Talk:Clarendon Hills station

Latest comment: 2 years ago by Casey56 in topic Opening date
edit

Hello fellow Wikipedians,

I have just modified 2 external links on Clarendon Hills station. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, please set the checked parameter below to true or failed to let others know (documentation at {{Sourcecheck}}).

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 5 June 2024).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 20:34, 25 November 2016 (UTC)Reply

Opening date

edit

The Infobox says station opened in 1965. This is obviously wrong as I was using it in 1948; perhaps is a reopening date after station renovations. The 3 Hinsdale stations' Wiki pages say opened in dates from 1875 to 1898. The main Wiki page for CB&Q says passenger service between Aurora and Chicago began in 1864. I removed the offending date pending posting, I hope, of a better date. Casey (talk) 01:54, 28 November 2022 (UTC)Reply