with the QEW was opened to traffic on November 14, 1969,[29] the more complex Highway 401 junction required several more years of construction staging, fully opening on December 4, 1971 (though portions were opened in the weeks prior to that). On that same date, Highway 427 was inaugurated as it assumed the collector-express portion of Highway 27 and the new Airport Expressway. North of Highway 401, while the existing Highway 27 remained a provincial route as it transitioned from an expressway to an arterial road, the parallel section of Highway 427 effectively served as a freeway bypass.

Extensions beyond Highway 401 (1976–1994)

edit

At the recently-opened interchange between Highway 401 and Highway 427, the off-ramp from westbound Highway 401 to Carlingview Drive was temporarily signed as "Airport Expressway", since Carlingview Drive had a temporary on-ramp to northbound Highway 427 near the Renforth Drive underpass but that on-ramp was closed in the early 1970s. Direct access from westbound Highway 401 to northbound Highway 427 would be restored a few years later once Highway 409 opened, which had greater capacity then the short-lived Carlingview ramps.[23][30]

Ultimately, it was planned to extend Highway 427 north along Indian Line (although a 680 m (2,230 ft) stretch of that road would be retained to maintain access to driveways)[31] to the future Highway 407, where ramps would direct northbound traffic onto Highway 27.[23] An extension north of Dixon/Airport Roads began in 1976 as part of the work to build Highway 409,[32] and it included the construction of the interchange between the two freeways. By the beginning of 1980, this work was completed, and construction was progressing on the section north to Rexdale Boulevard, which opened by the end of the year.[33][34] In 1982, construction began on the next section of Highway 427, which would extend it to just north of the West Humber River, afterwards the freeway would narrow to two lanes and continue on as Indian Line until an intersection with Albion Road (Highway 50).[35] This project included an interchange with the extension of Finch Avenue west from Humberline Drive to Steeles Avenue and was completed in late 1984.[36]

Highway 427 was extended north to Highway 7 in Vaughan beginning with the construction of the interchange between the two in 1988. The extension followed a new alignment since this has sufficient right-of-way for future expansion and a junction with the initial phase of Highway 407, as opposed to upgrading Indian Line and incorporating it into the freeway.[37] The extension was opened in late 1991, with the Highway 7 interchange only half-completed since the freeway would not be extended further north until 2021. Access to Indian Line from Albion Road (Highway 50) was then closed off to vehicular traffic. [38]

 
The junction of Highways 427 and 409 in 1989, featuring an at-grade signalized intersection to allow traffic on southbound Highway 427 to access eastbound Highway 409. A flyover ramp replaced this intersection in 1992.

The final at-grade intersections were removed in the early 1990s, the first being the signalized left turn from the southbound lanes with eastbound Highway 409 which was replaced by a flyover ramp in 1992, and the second being at Morning Star Drive where an overpass was constructed in 1994 to extend the street across the freeway to Humberwood Boulevard, making Highway 427 a fully controlled-access freeway for its entire length.[39]

Work on the interchange with Highway 407 proceeded in stages, starting with the underpasses for Highway 407 as well as the fourth-level flyover ramp from westbound Highway 407 to Highway 427 southbound by 1991, following by the third-level flyover ramp from Highway 427 northbound to Highway 407 westbound, and the interchange was finally put into service when Highway 407 opened in 1997.[40]

Upgrades since 1990s

edit

In 2001-02, modifications were made to the interchange with the QEW and Gardiner Expressway. This included a new loop ramp from the Highway 427 southbound collectors to the Gardiner, aimed at relieving the congestion in the express lanes created by the southbound collector-to-express transfer near Bloor Street, as the collector lanes originally lacked direct access to the Toronto-bound QEW (downloaded from the province in 1998 to become the part of the Gardiner). The Gardiner Expressway also received an off-ramp to Sherway Gardens, which necessitated an underpass to be implemented in the directional ramp from the Highway 427 southbound express to the Hamilton-bound QEW.[41]

 
Highway 427 looking north from Burnhamthorpe Road, showing the newer concrete median barrier and high-mast lighting, with remaining 1970-era guardrail and lighting poles to be replaced.

Arterial extension and widening (2008–2021)

edit
 
Nearly completed Highway 427 widening work as seen from the Morning Star Drive overpass in June 2018

An 800-metre (2,600 ft) four-lane arterial road designated as Regional Road 99 was opened in the autumn of 2008 by York Region. This road unofficially extended Highway 427's northern terminus from Highway 7 to a signalized intersection with Zenway Boulevard, and mainly served to provide improved access to Highway 27 and Highway 50. York Regional Road 99 was permanently closed on August 8, 2020,[42] to make way for the extension of Highway 427 northwards to Major MacKenzie Drive (Regional Road 25), which also involved constructing an overpass for Zenway Boulevard to cross the extended freeway.[43][44]

A section of Highway 427 between Campus Road-Fasken Drive and Highway 7 was expanded to four lanes in each direction.[45] This project included the installation of high-mast lighting, median barriers, and the addition of high-occupancy toll lanes (HOT) in both directions, and was completed in 2021 in conjunction with the Vaughan Extension (see below). One of the challenges during this project was widening the Highway 427 bridges crossing Highway 407 ETR, with the solution being steel box girders added on either side of the existing post-tensioned concrete structures, as opposed to the conventional bridge widening practice of the expansion using a similar construction to the original bridge since post-tensioned concrete additions require falsework which in turn would close down Highway 407 ETR lanes for extended periods.[46] The completed HOT lanes stretch from south of Highway 409 to north of Rutherford Road.[47] In conjunction with the widening work, and in anticipation of the opening of the extension north of Highway 7, exit numbers were added (still ongoing as of late 2021), starting with the northern sections of the highway.

Vaughan Extension (2017–2021)

edit
 
Highway 427 extension under construction looking south from the Zenway Drive overpass (construction detour at bottom) in June 2020. York Regional Road 99, the temporary extension of the highway, is at right.

An environmental assessment was completed on a northward extension of Highway 427 to Major Mackenzie Drive to relieve traffic issues on Regional Road 27 and 50, as well as provide improved access to the Canadian Pacific Intermodal Terminal,[43] with construction beginning in May 2017.[48] The project included HOT lanes as far north as Rutherford Road, and was scheduled to open in 2021, with the HOT lanes opening the following year.[49] However, a pending legal dispute between the provincial government and the constructor delayed the opening of the extension in late April 2021.[50]

The extension was built by Link 427, a consortium of six companies that tendered the winning bid to Infrastructure Ontario,[51] The project was estimated at a cost of $616 million,[52] and included the design, financing, and construction of the extension, as well as its maintenance for thirty years.[53] Construction required the periodic closure of eleven roads, as well as the removal of Regional Road 99. McGillivray Road was realigned at Rutherford Road, as was the intersection of Huntington Road and Major Mackenzie Drive.[52][54] The extension north to Major Mackenzie Drive opened on September 18, 2021, after the legal dispute was settled.[55][56]

Future

edit

There is a planned extension that would see the freeway pushed north to near Bolton to meet the proposed Highway 413, should that highway be constructed.[57] On April 30, 2024, the Ontario provincial government confirmed it will start constructing Ontario Highway 413 in 2025 after coming to an agreement with the Canadian federal government, and Highway 413 would be the proposed northern terminus of Highway 427.[58] The Highway 427 Extension Transportation Needs Assessment Study examined further extensions; connections with the Bradford Bypass freeway, as well as Highway 400 and Highway 11 north of Barrie were considered. In the past decade, there has been little discussion of this highway extension due to concerns with traversing the Oak Ridges Moraine and Minesing Wetlands.[59][60]

Exit list

edit

The following table lists the major junctions along Highway 427, as noted by the Ministry of Transportation of Ontario.[2] 

DivisionLocationkm[2]miExitDestinationsNotes
Toronto0.0–
1.2
0.0–
0.75
Brown's LineHighway 427 southern terminus; continues south as Brown's Line
Evans AvenueSouthern end of collector–express system; no access from Queen Elizabeth Way / Gardiner Expressway
  Queen Elizabeth WayHamilton
  Gardiner ExpresswayDowntown Toronto
No southbound entrance from Queen Elizabeth Way; Queen Elizabeth Way / Gardiner Expressway exit 139
Sherway Gardens Road
The Queensway
No northbound exit; no access to Queen Elizabeth Way from southbound entrance
2.31.4Dundas StreetFormerly Highway 5
3.62.2Gibbs RoadRight-in interchange; northbound entrance only
4Valhalla RoadNorthbound right-out exit only
Eva RoadSouthbound right-in right-out exit and entrance
4.22.6Burnhamthorpe Road
4.72.9Holiday DriveSouthbound right-out exit only
5.23.2Rathburn RoadNorthbound exit and southbound entrance
6.33.9Eringate DriveSouthbound right-in entrance only; southbound exit accessible from Highway 27 and Eglinton Avenue
6.8–
9.0
4.2–
5.6
Eglinton AvenueNo access to Highway 401 east from northbound entrance
Highway 27 northNorthbound exit and southbound entrance
  Highway 401Highway 401 exits 348 (eastbound) and 352 (westbound); no northbound entrance from Highway 401 west; no southbound exit to Highway 401 east
TorontoPeel boundaryTorontoMississauga boundary10.36.4    Regional Road 7 north (Airport Road) / Dixon RoadNorthbound exit and southbound entrance; northbound access to Toronto Pearson International Airport
10.76.6Fasken DriveNorthbound exit only
11.67.213      Highway 409 to Highway 401 eastSouthbound exit to Highway 401 east and northbound entrance from Highway 401 west via Highway 409; southbound access to Toronto Pearson International Airport; no northbound to westbound exit. Former southbound access via traffic signal, replaced by a ramp in 1994.
14.28.815  Regional Road 5 west (Derry Road) / Rexdale Boulevard
15.19.4 Morning Star DriveFormer at-grade intersection; closed in the 1990s after an overpass was constructed (no access)
Toronto16.09.917  Finch AvenueTo Peel Regional Road 2; to Etobicoke General Hospital
YorkVaughan18.311.419  407 ETRToll highway; Highway 407 exit 58
19.912.421  Regional Road 7 (Highway 7) – Brampton, MarkhamFormerly Highway 7; Highway 427 northern terminus from 1991-2021; continued as Regional Road 99 from 2008-2020
20.612.8 Zenway BoulevardFormer at-grade intersection; former Regional Road 99 northern terminus from 2008-2020; replaced with an overpass (no access)
22.013.723  Regional Road 72 (Langstaff Road)
23.914.925  Regional Road 73 (Rutherford Road)
26.316.3  Regional Road 25 (Major Mackenzie Drive)Highway 427 northern terminus
Garnet Williams WayNorthbound exit only
   Highway 413Proposed 3 km extension to future Highway 413[61]
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

edit

References

edit

Sources

edit
  1. ^ a b c "Highway 27 Interchange Fully in Service". The Globe and Mail. Toronto. December 4, 1971. p. 5.
  2. ^ a b c d Ministry of Transportation of Ontario (2010). "Annual Average Daily Traffic (AADT) counts". Government of Ontario. Archived from the original on July 6, 2011. Retrieved June 29, 2015.
  3. ^ Office of Highway Policy Information (July 27, 2010). "Most Travelled Urban Highways Average Annual Daily Traffic (AADT) > 250,000". Federal Highway Administration. Retrieved June 30, 2014.
  4. ^ "Ontario Provincial Highways Traffic Volumes On Demand". www.raqsa.mto.gov.on.ca. Archived from the original on December 17, 2017. Retrieved January 6, 2018.
  5. ^ a b c d e f g "Highway 427 length and route" (Map). Google Maps. Archived from the original on January 16, 2013. Retrieved November 7, 2011.
  6. ^ a b c d e f g MapArt (2011). Golden Horseshoe (Map). Peter Heiler Ltd. pp. 101, 107, 113, 118, 353. § A2–T5, X–Z3. ISBN 978-1-55198-877-1.
  7. ^ Bradburn, Jamie (October 29, 2012). "Toronto Cemetery Sojourns: Richview Memorial Cemetery". Torontoist. Retrieved June 13, 2015.
  8. ^ "Aviation Investigation Report: A01O0299". Greater Toronto Airport Authority. 2001. Appendix A. Retrieved November 7, 2011.
  9. ^ Sewell 2009, p. 70.
  10. ^ "Speed Limit In Ontario Now At 60". The Ottawa Citizen. May 29, 1959. p. 23. Retrieved March 25, 2010.
  11. ^ Sewell 2009, p. 63.
  12. ^ Clarke, W.A (March 31, 1954). "Report of the Chief Engineer". Annual Report (Report). Department of Highways. p. 12.
  13. ^ "Six-Mile Stretch of Highway 27 Will Be Expanded to Six Lanes". The Globe and Mail. Toronto. May 4, 1965. p. 5.
  14. ^ '401' The Macdonald–Cartier Freeway. Ministry of Transportation and Communications. 1972. p. 8.
  15. ^ a b Shragge & Bagnato 1984, p. 94.
  16. ^ Ministry of Transportation and Communications (November 3, 1958). Hwy. 10 to Hwy 27. (Toronto) 6.60. Ministry of Transportation and Communications. pp. 8–9.
  17. ^ Department of Highways (1956). Ontario Road Map (Map). Cartography by C.P. Robins. Government of Ontario. § E30–F33.
  18. ^ Lostracco, Marc (October 12, 2006). "Torontoist Remembers: Aeroquay One". Torontoist. Ink Truck Media. Retrieved January 9, 2012.
  19. ^ a b Annual Report (Report). Department of Highways. March 31, 1964. p. 108.
  20. ^ "Aerial photo of Airport Expressway 1970 showing transition to Indian Line". City of Toronto Archives (via Eloquent Systems Inc.). Retrieved September 2, 2020.
  21. ^ "Chronology". Annual Report (Report). Department of Highways. March 31, 1965. p. 302.
  22. ^ "Chronology". Annual Report (Report). Department of Highways. March 31, 1967. p. 315.
  23. ^ a b c d e Planning Branch (May 1967). Functional Planning Report: Highway 27 Reconstruction from Dundas Street to Rexdale Boulevard and Proposed Belfield Expressway from Islington Avenue to New Highway 27 (Report). Ontario Department of Highways.
  24. ^ a b "Drivers Face Three More Years of QE-27-401 Motoring Misery". The Toronto Star. July 22, 1969. p. 43.
  25. ^ "2 Ramps Opened at 27-401". The Toronto Star. November 24, 1971. p. 1.
  26. ^ "Summary of the Report". Annual Report (Report). Department of Highways. March 31, 1967. p. xvi.
  27. ^ Ministry of Transportation and Communications (1973). Ontario Road Map (Map). Cartography by Photogrammetry Office. Government of Ontario. Metropolitan Toronto inset.
  28. ^ "A New Maze in the Making for Motorists". The Globe and Mail. Toronto. November 20, 1969. p. 43.
  29. ^ "QE and 27 Interchange Opens Friday". The Toronto Star. November 13, 1969. p. 1.
  30. ^ Ministry of Transportation and Communications (1973). Ontario Road Map (Map). Cartography by Photogrammetry Office. Government of Ontario. Metropolitan Toronto inset.
  31. ^ "Remaining section of Indian Line" (Map). Google Maps. Retrieved September 2, 2020.
  32. ^ Construction Program (Report). Ministry of Transportation and Communications. 1976–77. p. XIV.
  33. ^ Construction Program (Report). Ministry of Transportation and Communications. 1980–81. p. XIX.
  34. ^ Ministry of Transportation and Communications (1980–81). Ontario Road Map (Map). Cartography by Cartography Section. Government of Ontario. Metropolitan Toronto inset.
  35. ^ Provincial Highways Construction Projects (Report). Ministry of Transportation and Communications. 1983–84. p. XIII. ISSN 0714-1149.
  36. ^ Provincial Highways Construction Projects (Report). Ministry of Transportation and Communications. 1984–85. p. XIII. ISSN 0714-1149.
  37. ^ Provincial Highways Construction Projects (Report). Ministry of Transportation. 1989–90. p. 13. ISSN 0714-1149.
  38. ^ Provincial Highways Construction Projects (Report). Ministry of Transportation. 1991–92. p. 13. ISSN 0714-1149.
  39. ^ Ministry of Transportation (1994–95). Ontario Road Map (Map). Cartography by Cartographic Mapping Unit. Government of Ontario. Metropolitan Toronto inset.
  40. ^ Ministry of Transportation (1994–95). Ontario Road Map (Map). Cartography by Cartographic Mapping Unit. Government of Ontario. Metropolitan Toronto inset.
  41. ^ "Highway 427 Southbound Off-Ramp/Brown's Line. Alderwood Plaza Access Driveway Turn Prohibition Amendment" (PDF). toronto.ca. February 29, 2008. Retrieved 29 September 2023.
  42. ^ "Traffic Disruptions". Highway 427 Expansion. Link427. Archived from the original on August 4, 2020. Retrieved August 4, 2020.
  43. ^ a b Rea, Bill (April 23, 2008). "MTO Just Looking North to Major Mack For 427 Extension". King Township Sentinel. King City, Ontario. Archived from the original on June 11, 2015. Retrieved January 9, 2012.
  44. ^ Highway 427 Transportation Corridor Environmental Assessment Final Report (PDF) (Report). Ministry of Transportation of Ontario. January 29, 2010. Retrieved January 9, 2012.[permanent dead link]
  45. ^ Searle, Patrick; Woozageer, Ajay (August 26, 2014). "Improvements Begin on Highway 427" (Press release). Ministry of Transportation of Ontario. Retrieved September 3, 2014.
  46. ^ "Behind the Project: Highway 427 over Highway 407ETR | Entuitive".
  47. ^ "Construction begins on Highway 427 expansion - ReNew Canada". 2 May 2018.
  48. ^ "Highway 427 Expansion". Infrastructure Ontario. Retrieved September 25, 2017.
  49. ^ Searle, Patrick; Nichols, Bob (March 3, 2016). "Ontario Moving Forward on Highway 427 Expansion" (Press release). Ministry of Transportation of Ontario. Retrieved March 8, 2016.
  50. ^ Lancaster, John (April 29, 2021). "Why You Can't Drive On This New, $616m Toronto-Area Highway". CBC News. Retrieved April 29, 2021.
  51. ^ "Ontario Picks Construction Consortium to Build Highway 427 Extension". Canadian Manufacturing. January 26, 2017. Retrieved December 20, 2017.
  52. ^ a b Martin-Robbins, Adam (June 9, 2017). "Hwy. 427 Extension Through Vaughan Will Require 11 Road Closures". Vaughan Citizen. Retrieved December 20, 2017.
  53. ^ "Ontario 'Moving Forward' With Plans to Extend Highway 427 to Vaughan: Minister". CBC News. March 3, 2016. Retrieved December 20, 2017.
  54. ^ Searle, Patrick; Nichols, Bob (March 3, 2016). "Ontario Moving Forward on Highway 427 Extension" (Press release). Ministry of Transportation of Ontario. Retrieved August 27, 2016.
  55. ^ Artuso, Antonella (September 16, 2021). "Highway 427 extension finally set to open". Toronto Sun. Retrieved September 16, 2021.
  56. ^ "Ontario Opens Highway 427 Expansion". Ministry of Transportation of Ontario. September 16, 2021. Retrieved September 18, 2021.
  57. ^ WSP (August 7, 2020). "Preferred Route Announcement" (PDF). GTA West Study (Press release). Aecom. Retrieved March 15, 2021.
  58. ^ "Ontario Building Highway 413". news.ontario.ca. April 30, 2024. Retrieved August 28, 2024.
  59. ^ Birnbaum, Leah; Nicolet, Lorenzo; Taylor, Zack (2004). "Why is growth going north of the Oak Ridges Moraine?: Proposed transportation corridor expansions". Simcoe County: The New Growth Frontier. Neptis Foundation. pp. 42–43. ISBN 0-9733314-6-1. Retrieved February 11, 2018.
  60. ^ Proposed 400 Series Highway Extensions for the Greater Toronto and Niagara Regions – Proposed Transportation Corridor Expansions (PDF) (Report). Pembina. January 1, 2004. Retrieved February 11, 2018.
  61. ^ "Highway 413". Highway 413. AECOM. 2021. Retrieved August 27, 2024.

Bibliography

edit
edit
KML is from Wikidata