The 71-628 is a Russian fully low-floor tram model built by Ust-Katav Wagon-Building Plant since 2020. The tram is based on the unrealised 71-625 project and is a development of the partially low-floor 71-623 tram.

71-628
71-628 in Taganrog, Russia
ManufacturerUKVZ
AssemblyUst-Katav
Family name71-628
Constructed2021-
Entered service2021-
Number built8
CapacityMax: 166
Nominal: 116
OperatorsLLC 'Sinara-GNR Taganrog'[1]
Specifications
Car length16,500 mm (54 ft 2 in)
Width2,500 mm (8 ft 2 in)
Height3,700 mm (12 ft 2 in)
Low-floor100%
EntryLow floor
Doors4 (2 double leaf, 2 single leaf)
Wheel diameter620 mm (24 in)
WheelbaseBogie: 1,800 mm (71 in)
Maximum speed75 km/h (47 mph)
Weight22,000 kg (48,502 lb)
Engine typeAsynchronous motors
Tractive effort248 kW
HVACAir conditioned
Electric system(s)550V
Braking system(s)Disc brakes, track brake
Seating33
Track gauge1,524 mm (5 ft)
Notes/references
[2]

History and design

edit

The design of the tram traces back to the 71-623, which was a 40% low floor tram, that entered service in January 2008, although the desires for a fully low floor tram date to 2002, when UKVZ had intended to launch the serial production of the 71-625.[3] Again, in 2013, it was planned to build a fully low floor tram by the end of the year,[4] which did not materialise. In 2014, when the bogie for the tram was ready, UKVZ broke relationships with its trading house due to a change in management, which owned the patents on the design of the bogies. The design would be applied in the 71-911, developed by PC Transport Systems on the basis of the bogie for the 71-625, which the former director of the trading house, Felix Vinokur had joined.[5] With the loss of the bogie design, UKVZ suffered setbacks in fully low floor tram production.

From 2015 to 2019, two fully low floor, three section articulated tram 71-633 was built,[6] however, it proved a failure, with the trial tram provided to Chelyabinsk breaking down on its first run in the city.[7] Although problems were quickly rectified within a few days as the tram had an onboard computer that recorded failures,[8] it had too high demands for the quality of the track and was unsuitable for the majority of Russian tram networks. The same tram model had also been tested in Saint Petersburg, where it had been rejected.[9]

New low floor tram

edit

Eventually, in 2021, the new 71-628 was formally presented at Chelyabinsk.[8] The tramcar uses two swivelling bogies on a two-stage suspension,[10] and has support for visually and hearing impaired passengers.[11] The tramcar has air conditioning, thermal curtains for doors, mood lighting,[2] WiFi, individually heated seats, anti-corrosion lining on the side and USB charging sockets. The tramcar interior features environmentally friendly materials.[12]

Orders

edit

Moscow

edit

Despite not competing in the contract for 90 low-floor, single section trams for Moscow, UKVZ ultimately became the supplier to the contract,[13] as while Sinara Transport Machines had contested the contract, they did not actually have any suitable vehicles; they were originally planned to be built in a joint venture with Škoda Transportation that had been agreed upon in December 2019 but no vehicles have yet to be built under this joint venture. Without an adequate vehicle, Sinara tried to engage with Uraltransmash (which had its own low-floor tram model 71-415), but were unable to reach an agreement. The contract had only fixed the total number of vehicles, but not the actual type, so Sinara was able to negotiate with UKVZ to build the trams. 50 trams are to be delivered by the end of 2021, and all 90 by April 2022.[14] With these deliveries, it is planned to retire all trams built under the Soviet Union.[15] The trams are the 71-628M variant, which will feature a different exterior, have wheel lubricators and autonomous running for at least 1 km, although the delivery date has then been changed to 'by the end of next year'.[16][17]

The contract between Moscow Metro and Sinara was cancelled on 23 November 2021, due to the failure of Sinara to deliver the trams on time. 30 tramcars were to be delivered by the end of November, while only 1 was delivered in September, and the only car delivered was not accepted for service.[18] As a result of this, a new tender for 90 tramcars was called.[19]

Taganrog

edit

60 trams are to be supplied to Taganrog for the renewal of its tram network with 10 sent in 2021,[20][21] under an agreement with Sinara Group, which also includes repairs, installation of new rails and operation of the network. The trams are to be painted in red and white.[22] The first tram arrived on 23 July 2021.[1]

Another 40 trams were ordered, to be delivered in 2023.[23]

Chelyabinsk

edit

The number of 71-628 trams to be purchased has to be finalised due to the need to eliminate defects,[24] but the test vehicle, in a long-standing tradition of operating the first vehicle of each type produced by UKVZ, will be sold to the city after issues are resolved and the car is painted in the city's livery,[25] although other sources say that it may only return if an order is placed for the same model.[26]

30 tramcars were ordered in 2022, after a meeting between Rogozin and Texeler, the mayor of Chelyabinsk.[27]

Production and service

edit
City Model Number on balance sheet Total orders Years of service Notes
Taganrog 71-628 10 60 (up to 2022)[28] and 40 (2023)[23] 2021- Operated under a concession by LLC 'Sinara-GNR Taganrog'
Moscow 71-628M 0 90 (cancelled)[14] Different design, contract cancelled
Chelyabinsk 30[27] To be delivered in 2022

References

edit
  1. ^ a b "Roster Taganrog, OOO "SINARA - GNR TAGANROG"". transphoto.org. Retrieved 25 July 2021.
  2. ^ a b "Serial models | Ust-Katav car-building plant". www.ukvz.ru. Retrieved 2021-07-24.
  3. ^ "Усть -катавские машиностроители осваивают производство трамвайных вагонов, не имеющих аналогов в СHГ". uralpress.ru. Archived from the original on 2016-03-05.
  4. ^ "Трамваестроители сохранили производственный потенциал". ukn74.ru. Archived from the original on 2013-10-29.
  5. ^ "Тверской вагонзавод осваивает производство современных трамваев". ТИА (in Russian). Retrieved 2021-07-22.
  6. ^ "71-633 — Roster". transphoto.org. Retrieved 2021-07-24.
  7. ^ "Теперь синенький: в Челябинск пригнали новый низкопольный трамвай, но опять ненадолго". 74.ru (in Russian). 2021-01-16. Retrieved 2021-07-24.
  8. ^ a b "В Челябинске запускают новый трамвай с "гармошкой". Во время теста он забуксовал". 74.ru (in Russian). 2019-09-10. Retrieved 2021-07-24.
  9. ^ "На УКВЗ прояснили судьбу трамвая с "гармошкой", "заглохшего" во время тест-драйва в Челябинске". 74.ru (in Russian). 2019-10-03. Retrieved 2021-07-24.
  10. ^ Кондрашов, Матвей (2021-07-21). ""Я на этих трамваях еще в 80-е в школу ездил" Во сколько Челябинску может обойтись тотальное обновление электротранспорта?". obzor174.ru (in Russian). Retrieved 2021-07-26.
  11. ^ "Для Челябинска закупят 200 новых трамваев. Текслер прокатился на одном из них". 74.ru (in Russian). 2021-02-12. Retrieved 2021-07-24.
  12. ^ "Губернатор Ростовской области прокатился на новом трамвае УКВЗ". tramuk.ru (in Russian). Retrieved 2021-07-30.
  13. ^ 2021-01-26T11:00:00. "Sinara to supply Moscow with UKVZ trams". Railway Gazette International. Archived from the original on 2021-01-26. Retrieved 2021-09-14.{{cite web}}: CS1 maint: numeric names: authors list (link)
  14. ^ a b "В Москве появятся трамваи нового типа". Ведомости (in Russian). 30 March 2021. Retrieved 2021-07-25.
  15. ^ "В МОСКВЕ ПОЯВЯТСЯ 90 НИЗКОПОЛЬНЫХ ТРАМВАЕВ НОВОГО ТИПА". 2021-03-31. Archived from the original on 2021-04-20.
  16. ^ "Дептранс Москвы💉". Telegram, Depttrans Moscow. Archived from the original on 2021-07-25. Retrieved 2021-07-25.
  17. ^ 2021-06-11T05:00:00. "Design of Moscow's next tram unveiled". Railway Gazette International. Archived from the original on 2021-06-11. Retrieved 2021-09-14.{{cite web}}: CS1 maint: numeric names: authors list (link)
  18. ^ "Метро Москвы расторгло контракт на поставку трамваев от СТМ". ПРАЙМ (in Russian). 2021-11-23. Retrieved 2022-03-13.
  19. ^ "В Москве расторгнут крупный трамвайный контракт, Красноярск, Калининград и Нижний Новгород ждут свои вагоны". TR.ru — Транспорт в России (in Russian). 2021-11-25. Retrieved 2022-03-13.
  20. ^ "Первый новый красный вагон для Таганрога отправили из Челябинской области". don24.ru (in Russian). Retrieved 2021-07-25.
  21. ^ 2021-07-29T05:00:00. "First tram delivered for Taganrog network modernisation". Railway Gazette International. Archived from the original on 2021-07-29. Retrieved 2021-09-14.{{cite web}}: CS1 maint: numeric names: authors list (link)
  22. ^ "В Таганрог направили первый вагон для обновленной трамвайной сети". rostov.aif.ru (in Russian). 2021-07-20. Retrieved 2021-07-25.
  23. ^ a b "УКВЗ договорился с "Синарой" о поставке 90 трамваев". www.kommersant.ru (in Russian). 2022-02-08. Retrieved 2022-03-13.
  24. ^ "Новый замминистра миндортранса Челябинской области первым прокатился на новом трамвае". Новости Челябинска и Челябинской области (in Russian). 2021-01-27. Retrieved 2021-07-25.
  25. ^ Филатова, Мария (2021-02-12). "Он уйдет, но обещает вернуться В Челябинске презентовали очередной трамвай". obzor174.ru (in Russian). Retrieved 2021-07-25.
  26. ^ Пономаренко, Павел (15 June 2021). "Из Челябинска увозят обратно на завод единственный новый трамвай". chel.dk.ru (in Russian). Retrieved 2021-07-27.
  27. ^ a b Пономаренко, Павел (15 February 2022). "Текслер обсудил с Рогозиным закупки трамваев на заводе "Роскосмоса" в Челябинской области". chel.dk.ru (in Russian). Retrieved 2022-03-13.
  28. ^ "Новости. Первый трамвай производства УКВЗ прибыл в Таганрог". www.roscosmos.ru. Retrieved 2021-07-30.
edit