This article needs to be updated.(November 2010) |
The Sărdăneşti Power Station will be one of the largest electricity producers in Romania, having 4 groups of 175 MW[1] each totalling an installed capacity of 700 MW and an electricity generation capacity of around 5.3 TW/year.
Sărdăneşti Power Plant | |
---|---|
Country | |
Location | Gorj County |
Status | Approved |
Owner | Energy Holding |
Thermal power station | |
Primary fuel | Sub-bituminous coal |
Power generation | |
Units operational | 4 |
Nameplate capacity | 700 MW |
The power plant will be situated in the Gorj County (South-Western Romania) on the banks of the Jiu River in Sărdăneşti. The construction of the power plant will begin in 2009 and it will be finished in 2013 at a total cost of US$ 1.3 billion.
See also
editReferences
edit