Sacramento Valley Station

(Redirected from Sacramento Valley station)

Sacramento Valley Station is an Amtrak railway station in the city of Sacramento, California, at 401 I Street on the corner of Fifth Street, built in 1926 on the site of China Slough. It is the thirteenth busiest Amtrak station in the country, and the second busiest in the Western United States. It is served by four different Amtrak train routes and connecting Amtrak Thruway motorcoaches. It is also the western terminus for the Gold Line of the SacRT light rail system and the Route 30 bus serving California State University, Sacramento.

Sacramento Valley Station
Sacramento, CA
Sacramento Valley Station in 2014
General information
Location401 I Street
Sacramento, California
United States
Coordinates38°35′05″N 121°30′02″W / 38.584791°N 121.500517°W / 38.584791; -121.500517
Owned byCity of Sacramento
Line(s)UP Martinez Subdivision
Platforms2 island platforms (Amtrak)
1 side platform (Light Rail)
Tracks4 (Amtrak)
2 (freight)
1 (Light Rail)
Connections
Construction
Parking288 long-term spaces, 45 short-term spaces
AccessibleYes
ArchitectBliss & Faville
Architectural styleLate 19th and 20th Century Revivals
Other information
Station codeAmtrak: SAC
WebsiteOfficial website
History
OpenedFebruary 27, 1926; 98 years ago (1926-02-27)[1]
December 8, 2006; 17 years ago (2006-12-08) (Gold Line)[2]
Passengers
FY 2023740,697[3] (Amtrak)
Services
Preceding station Amtrak Following station
Davis
toward Emeryville
California Zephyr Roseville
toward Chicago
Davis
toward San Jose
Capitol Corridor Roseville
toward Auburn
Davis Coast Starlight Chico
toward Seattle
Terminus San Joaquins Lodi
Preceding station Sacramento Regional Transit District Following station
Terminus Gold Line 8th & H
One-way operation
7th & I
Former services
Preceding station Amtrak Following station
Davis Coast Starlight Marysville
(1982–1999)
toward Seattle
Spirit of California
(1981–1983)
Terminus
Preceding station Southern Pacific Railroad Following station
Davis Shasta Route
Via East Side Sacramento Valley
Roseville
toward Portland
Overland Route Roseville
toward Ogden
Terminus Sacramento Daylight Brighton
Southern Pacific Railroad Company's Sacramento Depot
NRHP reference No.75000457[4]
Added to NRHPApril 21, 1975
Location
Map

Services

edit

Amtrak

edit
 
A Capitol Corridor train at Sacramento in August 2016

Sacramento is served by four Amtrak routes: two daily long-distance routes, and two Amtrak California corridor routes with multiple daily trains, for a total of 38 daily trains on weekdays and 30 each day on weekends as of 2016.[5]

The California Zephyr and Coast Starlight are long-distance routes with one train per day in each direction.

The San Joaquins operates a single daily round trip from Bakersfield by way of Modesto and Stockton with Sacramento as the northern terminus. Connections are available via Amtrak Thruway Motorcoach to five additional daily round trips that terminate in Oakland.

The Capitol Corridor operates 15 round trips on weekdays and 11 on weekends; Sacramento is the eastern terminus for all trains except for one daily round trip which continues to Auburn.[5]

In FY2017, Sacramento was the second busiest of Amtrak's 74 California stations, boarding or detraining an average of about 2,941 passengers daily. It is Amtrak's seventh-busiest station nationwide.[6]

Amtrak Thruway

edit
 
Thruway Motorcoach buses at Sacramento Valley Station

As of March 2024, Amtrak operates Amtrak Thruway bus service on three routes serving Sacramento Valley Station:[5]

Some Thruway buses also stop at the State Capitol (Amtrak: SCS ). The stop is for drop-off only, except for southbound passengers connecting to the San Joaquins at Stockton.

RT Light Rail

edit
 
A Gold Line train at Sacramento Valley Station in 2019

Sacramento Valley Station is the western terminus of the Gold Line, one of three routes of the SacRT light rail system. The station has a single side platform serving the single-track branch line, with a two-track layover yard to the west.

Local and commuter bus

edit

Sacramento RT bus routes 30 and 38 stop directly at the station.[7] However, many other RT bus routes terminate in downtown Sacramento, within several blocks of the station.

El Dorado Transit's Sacramento/South Lake Tahoe (SAC/SLT) commuter bus route (which also operates as Amtrak Thruway route 20) stops directly at the station

Additionally, Amador Transit, Roseville Transit, Yolobus, and Yuba-Sutter Transit all operate commuter bus routes that terminate in downtown Sacramento.

Future services

edit

Sacramento is planned to be the northern terminus of Phase II of the California High-Speed Rail system.[citation needed]

Greyhound Lines does not use Sacramento Valley Station for its competing intercity bus service; instead, its Sacramento terminal is located 1 mile (1.6 km) to the north, near the 7th & Richards / Township 9 RT Light Rail station.[8] However, Phase 3 of the ongoing renovation project may include additional bus bays to allow Greyhound to use Sacramento Valley Station as well.

Shasta Regional Transit Agency has proposed a weekday commuter bus from Redding and Red Bluff to the Sacramento Valley Station.[9]

History

edit

Pre-2006

edit
 
Interior of the waiting hall.

The original Sacramento station was the terminal of the Central Pacific Railroad. The present building, designed by the San Francisco architectural firm of Bliss and Faville for the Southern Pacific Railroad, was built in 1926 on the site of China Slough in the Renaissance Revival style.[10][11] Decorative features include a red tile roof and terracotta trim, as well as large arches on the main facade. Inside, the waiting room has a mural by artist John A. MacQuarrie that depicts the celebration of the groundbreaking for the First transcontinental railroad on January 8, 1863, in Sacramento. The Central Pacific started from Sacramento and built east to Promontory Summit, Utah, where it met the Union Pacific Railroad. The station is now owned by the City of Sacramento.[12] With the creation of Amtrak on May 1, 1971, the station became Amtrak-only. The station was listed on the National Register of Historic Places in 1975 as "Southern Pacific Railroad Company's Sacramento Depot".[4]

For most of Amtrak's first two decades, the only trains calling at Sacramento were long-distance routes. The California Zephyr and its predecessors have served the station from Amtrak's inception; several pre-Amtrak predecessors of the Zephyr stopped in Sacramento from the 1930s onward. The Coast Starlight arrived in 1982. From 1981, the Spirit of California ran as a sleeper to Los Angeles along the far southern leg of the Coast Starlight route. Service expanded dramatically in 1991 with the introduction of the Capitols service, now the Capitol Corridor. Partly due to its success, it is now the second-busiest station in the Western United States, behind only Los Angeles Union Station, and the seventh-busiest station overall.

The Sacramento Regional Transit Gold Line service was extended 0.5 miles (0.80 km) to Sacramento Valley Station on December 8, 2006.[2]

Renovation and Railyards project

edit
 
Map of the track relocation project

The City of Sacramento, in conjunction with the Sacramento Railyards Project, is undertaking an extensive multi-stage renovation project.

The first stage, called the Sacramento Valley Station Intermodal Phase I, was completed on August 13, 2012, with the complete relocation of all heavy-rail passenger platforms (Amtrak) approximately 1,000 feet (300 m) further north from their previous location. Sacramento Regional Transit Gold Line light rail operations remain in their original location directly behind the station depot.

The second stage, called the Sacramento Valley Station Intermodal Phase II, was extensive work performed on the station depot building itself. This work included long-deferred retrofitting and structural repair, window replacement, accessible accessibility work, Life Safety fire code work including the outward opening of emergency exit doors and panic hardware installation, and both appearance and comfort rehabilitation to make the station better serve the public. As a result, the station interior was full of scaffolding to facilitate the work being undertaken, causing the passenger waiting space to be visibly confined throughout the duration of the renovation. The work also saw the complete relocation of the Amtrak ticket and baggage offices from the 1960s era addition on the back side of the waiting room; and the new offices located in the former station restaurant space on the North wing of the station and are more passenger-friendly. The station renovation was officially concluded on February 23, 2017, with a grand re-opening hosted by city officials.[13]

 
The westbound California Zephyr at Sacramento in February 1985

The third and final stage, called the Sacramento Valley Station Intermodal Phase III, will consist of continued station improvements, including the light rail trackage realignment into a downtown loop, addition of a new bus loop and terminal adjacent to the new platform, and construction of an elevated concourse to replace the current walkway to permanently connect the Railyards development to the north. Additional features will also include new bicycle trails, site preparation for commercial and mixed-residential use surrounding the historic depot, and possible land conversion for the California State Railroad Museum expansion east where parking lots currently exist. This phase is currently still under review, including environmental evaluation and eventual RFPs for construction scheduled in the next 5–10 years.[12]

The city does not plan to immediately vacate the station, but services inside the main Head House building will slowly shift over the coming years as various projects to remodel and retrofit the facility and grounds progress. Eventually, however, the historic Head House will see less use as a transportation facility as the California High Speed Rail Project progresses, and when the planned Sacramento Intermodal Transportation Center is constructed along 5th Street between the Depot and the new platforms, all passenger services will leave and the historic structure will fully be available for use in other roles.[12] The long-term plan also calls for integrating the proposed Sacramento Streetcar project as well as constructing a loop for light rail lines to enable through-running.[12] As of May 2019, the streetcar project has been indefinitely stalled due to rising costs.[14]

See also

edit

References

edit
  1. ^ "New Station is Formally Thrown Open to the City". The Sacramento Bee. February 27, 1926. p. 1. Retrieved December 8, 2021 – via Newspapers.com.
  2. ^ a b "Sacramento Regional Transit District Fact Sheet" (PDF). Sacramento Regional Transit District. May 2016.
  3. ^ "Amtrak Fact Sheet, Fiscal Year 2023: State of California" (PDF). Amtrak. March 2024. Retrieved June 26, 2024.
  4. ^ a b "National Register Information System". National Register of Historic Places. National Park Service. April 15, 2008.
  5. ^ a b c "Amtrak System Timetable" (PDF). Amtrak. January 11, 2016.
  6. ^ "Amtrak Fact Sheet, Fiscal Year 2017 – State of California" (PDF). Amtrak. November 2017.
  7. ^ "SacRT Forward Draft Networks". Retrieved December 19, 2018.
  8. ^ "Sacramento Bus Station". Greyhound Lines. Retrieved August 22, 2016.
  9. ^ "Shasta Intercity Bus Transportation Studies | Shasta Regional Transportation Agency, CA".
  10. ^ "New Station is Formally Thrown Open to the City". The Sacramento Bee. February 27, 1926. p. 8. Retrieved December 8, 2021 – via Newspapers.com.
  11. ^ Great American Stations. Accessed February 19, 2013.
  12. ^ a b c d Sacramento Valley Station Master Plan (PDF) (Report). City of Sacramento. February 27, 2018. Retrieved December 24, 2018.
  13. ^ Chabria, Anita (February 23, 2017). "Restored Sacramento train depot offers glimpse of past and future". The Sacramento Bee. Retrieved July 18, 2019.
  14. ^ "Sacramento streetcar project in serious jeopardy as price tag soars". The Sacramento Bee.
edit