Bara Dam is a proposed small, low-head, earth core rockfill, hydroelectric dam with a capacity of 5.8 megawatts, located across Bara River at the confluence of Mastura River in Tirah Valley, Khyber Agency, FATA, Pakistan.[1] It is part of a wider plan that consists in remodeling the Bara River, to promote agriculture.[2]

Bara Dam
Bara Dam is located in Pakistan
Bara Dam
Location of Bara Dam in Pakistan
CountryPakistan
LocationTirah Valley, Khyber Agency, FATA
Coordinates33°58′N 71°01′E / 33.967°N 71.017°E / 33.967; 71.017
PurposeIrrigation, power
StatusProposed
Construction cost$311 million
Owner(s)WAPDA
Dam and spillways
Type of damEarth core rockfill
ImpoundsBara River
Height92 m (302 ft)
Length450 m (1,477 ft)
Reservoir
Total capacity105 million m3
Power Station
Operator(s)WAPDA
Installed capacity5.8 MW
Annual generation11 GWh

Construction, which had not started yet as of late 2019, is expected to last 5 years.[3]

The estimated cost of the project is US$311 million (Rs. 14.2 billion[3]), out of which $227 million for civil works and $28 million for electro-mechanical works are required.[1]

Main uses

edit

With the construction of the proposed Bara Dam, flood waters of Bara River will be stored. Gross storage of the reservoir is 105 million cubic metres (85,363 acre⋅ft) of which an average of about 110 million cubic metres (89,000 acre⋅ft) of water will be annually available for developing irrigated agriculture of command area of about 17,000 hectares (42,000 acres). This project will produce 5.8 MW of power with an annual energy output of 36 TJ (10 GW⋅h).

Other benefits

edit

Damming the flow of Bara River will save the flood water for irrigated agriculture development, power generation and water supply for drinking and other domestic uses. The project will bring general uplift of the people in the area by creation of employment and business opportunities. These indirect benefits, such as employment opportunities and consequent rise in the living standard of the people, however cannot be quantified in monetary term. The direct receipt of the project will be available in shape of irrigation service fee (Abiana) and receipt of cost of sale of energy to consumers. The project would greatly increase the development of fisheries in the area and provide recreation and employment opportunities to the residents of the area.

Current status

edit
  • Feasibility Study completed in 2008.[3]
  • PC-I approved by ECNEC on 3 September 2009.
  • Tenders of Bara Dam on EPC basis invited on 9 October, 5 November, 19 December 2009, 8 April 2010. No bid received.
  • WAPDA appointed consultants for preparation of Project Planning Report and Tender Documents based on Detailed Engineering Design to invite Tenders on measurement (BOQ) basis.
  • Detailed Engineering Design of the Project completed in December, 2011.
  • Detailed Level EIA and RAP Studies are in Progress.
  • Tenders for construction will be invited on finalization of Project Planning Report and Tender Documents and on availability of funds for the Project.[4]
  • In 2019, government proposed to allocate Rs 230 million to initiate the project by 2020.[2][5]

See also

edit

References

edit
  1. ^ a b "Archived copy" (PDF). Archived from the original (PDF) on 3 March 2013. Retrieved 16 April 2014.{{cite web}}: CS1 maint: archived copy as title (link)
  2. ^ a b "KP to construct two dams, remodelling of Bara River in Khyber district". The Nation. 3 November 2019. Retrieved 22 April 2020.
  3. ^ a b c "Bara Dam Project". www.wapda.gov.pk. Retrieved 22 April 2020.
  4. ^ "Bara Dam Project". Archived from the original on 10 June 2012. Retrieved 7 July 2012.
  5. ^ "KP Irrigation Dept completed 44 projects in one year: report". www.thenews.com.pk. Retrieved 22 April 2020.