The Shiobara Pumped Storage Power Station (塩原発電所) is a pumped-storage hydroelectric power station in Nasushiobara, in the Tochigi Prefecture of Japan. It has a total installed capacity of 900 megawatts (1,200,000 hp). The power plant started operation in 1994.[2]

Shiobara Pumped Storage Power Station
View of the Sabigawa Dam
CountryJapan
LocationNasushiobara, Tochigi Prefecture
Coordinates36°59′44″N 139°52′07″E / 36.99556°N 139.86861°E / 36.99556; 139.86861
StatusOperational
Opening date1994
Operator(s)TEPCO
Upper reservoir
Total capacity11,900,000 m3 (9,600 acre⋅ft)[1]
Lower reservoir
Total capacity10,500,000 m3 (8,500 acre⋅ft)[1]
Power Station
Hydraulic head338 m (1,109 ft)[1]
Pump-generators3 x 300 MW
Installed capacity900 MW (1,200,000 hp)

Like most pumped-storage facilities, the power station uses two reservoirs, releasing and pumping as the demand rises and falls. The upper reservoir is contained by the Yashio Dam, a rock-fill dam. The lower reservoir is contained by the Sabigawa Dam, a concrete gravity dam.[1][3]

The power station employs three 300 MW pumping/generation units. The first 2 units started operation on 24 June 1994 and the third unit was started on 16 June 1995.[4]

See also

edit

References

edit
  1. ^ a b c d "Case Study 11-02: Benefits due to Power Generation – Large Scale Pumped Storage Power Plants, Japan" (PDF). IEA Hydropower Implementing Agreement Annex VIII. Archived from the original (PDF) on 24 September 2015. Retrieved 20 November 2015.
  2. ^ "Shiobara Pumped Hydro Power Station". DOE Global Energy Storage Database. US Department of Energy (DOE). Retrieved 20 November 2015.
  3. ^ "Press Release - Water Pumping of The Shiobara Power Station for Urgent and Temporary Useand Asking Our Customers for More Electricity Conservation". www.tepco.co.jp. TEPCO. Retrieved 20 November 2015.
  4. ^ "Special Note on Power Generation Facility". TEPCO. Retrieved 20 November 2015.