The Albert Park tunnels are found largely beneath Albert Park, in central Auckland, New Zealand. The tunnels were constructed as air raid shelters during the Second World War. At the conclusion of the war they were sealed to prevent vandalism or misuse by the public, and as a protection against carbon dioxide build-up or tunnel collapse.

Scan of engineering blueprint of the #4 air conditioning shaft and engine room. Illustrations on blueprint carried out by Auckland City Council heritage management staff members following a soil subsidence into a cavity below the concrete blast cap

Conception

edit

New Zealand's involvement in the war began in 1939, and with Axis naval activity occurring in New Zealand waters, domestic defence plans were necessary, with much capital being invested. Matters became urgent with the entry of Japan into the war in 1941.

A number of coastal defences were already in place throughout the country, with a concentration in Auckland, and Auckland City Council felt the need for air raid shelters in the central city, in preparation for Japanese attack. Work began in December 1941, and by January 1942, 16,300 feet of slit trenches had been dug around the city.[1] Additional shelters were created in basements, the Domain, Grafton Gully, and the old Parnell railway tunnel.[2]

Auckland city centre had a daytime population of 70,000, but by April 1942 shelter capacity was only 20,000.[2] Furthermore, experience in Britain during the Blitz indicated that deep shelters provided greater protection.[2] Due to its topography and central location, Albert Park – a communal facility built in the 1880s on the site of an 1840s army barracks[3] – was chosen as the site for a major construction. In 1942 a large complex of tunnels and shelters was established under the park,[4] capable of sheltering 20,400 people.[5]

The tunnels were designed by city engineer James Tyler, and were estimated to cost £120,000 (about £6 per head), with £90,000 of the cost met by the government and the rest by Auckland City. With planned shifts running twenty-four hours, the work was expected to take four to six months.[2] Work began in February, with up to 300 men in gangs working three shifts a day six days a week, and the digging was completed in August.[6] Carpentry and plumbing, at additional cost, was added over the following two months.[6] The tunnels were officially opened by Mayor John Allum in October 1942.

Construction and structure

edit
 
Map of the Albert Park tunnels

There are more than 3.5 kilometres (2.2 mi) of tunnels,[7] reaching from Constitution Hill to Wellesley Street, involving a network of shelters, sanitation facilities and first aid posts, all ventilated by air shafts,[8] with a total of nine entrances.[6] The tunnels run through sandstone and volcanic rock, and were mainly dug by hand by a team of 114 council workers, most of whom were middle-aged men who were unfit for war. The tunnels were lined with over 975 km of New Zealand native timber, including Kauri, Heart Rimu, Larch and New Zealand Stringy Bark.[5] A total of 315 people were involved with this project.[6]

The central, arched access tunnels were 9 ft high (2.7 m), 15 ft wide (4.6 m), and 3,700 ft long (1,100 m); the grid of accommodation galleries – totalling 6,000 ft (1,800 m) – were 7 ft (2.1 m) square and provided with wooden seating.[6] The floors were covered with scoria.[6]

The tunnel complex, unlike many other air raid shelter complexes, does not have blast doors, but instead has baffles. The baffle is a block in a tunnel constructed from wood, lead and stone to absorb the shock wave in the event of a bomb blast. The small tunnels around them allowed passage and reduced the shock with the perpendicular reflections.[citation needed]

A diesel engine from an old meatworks powered the ventilation fans and emergency lighting,[6] as well as a loud-speaker system.[5]

Postwar history

edit

The expected air raids did not happen, and with the tunnels unused, by the end of 1943 the timber supports were beginning to fail. By February 1945, without the money to upgrade or convert the tunnels to other use, plans were made to fill them in.[9] The tunnels were filled in with 8.8 million unfired clay blocks made by Crum Brick and Tile in New Lynn. It took 15 men a total of 12 months to complete the back-filling process and the entrances were sealed and buried by 18 April 1946.

Since then, a number of schemes have been proposed to make use of reopened tunnels. In the 1960s there were newspaper articles proposing ideas, and interest was renewed in the 1990s by two groups: a businessman seeking to open them as a tourism venture, and a group of architecture students with their lecturer who considered the tunnels might offer a solution to Auckland's traffic problems.[10]

In 1996, the city council signed a contract with tourism promotor William Reid, giving him permission to unseal the tunnels and perform an inspection, with a view to developing a tourist attraction.[8] Related legislation was passed in 2001.[11]

In 2005, subsidence occurred within the park, due to the collapse of in-fill soil within the old ventilation shafts.[12] Blocked entrances can be seen at the top of Victoria Street – hidden by a decorative wall – and the steel door present at the foot of Constitution Hill.[5] Three other blocked entrances are located behind the Park's Gateway sculpture.[13]

As of June 2012, two Auckland residents Bill Reid and Mark Howarth, were working on plans to have the first 25m of tunnel five excavated in order to create a museum depicting its history. However, Auckland Council advised that no investigations had been carried out with regards to work required to reopen the tunnels.[14]

In January 2017, Reid was engaged in meetings with Auckland Tourism, Events and Economic Development (ATEED) and campaigning for the tunnels to be reopened as a tourist attraction and as a direct link for walkers and cyclists between Victoria Street and Parnell.[15]

Notes

edit
  1. ^ Taylor, Nancy M (1986). The New Zealand People at War - The Home Front. Vol. 1. p. 511. ISBN 0-477-01259-0.
  2. ^ a b c d Taylor, Nancy M (1986). The New Zealand People at War - The Home Front. Vol. 1. p. 517. ISBN 0-477-01259-0.
  3. ^ Clough, Rod (PhD); Albert Park Conservation/Management Plan: Archaeological Assessment, Clough & Associates, Auckland, 1996
  4. ^ "Auckland City Council: Albert Park". Aucklandcity.govt.nz. Archived from the original on 5 February 2012. Retrieved 17 June 2012.
  5. ^ a b c d "Heritage Walks: The Engineering Heritage of Auckland" Archived 14 October 2008 at the Wayback Machine by Elizabeth Aitken Rose and the Auckland Engineering Heritage Committee of IPENZ. ISBN 0-908960-46-8
  6. ^ a b c d e f g Taylor, Nancy M (1986). The New Zealand People at War - The Home Front. Vol. 1. p. 518. ISBN 0-477-01259-0.
  7. ^ "Auckland GenWb: Albert Park Tunnels". Rootsweb.ancestry.com. Retrieved 17 June 2012.
  8. ^ a b "Albert Park Tunnels Agreement Signed", SCENE, 4 March 1996 Archived 7 September 2006 at the Wayback Machine
  9. ^ Taylor, Nancy M (1986). The New Zealand People at War - The Home Front. Vol. 1. p. 573. ISBN 0-477-01259-0.
  10. ^ Exploration by the Intrepid Binary Brothers Archived 7 September 2006 at the Wayback Machine
  11. ^ New Zealand Government Website "Access to Albert Park tunnels included in new legislation", 9 October 2001.
  12. ^ "Investigation into subsidence in Albert Park" Wednesday, 19 October 2005, 12:56 pm Press Release: Auckland City Council
  13. ^ "Aotearoa Cam: Albert Park". Archived from the original on 28 August 2008. Retrieved 4 July 2008.
  14. ^ Amy Maas. "Bid to reopen Albert Park tunnels". Stuff.co.nz. Retrieved 17 June 2012.
  15. ^ "Reopening of Albert Park tunnels 'will happen', advocate says". Stuff.co.nz. 26 January 2017. Retrieved 12 May 2017.

References

edit
edit

36°51′05″S 174°46′01″E / 36.8514°S 174.767°E / -36.8514; 174.767