San Jose and Santa Rosa station

San Jose and Santa Rosa is a light rail stop on the Muni Metro J Church line, located in the Mission Terrace neighborhood of San Francisco, California. The station has two short side platforms in the middle of San Jose Avenue (traffic islands) located before the intersection in each direction. The station is not accessible.

San Jose and Santa Rosa
J Church
Eastbound train at San Jose and Santa Rosa in November 2019
General information
LocationSan Jose Avenue at Santa Rosa Avenue
San Francisco, California
Coordinates37°43′44″N 122°26′24″W / 37.72895°N 122.44010°W / 37.72895; -122.44010
Platforms2 side platforms
Tracks2
Construction
AccessibleNo
History
OpenedAugust 31, 1991
Services
Preceding station Muni Following station
San Jose and Santa Ynez
towards Balboa Park
J Church San Jose/​Glen Park
towards Embarcadero
Location
Map

History

edit

J Church and N Judah trains began using the extension of the J Church line along San Jose Avenue for carhouse moves on August 31, 1991. Although these trips were open to passengers, the extension and its stops did not open for full-time J Church service until June 19, 1993.[1]

In March 2014, Muni released details of the proposed implementation of their Transit Effectiveness Project (later rebranded MuniForward), which included a variety of stop changes for the J Church line. Under that plan, the inbound platform would be extended towards Santa Rosa Avenue, and the outbound platform moved south of the street, thus allowing trains to cross through the intersection before stopping.[2] In 2015, an SFMTA study recommended the addition of accessible "key stop" ramps between Santa Ynez and Santa Rosa, to be located at San Juan Avenue (inbound) and Nantucket Avenue (outbound). Planning for the J Church Safety and Accessibility Project began in 2022. The 2015-proposed key stop locations were deemed substandard, in part because they would be located separate from the regular platforms. The plans for relocating the boarding islands were also found to be infeasible. Instead, the platforms will be lengthened and widened in their existing configuration, and a key stop will be added to the outbound platform.[3][4] The project was approved in October 2023, with most construction to take place in 2025–2027.[5][6]

References

edit
  1. ^ Callwell, Robert (September 1999). "Transit in San Francisco: A Selected Chronology, 1850–1995" (PDF). San Francisco Municipal Railway.
  2. ^ "Chapter 3: Proposals by Route". Transit Effectiveness Project Implementation Workbook (PDF). San Francisco Municipal Transportation Agency. March 24, 2014. pp. 52–56.
  3. ^ "Calendar Item No. 13" (PDF). San Francisco Municipal Transportation Agency. October 2023. pp. 11–12.
  4. ^ "J Church Safety and Accessibility Project Detail Boards" (PDF). San Francisco Municipal Transportation Agency. October 2023.
  5. ^ "J Church Muni Forward Improvements" (PDF). San Francisco Municipal Transportation Agency. October 17, 2023.
  6. ^ "Resolution No. 231017-085" (PDF). San Francisco Municipal Transportation Agency.
edit

  Media related to San Jose and Santa Rosa station at Wikimedia Commons