Yankees–East 153rd Street station

Yankees–East 153rd Street station is a commuter rail stop on the Metro-North Railroad's Hudson Line, serving Yankee Stadium and the Concourse neighborhood in the Bronx, New York City. It opened on May 23, 2009, and provides daily local service on the Hudson Line.

Yankees–
E. 153rd Street
View of tracks and platforms at the Yankees-East 153rd Street station
General information
LocationExterior Street, Concourse, Bronx, New York
Coordinates40°49′31.35″N 73°55′48.96″W / 40.8253750°N 73.9302667°W / 40.8253750; -73.9302667
Owned byMetro-North Railroad
Line(s)Hudson Line
Platforms2 island platforms
Tracks4
Connections New York City Subway:
"4" train"B" train"D" train at 161st Street–Yankee Stadium
Local Bus New York City Bus: Bx6, Bx6 SBS, Bx13
NY Waterway (special event service)
SeaStreak (special event service)
Construction
AccessibleYes
Other information
Fare zone2
History
OpenedMay 23, 2009
Electrified700V (DC) third rail
Passengers
2018519 (non-gameday) (Metro-North)
Rank73 of 109[1]
Services
Preceding station Metro-North Railroad Following station
Morris Heights Hudson Line Harlem–125th Street
(to Highbridge Facility, staff-only)
Location
Map

The station is used during New York Yankees baseball games and New York City FC soccer matches at Yankee Stadium. There is also special service branded "Yankee Clipper" for Yankee games. Selected trains on the Harlem and New Haven lines also stop at this station on game days.[2]

Shuttle trains and Hudson Line trains also transport fans between the stadium and Grand Central Terminal,[3] helping to reduce traffic on the subway lines used to connect to New Jersey Transit and Long Island Rail Road trains at Penn Station.

History

edit

The project was promoted for several decades, and was included in the MTA's annual budget since the 1980s. Despite being part of the old Yankee Stadium renovation plan during the 1970s, plans for the station did not go ahead until the impetus from new Yankee Stadium.[4] Metro-North's Hudson Line had active track near the site. Some connections needed to be altered to provide New Haven Line and Harlem Line service.

 
Didi Gregorius, Rob Refsnyder, Nick Goody, and Ronald Torreyes at the station.

The station was designed to serve three Metro-North lines (Hudson, Harlem and New Haven) via existing track connections that were not normally used for passenger service.

The MTA estimated that the project would cost $91 million, including $52 million that it will provide and $39 million that will be provided by New York City.[5] The MTA paid for the new station with $40 million from an account set aside to build a new subway connection to LaGuardia Airport that was canceled due to local community opposition,[6] and $5 million from an existing account that had money set aside for new Yankee Stadium station in prior budgets.[citation needed] It opened on May 21, 2009, a month after the new Yankee Stadium's opening on April 2.[7]

Transit watchdog groups claimed the money to construct the station would have to be diverted from other MTA transportation projects in the region. Several groups have urged the Yankees to pay for part, if not all, of the station's cost, since the Yankees would be the prime beneficiary of the station. The Yankees have said the Metro-North project is separate from their stadium project.[citation needed]

Station layout

edit

The station has two high-level island platforms each 10 cars long. Yankee Clipper trains that use the wye at the Mott Haven interlocking only operate on game days.[8]: 1 

In 2018, track maintenance prevented direct Harlem Line and New Haven Line service from operating to the station, forcing riders to transfer at Harlem–125th Street to access Yankee Stadium. In 2019, only New Haven Line service used the wye.[9][10]

References

edit
  1. ^ METRO-NORTH 2018 WEEKDAY STATION BOARDINGS. Market Analysis/Fare Policy Group:OPERATIONS PLANNING AND ANALYSIS DEPARTMENT:Metro-North Railroad. April 2019. p. 6.
  2. ^ Halbfinger, Caren (October 29, 2006). "New Yankee Stadium train station to lure suburban fans". The Journal News. p. A.1.
  3. ^ Game Day Service Schedule, MTA Metro-North Railroad, Retrieved May 17, 2009.
  4. ^ "Metro-North to build Yankee Stadium station". New York Daily News. The Associated Press. May 21, 2007. Archived from the original on September 30, 2007. Retrieved November 3, 2007.
  5. ^ "Metro-North, NYC Hit Home Run; Yankee Stadium Station Slated for '09 Opening" (Press release). Metro-North Railroad. May 21, 2007. Archived from the original on December 27, 2007. Retrieved November 27, 2007.
  6. ^ Toscano, John (July 16, 2003). "N Train Extension To LaG Scrapped". Queens Gazette. Archived from the original on March 30, 2004. Retrieved July 26, 2009.
  7. ^ "MTA Metro-North Railroad To Open New Train Station in New York City To Serve Southwest Bronx and Yankee Stadium" (Press release). Metro-North Railroad. May 21, 2009. Archived from the original on December 18, 2010. Retrieved February 21, 2010.
  8. ^ "Metro-North Railroad Track & Structures Department Track Charts Maintenance Program Interlocking Diagrams & Yard Diagrams 2015" (PDF). Metro-North Railroad. 2015. Retrieved January 28, 2019.
  9. ^ "2018 New York City Football Club "Train to the Game" Game-Day Service". Metropolitan Transportation Authority. Retrieved April 30, 2020.
  10. ^ "Yankees-E. 153rd Street Station". Metropolitan Transportation Authority. Retrieved April 30, 2020.
edit