The BRT Federal Line was a proposed bus rapid transit for Kuala LumpurKlang Corridors, and it has been identified in the KL BRT Report 2011 as one of the potential BRT Corridors in the Klang Valley region. The BRT project was planned to be operational by 2018,[1][2][3][4][5][6] but is now shelved indefinitely.[7] The government cited "redundancies with the LRT3 (Shah Alam Line)" as the reason for its decision to cancel the project.[8]

BRT Federal Line
B2
The proposed BRT station and busway along the Federal Highway at Asia Jaya.
Overview
Native nameLaluan BRT Persekutuan
StatusShelved in 2017; 7 years ago (2017)
Line numberB2 (Purple)
LocaleKlang Valley
Termini
Stations24[1]
Service
TypeBus rapid transit
SystemHybrid System (combination of Direct Service, Trunk and Feeder)
ServicesPhase 1A : Pasar SeniKerinchi
Phase 1B : Petaling JayaSubang Jaya
Phase 2 : Shah AlamKlang
Daily ridership600,000 daily (expected)[1]
Technical
Line length32.52 km (20 mi)[1]
Route map

Designed to complement existing bus and rail transport networks, the BRT Federal line was to employ all-electric buses similar to BRT Sunway Line, however at ground level.

Background and history

edit

According to a World Bank Report, the Klang-Shah Alam-Petaling Jaya corridor has nearly a million private vehicles travelling on the Federal Highway daily during morning peak hours.[1] Transport Minister, Liow Tiong Lai has proposed the BRT KL-Klang line to ease the congestion.[9] Unlike the BRT Sunway Line, the BRT KL-Klang will be on ground level.[9]

Prime Minister, Najib Razak has allocated RM 1.5 billion for the project during the 2016 Budget presentation.[10]

The BRT line is planned to be built in the middle of Federal Highway and the construction is expected to start in the third quarter of 2016.[1] Upon completion, about 80% of the BRT line will offer some form of connection with the LRT as well as KTM Komuter and will cut down travel times between Kuala Lumpur and Klang to 40 minutes from current 70 minutes.[11] This project was said to start from Q3-2016, but no progress has been done yet.

Although the Transport Minister, Liow Tiong Lai, said that the project would be finished in 2 or 3 years time,[12] it was confirmed to be shelved by the Economic Council, to "give priority to other transportation projects such as the high speed rail and the mass rapid transit".[13] The Land Public Transport Commission (SPAD) has also annulled the BRT tender as shown on their website.[14]

Timeline

edit

19 January 2017 - The Land Public Transport Commission (SPAD) invites bid for "comprehensive planning, design, finance, construction, operation, maintenance and upgrade" of the KL-Klang BRT project. [15]

24 November 2017 - The tender agreement by the Land Public Transport Commission was officially annulled.[14]

Route maps

edit

See also

edit

References

edit
  1. ^ a b c d e f "BRT KL-Klang line expected to be ready by 2018". Retrieved 6 November 2015.
  2. ^ "Bus Rapid Transit (BRT)". Archived from the original on 24 September 2013. Retrieved 20 September 2013.
  3. ^ "KL-Klang BRT service to start in March". Archived from the original on 2 April 2015. Retrieved 6 December 2014.
  4. ^ "Klang Valley folk now opting for public transportation to beat jams". Retrieved 13 May 2014.
  5. ^ "JKR - Perlaksanaan Projek dan Status Semasa BRT". Retrieved 29 July 2013.
  6. ^ "JKR - Status Semasa BRT". Retrieved 29 July 2013.
  7. ^ "RM2 billion KL-Klang bus lane project shelved indefinitely, says report | The Malaysian Insight". www.themalaysianinsight.com. Retrieved 28 November 2017.
  8. ^ "KL-Klang BRT scrubbed due to overlap with LRT3, says Putrajaya". MalayMail.com. Retrieved 28 November 2017.
  9. ^ a b "Prasarana awaits green light for BRT Federal Highway Line". Archived from the original on 4 March 2016. Retrieved 6 November 2015.
  10. ^ "Budget 2016: MRT, LRT extension, BRT, HSR updates". Retrieved 6 November 2015.
  11. ^ "Bus Rapid Transit (BRT) – KL-Klang line ready by 2018". Retrieved 6 November 2015.
  12. ^ "KL-Klang BRT service ready in two years, says Liow". Free Malaysia Today. Retrieved 31 May 2017.
  13. ^ "RM2b KL-Klang busway shelved". The Edge Markets. 24 November 2017. Retrieved 28 November 2017.
  14. ^ a b "Archived copy" (PDF). Archived from the original (PDF) on 1 December 2017. Retrieved 28 November 2017.{{cite web}}: CS1 maint: archived copy as title (link)
  15. ^ "SPAD Conducts Request For Proposal (RFP) To Implement The Bus Rapid Transit (BRT) Kuala Lumpur – Klang Project". Archived from the original on 2 February 2017. Retrieved 21 January 2017.
edit