The West Davis Corridor (designated as Utah State Route 177 or SR-177)[2] is a 16-mile-long (26 km) freeway completely within Davis County in northern Utah. The corridor splits off from Interstate 15 (I-15) and U.S. Route 89 (US-89) along with the Legacy Parkway (SR-67) in Farmington and goes through the western confines of the Ogden–Clearfield metropolitan area before ending at an T-intersection with SR-193 in West Point.
Route information | ||||
---|---|---|---|---|
Maintained by UDOT | ||||
Length | 16 mi[1] (26 km) | |||
Existed | January 6, 2024[1]–present | |||
Major junctions | ||||
South end | I-15 / US 89 / SR-67 in Farmington | |||
SR-127 in Syracuse | ||||
North end | SR-193 in West Point | |||
Location | ||||
Country | United States | |||
State | Utah | |||
Highway system | ||||
| ||||
|
Planning for the corridor drew environmental controversy prior to its construction, leading to adjustments in response to environmental groups such as adding multi-purpose trails paralleling the highway. Construction began on the West Davis Corridor in early 2021 and was open to traffic on January 6, 2024, although construction would not be completed until February 21, 2024.[3]
Route description
editThe highway begins at an interchange with I-15/US-89 and Legacy Parkway just south of Glovers Lane in Farmington, proceeding to the northwest as a four-lane freeway. It swings to the north, following the shoreline of the Great Salt Lake, before turning northwest at an interchange with a proposed connection to Shepard Lane. The freeway continues northwest through the cities of Kaysville and Layton, with interchanges at 200 North and 2700 West. Entering Syracuse, the route shifts onto the alignment of Bluff Road, with interchanges at 2000 West and Antelope Drive (SR-127). Past Antelope Drive, the highway narrows to two lanes. As the route continues into West Point, it turns northward, ending at the extension of SR-193.[4]
History
editInitial proposals
editThe idea for a new corridor connecting Ogden and Salt Lake City existed as early as the 1960s.[5] However, it was not officially studied until 1995, when state representative Marda Dillree pushed the Utah State Legislature to allocate $600,000 for a corridor planning study.[6] The idea was included in Governor Mike Leavitt's ambitious Legacy Highway proposal in 1996; Leavitt envisioned a new highway running from Brigham City to Nephi through the western portions of the Wasatch Front, though no route had been selected at that time.[7] Other portions of this proposal would become today's Legacy Parkway and Mountain View Corridor.
Almost from the beginning, the planned routing of what was then known as the Western Transportation Corridor was filled with disputes. In particular, a dispute over the routing north of Gentile Street in Layton came to a head in April 1997, when the committee tasked with selecting a route could not come to an agreement. Officials from West Point had identified a corridor along Bluff Road and had been preserving land along it since 1986. However, Syracuse preferred a western alignment that would not split the city, citing hazards to schools and other city facilities. Two western routes were being studied: one that ran roughly between 4200 and 4500 West, and another just east of the Great Salt Lake marshes. The 4500 West corridor ran through 1,000 acres of productive farmland and was deeply opposed by farmers and the state agricultural department, while the Great Salt Lake corridor would negatively impact wetlands protected under federal law.[8] While Davis County cities and residents mostly supported the proposal, reception in Weber County was much more mixed. Some officials from that county opposed reserving land for a highway that might not ever be built, while others worried about the agricultural lifestyle of northwestern portions of the county. They also stated that the new corridor was not near the top of their priority list, instead favoring improvements on I-15 and existing arterials. Farr West opposed any route coming close to the Weber County line, while Hooper residents would support a highway provided it would only carry local traffic.[9]
However, most of these disputes had been resolved by July of that year, when the committee was finally able to select a route through northern Davis and southern Weber counties. Under the agreement, it would follow Bluff Road from Gentile north to 300 North in West Point, where it would go north into Weber County to the intersection of 4900 West and 5500 South. From this point it would continue to 4000 South along an alignment just west of 4700 West, before moving east to 3500 West and continuing north to end at 1200 South.[10] This corridor was identified as the preferred alternative in a 2001 study.[11] A route through the rest of Weber County would not be identified until a 2009 supplemental study.[12]
Possible connections between the proposed corridor (then referred to as Legacy North) and Legacy Parkway were identified in a 2007 UDOT study, which identified a preferred alignment beginning at a combined interchange with I-15/Legacy Parkway and roughly following the old Denver & Rio Grande Western Railroad alignment northward. However, Farmington was unhappy with this result and commissioned its own study, which recommended waiting to adopt an alignment until a full environmental analysis could be conducted.[13]
Environmental studies
editIn 2010, UDOT began an $8 million federal environmental impact study on the North Legacy Corridor, though by this time UDOT had changed the name of the project to "West Davis Corridor".[14] To avoid legal battles similar to the Legacy Parkway controversies, UDOT reached out to environmental groups early on in the process. Environmental groups generally opposed the highway, citing concerns over wetlands and air quality.[15] By August 2010, the UDOT study had identified four possible routings through northwestern Davis County: the 2001 alignment along Bluff Road, another alignment east of Bluff Road following existing electrical transmission lines, another alignment further east following the FrontRunner commuter rail line, and a fourth alignment along the eastern edge of the Great Salt Lake.[16] The study had narrowed down to three potential options by September 2011, including two alternatives that would have negative impacts on wetlands and agriculture, plus a "no-build" alternative.[17] The study was further refined in 2012, decreasing the area of wetlands, agriculture, and number of homes affected.[18]
The draft environmental impact study was released in May 2013, outlining one proposed route that would begin at I-15 and Legacy Parkway in Centerville, proceeding generally northwest and north to 4100 West in Weber County. The cost was estimated at $587 million; the route would impact 26 homes, 110 acres of high-quality farmland, and 52 acres of high-quality wetlands.[19]
The proposed routing was not without controversy. Although Farmington city officials supported the highway, they continued their opposition of the Glovers Lane routing, believing such an alignment would effectively bypass the city. Farmington officials suggested a connection to Interstate 15 at Shepard Lane instead, stating it would benefit the city and relieve congestion on Park Lane.[19][20]
Shared solution
editHowever, the strongest opposition to the proposed freeway came from environmental groups. A coalition of several groups including the Sierra Club, Great Salt Lake Audubon, and Utah Physicians for a Healthy Environment proposed a "shared solution" and distributed it to several top officials. Instead of building a new freeway, the Shared Solution proposed to enhance existing roads and increase transit, emphasizing "boulevard community development", new innovative intersection designs, and locally focused road designs. It also proposed widening existing east-west arterial roads and building a reversible lane on I-15.[21] According to its proponents, the Shared Solution improvements combined would move the same amount of traffic as a freeway. UDOT agreed to study the Shared Solution, but rejected it in 2016 after determining it would not alleviate congestion enough to meet transportation needs in 2040. However, UDOT acknowledged the efforts of the Shared Solution coalition, and included many ideas from the Shared Solution in plans for the West Davis Corridor as well as other area projects.[22]
Final planning
editThe final environmental impact statement was released on July 6, 2017, followed by a two-month public comment period.[23] The 2017 route was largely identical to the one proposed in 2013, extending from Glovers Lane northwest to 1800 North (SR-37) in West Point. Although Farmington had pushed for the highway to end at Shepard Lane, UDOT studies determined an interchange in that location would not meet federal safety guidelines due to its proximity to the US-89/Legacy interchange.
Unlike the similar Legacy Parkway to the south, the freeway would have a 65 mph speed limit and allow large trucks, but UDOT officials expect low truck traffic on the corridor. However, several concessions were made to environmental groups; in particular, UDOT agreed to use dark-sky lighting designs, ground-level construction, and noise-reducing pavement. In addition, 20 miles of new multi-use trails will be built paralleling the highway. Although not all parties were happy with the results of the study, most were satisfied with the changes UDOT had made between the 2013 and 2017 environmental studies.[24]
The Federal Highway Administration and UDOT issued a final record of decision in September 2017, with property acquisition and design continuing through 2018 and 2019. Construction of the segment between I-15 and Antelope Drive was expected to begin in 2020 and last through 2022, at a cost of $610 million.[25]
Construction
editThe first phase of the West Davis highway consists of a 16 miles (26 km) stretch of freeway with two lanes in each direction, extending from a system interchange at I-15 and Legacy Parkway in Farmington northwest through Kaysville, Layton, and Syracuse to a planned western extension of SR-193 in West Point. This initial phase also includes interchanges at 950 North in Farmington, 200 North in Kaysville, 2700 West in Layton, and 2000 West and Antelope Drive (SR-127) in Syracuse, as well as over 10 miles (16 km) of multi-use trails paralleling the highway. Farmington Bay Constructors, a joint venture of Ames Construction, Wadsworth Brothers Construction, and Staker Parson Materials and Construction, was contracted to design and build this first phase for $750 million.[26]
Construction began in March 2021, with activity ramping up from south to north along the route in subsequent months. Work was contracted to be complete by fall 2024, but officials believed the project could be finished at a sooner date.[26] The project was 60 percent complete by January 2023, with a completion date estimated at mid-2024.[27] By March 2023, completion had reached 70 percent, but the expected opening was pushed back to fall 2024, in part due to construction delays caused by the unusually snowy winter that year.[28] Despite these delays, significant progress was made over the following spring and summer, and by September, UDOT hoped to have the highway open by the end of the year.[29] However, construction was abruptly halted after a construction worker was killed in a crane collapse at the highway's interchange with I-15 on October 23, 2023.[30] The highway would officially open on January 6, 2024,[1] although construction would not be completed until February 21, 2024.[3]
Future
editUDOT long-range plans call for the West Davis highway to be extended further northward in the future, running through the Weber County communities of Hooper and West Haven before ultimately connecting back to I-15 in southern Box Elder County. Since 1800 North in West Point was the northern boundary of the 2017 environmental impact study area, the highway could be extended to that point with only funding from the state legislature. Although planning studies have identified a corridor for preservation through western Weber County, any extensions beyond 1800 North will require further environmental studies in addition to substantial funding.[26][1]
Exit list
editThe entire route is in Davis County.
Location | mi | km | Exit | Destinations | Notes |
---|---|---|---|---|---|
Farmington | 0 | 0.0 | 1A–B | I-15 / US 89 / SR-67 (Legacy Parkway) – Salt Lake City | Southern terminus; signed as exits 1A (I-15) and 1B (SR-67) |
4 | 6.4 | 4 | 950 North | ||
Kaysville | 7 | 11 | 7 | 200 North | |
Layton | 9 | 14 | 9 | 2700 West | |
Syracuse | 12 | 19 | 12 | 2000 West | |
13 | 21 | 13 | SR-127 (Antelope Drive) | Single-point urban interchange; road narrows to 2 lanes north of this point | |
16 | 26 | 15 | SR-193 | Northern terminus; T-intersection | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
References
edit- ^ a b c d Hill, Victoria (January 6, 2024). "New West Davis Highway opens to drivers in Davis County". KUTV. Sinclair Broadcast Group. Retrieved January 8, 2024.
- ^ "Current Projects". Utah Department of Transportation. Retrieved May 5, 2021.
- ^ a b "Utah Opens Largest Highway Project Ahead of Schedule". Construction Equipment Guide. February 21, 2024. Retrieved February 21, 2024.
- ^ "West Davis Corridor Preferred Alternative". Utah Department of Transportation. Retrieved May 5, 2021.
- ^ Dougherty, Joseph (September 17, 2008). "The Legacy continues? Corridor to extend parkway may run through homes". Deseret News. Archived from the original on July 17, 2019. Retrieved July 9, 2019.
- ^ Edwards, Alan (May 3, 1995). "Lawmaker pushes for Ogden-S.L. corridor". Deseret News. Archived from the original on October 1, 2018. Retrieved July 9, 2019.
- ^ Arave, Lynn (July 17, 1996). "Big changes down the road in Utah". Deseret News. Retrieved July 9, 2019.
- ^ Rosebrock, Don (June 23, 1997). "Road plan triggers deep split". Deseret News. Archived from the original on October 4, 2018. Retrieved July 9, 2019.
- ^ Rosebrock, Don (April 5, 1997). "Plans for Legacy highway stall in N. Davis". Deseret News. Archived from the original on October 4, 2018. Retrieved July 9, 2019.
- ^ Hayes, Tom (July 19, 1997). "Legacy Highway corridor picked for Davis, Weber". Deseret News. Archived from the original on October 6, 2018. Retrieved July 9, 2019.
- ^ Wasatch Front Regional Council, Utah Department of Transportation (2001). "North Legacy Transportation Corridor Study" (PDF). Retrieved July 8, 2019.
- ^ InterPlan Transportation Planning (October 2009). "North Legacy Corridor Supplemental Study" (PDF). Retrieved July 8, 2019.
- ^ WCEC Engineers, Inc. (September 14, 2007). "Technical Memorandum: Legacy North to Legacy Connection Evaluation Study" (PDF). Retrieved July 9, 2019.
- ^ Dougherty, Joseph (January 18, 2010). "UDOT to kick off $8M Davis County study on 'Legacy North'". Deseret News. Archived from the original on September 24, 2018. Retrieved July 9, 2019.
- ^ "UDOT considers Legacy Parkway expansion". Deseret News. March 8, 2010. Archived from the original on August 18, 2010. Retrieved July 9, 2019.
- ^ "UDOT studying Legacy, transit extension". Deseret News. August 3, 2010. Archived from the original on December 11, 2010. Retrieved July 9, 2019.
- ^ Lee, Jasen; Leonard, Wendy (September 8, 2011). "UDOT releases West Davis Corridor road plan". Deseret News. Archived from the original on July 7, 2016. Retrieved July 9, 2019.
- ^ Lee, Jasen (October 4, 2012). "UDOT refines Davis County highway proposal". Deseret News. Archived from the original on October 7, 2012. Retrieved July 9, 2019.
- ^ a b Lee, Jasen (May 16, 2013). "West Davis Corridor project unveiled amid criticism". Deseret News. Archived from the original on June 13, 2013. Retrieved July 13, 2019.
- ^ Winslow, Ben (June 11, 2013). "Hundreds pack meeting to protest West Davis Corridor". Fox 13. Retrieved July 13, 2019.
- ^ O'Donoghue, Amy Joi (May 7, 2013). "Critics push for alternative to West Davis highway". Deseret News. Archived from the original on May 9, 2013. Retrieved July 13, 2019.
- ^ Lee, Jasen (May 20, 2016). "UDOT rejects Shared Solution proposal for Davis County freeway". KSL. Retrieved July 9, 2019.
- ^ Whitney, Zach (July 6, 2017). "UDOT Releases West Davis Corridor Final Environmental Impact Statement". UDOT Blog. Utah Department of Transportation. Retrieved July 13, 2019.
- ^ Davidson, Lee (July 7, 2017). "Final proposal: West Davis freeway takes controversial route, with environmentally friendly tweaks". The Salt Lake Tribune. Retrieved July 13, 2019.
- ^ Davidson, Lee (October 3, 2017). "New West Davis freeway receives final green light". Salt Lake Tribune. Retrieved July 8, 2019.
- ^ a b c Shaw, Mitch (March 4, 2021). "After decade of planning and prepping, construction begins on West Davis Corridor". Ogden Standard-Examiner. Retrieved May 20, 2021.
- ^ Shenefelt, Mark (January 1, 2023). "West Davis road project 60% complete; mid-2024 opening anticipated". Ogden Standard-Examiner. Retrieved February 12, 2023.
- ^ O'Donoghue, Amy Joi (March 28, 2023). "West Davis Corridor is 70% complete and slated for 2024 opening". Deseret News. Retrieved November 3, 2023.
- ^ Jones, Derrick (September 20, 2023). "The West Davis Highway is set to finish early". KSL NewsRadio. Retrieved November 3, 2023.
- ^ Jacobson, Matthew (October 24, 2023). "UHP identifies worker killed in West Davis Corridor crane collapse; project comes to halt". KUTV. Retrieved November 3, 2023.