Xiju station (Chinese: 西局站; pinyin: Xījú Zhàn) is a station on Line 10 and Line 14 of the Beijing Subway.[1][2] It opened on December 30, 2012.[3] Line 14 service began on May 5, 2013,[4][5] and Xiju serves as the eastern terminus of Line 14's western section until December 31, 2021, when the remaining section of Line 14 from Xiju to Beijing South Railway Station opened that day.
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Fengtai North Road (丰台北路) and Xiju West Road (西局西路) Fengtai District, Beijing China | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited (Line 10) Beijing MTR Corporation Limited (Line 14) | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | December 30, 2012 (Line 10) May 5, 2013 (Line 14) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Station layout
editBoth the line 10 and line 14 stations have underground island platforms.
Exits
editThere are 6 exits, lettered A, B, C, E, F, and G. Exits A, C, E, and F are accessible.
Gallery
edit-
Line 10 concourse
-
Line 14 concourse
References
edit- ^ "北京造价网". Archived from the original on November 1, 2014. Retrieved January 3, 2013.
- ^ "北京分钟寺到石榴庄公交线路,北京石榴庄到分钟寺公交线路,公交车,公交站点查询,北京分钟寺到石榴庄怎么走,乘几路车,北京石榴庄到分钟寺怎么走,乘几路车". Archived from the original on April 16, 2014. Retrieved November 21, 2012.
- ^ 轨道交通四条新线12月30日开通试运营 (in Simplified Chinese). Beijing Municipal Transportation Administration Bureau. Retrieved 29 December 2012.
- ^ http://www.bjghw.gov.cn/web/gdjt/map_3.html [dead link ]
- ^ http://zhengwu.beijing.gov.cn/bmfu/bmts/t1218838.htm [dead link ]
39°52′00″N 116°18′14″E / 39.86677°N 116.303819°E