Washington State Route 704

State Route 704 (known as SR 704 or the Cross-Base Highway) is a state highway located entirely in Pierce County, Washington, United States. It is intended to provide access between Interstate 5 (I-5) and SR 7 by passing through a portion of Joint Base Lewis–McChord, a major U.S. military installation. The designated route comprises a short, 0.6-mile (0.97 km) section near SR 7 in Spanaway. The full 6-mile (9.7 km) highway is estimated to cost $480 million to construct, but remains unfunded.

State Route 704 marker
State Route 704
Map of southwestern Pierce County with the proposed route of SR 704 highlighted in red.
Route information
Auxiliary route of SR 7
Maintained by WSDOT
Length0.63 mi[1] (1,010 m)
Existed2002–present
Major junctions
West endSpanaway Loop Road near Spanaway
East end SR 7 near Spanaway
Location
CountryUnited States
StateWashington
CountyPierce
Highway system
SR 702 I-705

Route description

edit

The legislative definition of SR 704 begins at I-5 near Lakewood on the northwest side of Joint Base Lewis–McChord, a U.S. military installation.[2] The signed portion of the highway begins at milepost 5.92, an intersection with Spanaway Loop Road south of Spanaway Lake.[3] The highway travels east for 0.63 miles (1.01 km) between Joint Base Lewis–McChord and a residential neighborhood to its eastern terminus, an intersection with SR 7 at 176th Street East. The signed section of SR 704 is wholly contained within the unincorporated community of Spanaway in southern Pierce County.[4][5]

The signed portion of SR 704 is a divided highway with five lanes—three eastbound and two westbound—separated by a median barrier.[5] It is maintained by the Washington State Department of Transportation (WSDOT), which conducts an annual survey of traffic volume that is expressed in terms of annual average daily traffic. The lone counting station on SR 704, at Spanaway Lake Road, measured an average of 22,000 vehicles using the highway in 2016.[6]

History

edit

The Pierce County government proposed the construction of a new highway connecting I-5 to SR 7 south of McChord Air Force Base in the late 1980s to address congestion on nearby highways. The route would follow the perimeter between McChord Air Force Base and neighboring Fort Lewis, terminating at Thorne Lake in Tillicum in the west and Spanaway in the east.[7] The proposal, dubbed the Cross-Base Highway, was forwarded to the state government, U.S. Army, and U.S. Air Force for consideration.[8] The county government studied eight routes for the highway and eliminated four in 1992 after being unable to reduce impacts to the Fort Lewis Logistics Center.[9] The remaining options were determined to have adverse affects on American Lake Gardens, a residential neighborhood near the Thorne Lake interchange, generating protests.[10]

In 2002, the state legislature assigned SR 704 to the Cross-Base Highway and earmarked part of the $127 million in funding needed for the project.[11] The Federal Highway Administration issued a record of decision that approved the project in 2004, allowing for land acquisition and engineering to begin. The project remained opposed by environmental and conservation groups seeking to limit urban sprawl and the encroachment on the habitats of endangered species.[12] $50 million in funding for the project was proposed as part of the 2007 Roads and Transit ballot measure,[13][14] which was rejected by voters.[15] Earlier versions of the package omitted SR 704 in favor of widening other streets and addressing needs on other Pierce County highways.[16]

Environmental lawsuit

edit

In July 2010,[17] a coalition of local businesses, conservation organizations, and equestrian clubs filed a lawsuit against the Federal Highway Administration, WSDOT, and Pierce County[18] to prevent construction of the proposed highway. Because the project has no funding and thus no construction schedule, the parties agreed to a stay of proceedings on October 15.[17]

The coalition contended that the agencies failed to follow the Endangered Species Act, the National Environmental Policy Act, and failed to adequately consider reasonable alternatives.[18] The coalition reports that the proposed highway would bisect the largest remnant oak woodland-prairie left in the Puget Sound area.[18] The US Fish and Wildlife Service describes the area as "possibly the rarest habitat in North America,"[18] home to at least 29 species of federal and/or state threatened, endangered, candidate, and sensitive plant and animal species of concern, 18 of which are in the immediate vicinity of the proposed highway.[19]

Drawing comparisons with Mt. Rainier National Park and Nisqually National Wildlife Area, Pierce County's Biodiversity Network Assessment describes the area as "the most biologically and ecologically rich area remaining in the lower elevations of Pierce County." The County predicts that these diverse habitats support 20 state or federally listed species, 24 Priority Habitat and Species, and 10 at-risk species, and dozens of other plants and animals.[20]

The project's Environmental Impact Statement states,

None of the areas affected by the project are quality prairie habitat; most of the grasslands are non-native. The alignment was purposely placed to avoid wetlands. The Douglas-fir forest habitat is all second-growth; most is in even-aged stands with little structural diversity and is considered to be invasive to oak woodland and prairie habitats. The grassland habitats with some native prairie species intersected by the proposed alignment occur at two locations. The first is a mowed field with few native plants west of Lake Mondress that is also heavily used as a practice arena by equestrian enthusiasts. The second location is southeast of Lake Mondress, where the alignment skirts the northern edge of a prairie habitat mostly invaded by Scot's broom. The intersection point is at a disturbed railway junction. Both locations support prairie habitat. The remaining areas are disturbed fields dominated by weedy Scot's broom. In summary, the project does not affect grasslands or prairie of the type referred to in this comment.[21]

The EIS also states that "By 2025, most of the freeway and arterial street systems will operate at [Level of Service] F conditions with volume/capacity (V/C) ratios well above 1.0." This means very heavy congestion and gridlock during most of the day.[22]

Furthermore, the proposed highway will increase climate impacts by increasing driving distance. The EIS states that "Overall, people would travel a little farther to use the new Cross-Base Highway project to avoid other congested highways and arterials; this would increase miles driven."[23]

A contrary view was expressed by Pierce County Executive John Ladenburg, who believes that it would be "environmentally irresponsible not to build that highway,"[24] because SR 704 will lessen development in the Puyallup Valley farmlands.

Construction and cancellation

edit

The Washington State Department of Transportation (WSDOT) planned to extend the highway to be 6 miles (9.7 km) long, originating at Interstate 5 in the Tillicum neighborhood of Lakewood, Washington. A four-lane, divided highway with four intersections over its entire length,[25] SR 704 may improve access to and between the military installations by providing an exclusive roadway between Fort Lewis and McChord AFB. It could also connect the developing industrial areas of DuPont and Frederickson as well as provide an east–west alternate thoroughfare to overcrowded[citation needed] SR 512.

After voters rejected a November 2007 ballot measure which would fund the construction, most of the project was put on hold.[26] However, on June 20, 2008, the WSDOT awarded a $7.35 million contract to Ceccanti Inc. for widening of the eastern 0.7 miles (1.1 km) of the route between Spanaway Loop Road and State Route 7.[26][27] Groundbreaking was July 30, 2008.[28] Assistant Project Engineer John Ho says that the project was scheduled to be completed by 2017 at the earliest.[29] As of 2024, the project remains on hold until further action is taken by the state legislature.[28]

The WSDOT puts the 2007 price tag for the highway at $480 million. However, only $43 million has been funded, requiring at least $437 million.[28] Of this gap, only $50 million had been expected to be funded by a failed 2007 ballot initiative which in the end did not include the project.[16]

In August 2017, the Federal Highway Administration rescinded its record of decision for the project, which had been issued in 2004.[30]

Major intersections

edit

The entire route is in Pierce County.

Locationmi[1]kmDestinationsNotes
0.000.00Spanaway Loop RoadAt-grade intersection
0.631.01  SR 7 – Spanaway, Elk PlainAt-grade intersection
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

edit
  1. ^ a b Multimodal Planning Division (January 4, 2021). State Highway Log Planning Report 2020, SR 2 to SR 971 (PDF) (Report). Washington State Department of Transportation. p. 1683. Retrieved April 8, 2022.
  2. ^ "RCW 47.17.818: State route No. 704". Revised Code of Washington. Washington State Legislature. 2002. Retrieved April 8, 2022.
  3. ^ WSDOT Transportation Data, GIS & Modeling Office (2019). Washington State Highway System Mileposts 2019, Puget Sound Area (PDF) (Map). Washington State Department of Transportation. Retrieved April 8, 2022.
  4. ^ "State Route 704" (Map). Google Maps. Retrieved April 8, 2022.
  5. ^ a b "Corridor Sketch Summary – SR 704: Cross-Base Highway" (PDF). Washington State Department of Transportation. August 28, 2018. Retrieved April 30, 2021.
  6. ^ 2016 Annual Traffic Report (PDF) (Report). Washington State Department of Transportation. 2017. p. 213. Archived from the original (PDF) on February 8, 2020. Retrieved April 8, 2022.
  7. ^ Voelpel, David (March 26, 1989). "South-county link to I-5 gains momentum". The News Tribune. p. B1. Retrieved April 7, 2022 – via Newspapers.com.
  8. ^ Rushton, Bruce (May 29, 1992). "Road linking Spanaway, I-5 could be built within 5 years". The News Tribune. p. B1. Retrieved April 7, 2022 – via Newspapers.com.
  9. ^ Eckart, Kim (July 22, 1996). "Fighting for another route". The News Tribune. pp. B1, B4. Retrieved April 7, 2022 – via Newspapers.com.
  10. ^ Card, Skip (June 2, 1998). "Road plans split neighborhood". The News Tribune. p. B1. Retrieved April 7, 2022 – via Newspapers.com.
  11. ^ Kawada, Eijiro (June 15, 2002). "Report: Cross-base highway route impact minimal". The News Tribune. p. B1. Retrieved April 7, 2022 – via Newspapers.com.
  12. ^ Corvin, Aaron (August 4, 2004). "Cross-Base Highway wins long-awaited proposal". The News Tribune. p. B1. Retrieved April 7, 2022 – via Newspapers.com.
  13. ^ "Your Overview of Proposition 1: Roads & Transit" (PDF). Sound Transit, Regional Transportation Investment District. October 2007. p. 3. Archived from the original (PDF) on December 16, 2007. Retrieved November 27, 2022.
  14. ^ Kawada, Eijiro (March 15, 2007). "East Pierce highway fight continues". The News Tribune. p. B1. Retrieved November 27, 2022 – via Newspapers.com.
  15. ^ Turner, Joseph (November 7, 2007). "Voters turn down transit, put brakes on new taxes; Prop. 1 proves too costly". The News Tribune. p. A1. Retrieved November 27, 2022 – via Newspapers.com.
  16. ^ a b Wickert, David (May 11, 2007). "Base highway might get ax". The News Tribune. p. A1. Archived from the original on May 22, 2011. Retrieved November 27, 2022.
  17. ^ a b Hill, Christian (October 22, 2010). "Judge agrees to halt Lewis-McChord cross-base highway suit". The News Tribune. Archived from the original on April 3, 2012. Retrieved October 22, 2010.
  18. ^ a b c d Dold, Jennifer A.; Bricklin, David A. (November 28, 2006). "Cross-Base Letter" (Notice of Intent Letter). Archived from the original (PDF) on September 27, 2007.
  19. ^ "Cross Base Highway Coalition".[dead link]
  20. ^ "Pierce County Biodiversity Network Assessment" (PDF). August 2004. Retrieved October 22, 2010.
  21. ^ Final Environmental Impact Statement, Cross-Base Highway Project, Chapter 6 - Comments and Responses, §6.4, at pg. 6-5
  22. ^ Cross-Base Highway SDEIS, Table 3.1-7
  23. ^ Cross-Base Highway FEIS, p. 4-201
  24. ^ "Cross-base highway faces suit". The News Tribune. November 20, 2006.
  25. ^ "Quarterly Project Report Update for Quarter Ending March 2006".
  26. ^ a b George, Hunter T. (June 30, 2008). "Cross-base highway head-scratcher explained". The News Tribune. Archived from the original on February 22, 2012. Retrieved August 18, 2008.
  27. ^ "Cross Base Corridor Information". Pierce County Public Works and Utilities. Retrieved August 18, 2008.
  28. ^ a b c "WSDOT - SR 704 - Cross-Base Highway Project".
  29. ^ "Cross Base Highway Discussed". The Suburban Times. March 20, 2007. Archived from the original on March 20, 2008.
  30. ^ "Notice of Rescinding the Record of Decision (ROD) for the State Route 704, Cross Base Highway Project in Pierce County, Washington". Federal Register. Federal Highway Administration. August 29, 2017. Retrieved April 30, 2021.