Rublyovo-Arkhangelskaya line (Russian: Рублёво-Архангельская линия) or Line 17 of the Moscow Metro is currently under construction. It began in 2021 and will end after 2028, opening in two phases.[1][2] Phase 1 is scheduled to be completed by 2026–2027 completing the section from Delovoy Tsentr to Lipovaya Roscha station, and phase two is scheduled to open after 2028 expanding the line from Lipovaya Roshcha to Ilyinskaya station. In the future it is planned to be connected with the Biryulyovskaya line.[3]
Rublyovo-Arkhangelskaya line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | Рублёво-Архангельская линия | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Moscow | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 10 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Moscow Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Moskovsky Metropoliten | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 18.7 kilometres (11.6 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Underground | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,520 mm (4 ft 11+27⁄32 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Third rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Stations
editEnglish | Russian | Transfer | Status | Opening |
---|---|---|---|---|
Ilyinskaya | Ильинская | Planned | ||
Rublyovo-Arkhangelskoe | Рублёво-Архангельское | Planned | ||
Lipovaya Roshcha | Липовая Роща | Planned | ||
Strogino | Строгино | Strogino | Planned | |
Serebryanyy Bor | Серебряный Бор | Planned | ||
Bulvar Generala Karbysheva | Бульвар Генерала Карбышева | Under Construction | 2026 | |
Narodnoye Opolcheniye | Narodnoye Opolcheniye | Narodnoye Opolcheniye | Under Construction | 2026 |
Zvenigorodskaya | Звенигородская | Under Construction | 2026 | |
Shelepikha | Шелепиха | Shelepikha Testovskaya (within walking distance) |
Initially opened as part of Line 11, currently closed and will reopen with the opening of Line 17[4] | 2018 (as part of Line 11), 2026 (as part of Line 17) |
Delovoy Tsentr | Деловой Центр | Delovoy Tsentr Vystavochnaya Delovoy Tsentr (within walking distance) Testovskaya (within walking distance) Testovskaya (within walking distance) |
Initially opened as part of Line 11, currently closed and will reopen with the opening of Line 17[4] | 2018 (as part of Line 11), 2026 (as part of Line 17) |
References
edit- ^ "В Москве началось строительство Рублево-Архангельской линии метро". Interfax. Retrieved 8 October 2020.
- ^ "Началось строительство Рублево-Архангельской линии метро". Mos.ru (in Russian). 21 September 2020. Retrieved 8 October 2020.
- ^ "На карте метро может появиться 15-я линия - Рублево-Архангельская". kp.kg. 7 October 2016. Retrieved 8 October 2020.
- ^ a b https://mosmetro.ru/news/details/4629