ALPAL-2 is a submarine telecommunications cable system in the Mediterranean Sea linking Algeria and the Spanish Balearic island of Majorca.
It has landing points in:
It has a design transmission capacity of 160 Gbit/s, starting operation at 5 Gbit/s and a total cable length of 312 km. It started operation in July 2002.
References
edit- "www.lightreading.com/document.asp?doc_id=18868". Retrieved February 19, 2006.